HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-01-18-5074 & SEPT-OL-18-507s
Hunting Maestro LLC
New SF Residence
TBD Ute Stock Drive - Rifle, Colorado
Big Mountain Ranch
1) ALL WORK SHALL COMply W|TH 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.)AND
2009 I NTERNATIONAL EN ERGY CONSERVATION CODE (1. E.C.C. )
2) TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED
,,GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) INSPECTOR TO VER|Fy THAT EX|STTNG ONE-STORY CABIN DOES NOT CONTAIN KITCHEN
AND/OR BATHROOM(S)AND DOES NOT CONSTTTUTE A RESIDENTIAL DWELLING UNIT.
ALTERNATELY, IF EXISTING CABIN FITS GARFIELD COUNTY,S DEFINITION OF ACCESSORY
DWELLING UNIT, THEN A LAND-USE CHANGE PERMIT MAY BE REQUIRED.
4) TNSTALLATTON OF STRATGHT-SHAFT DRTLLED PIER FOUNDATION SVSTEM TO FOLLOW
RECOM M EN DATTONS CONTAT N ED r N G EOTECH N ICAL REPORT {PROJ ECT #16-7 -485.011
AS PREPARED By Hp-KUMAR AND DATED 12/ttlL7. SOILS ENGINEER OF RECORD SHALL
BE PRESENT AT JOB SITE DURING PIER DRILLING TO VERIFY THAT BEARING STRATA HAS
BEEN REACHED AND MINIMUM REQUIREMENTS CONTAINED IN THIS REPORT ARE MET.
PROVIDE SOILS ENGINEER,S SEALED APPROVAL REPORT FOR CONCRETE PIER FOOTINGS
AT FOUNDATION WALL INSPECTION.
5) OPEN HEARTH WOOD-BURNtNG FTREPLACES NOT ALLOWED PER l.E.C.C., SECTION
402.4.3 AS FOLLOWS: "NEW WOOD-BURNING FIREPLACES SHALL HAVE GASKETED
DOORS AND OUTDOOR COMBUSTION AIR.,,
6) VER|Fy REQUTREMENTS AND COORDTNATE INSPECTIONS OF FUTURE VERTICAL LIFT
WITH NORTHWEST COLORADO COUNCIL OF GOVERNMENTS, (NWCCOG) ELEVATOR
INSPECTION PROGRAM. PROVIDE FINAL SIGN-OFF/APPROVAL AT FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY.
7) ouTDooR spA SHALL COMply W|TH 20L5 INTERNATIONAL SWIMMING POOL & SPA
coDE, tNcLUDtNG BARRTER REQUTREMENTS (SECTION 305), LADDERS & RECESSED
TREADS (SECT|ON 322)AND SAFETY (SECTTON 323). ALSO COMPLY WITH 201s LR.C.
(CHAPTER 42) &MANUFACTURER'S INSTALLATION REQUIREMENTS.
s) ELECTRICAL PERMtTTtNG AND INSPECTTONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.