HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-02-18-5099 and SEPT -02-18-5100
Parachute Battlement Mesa Park & Recreation District
Public Restrooms/Storage Building and Vault Toilet at Community Park
TBD Sipperelle Drive — Parachute, Colorado
1) BUILDINGS AND RELATED SITE WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING
CODE (I.B.C.), 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.), ACCESSIBILITY
STANDARD ICC/A117.1-2009, AND MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE-
MENTS, DESCRIPTION OF PLAN REVIEW COMMENTS AND INSPECTIONS POLICIES.
3) ALL WORK SHALL COMPLY WITH BATTLEMENT MESA PUD'S "BUSINESS CENTER" (B.C.) ZONE
DISTRICT REGULATIONS.
4) BUILDINGS ARE APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION WITH OCCUPANCY
GROUP "U" (UTILITY & MISCELLANEOUS) USE.
5) VERIFY COMPLIANCE WITH EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10 INCLUDING:
A. DOOR HARDWARE, LOCKS, LATCHES & LANDINGS AT DOORS -SECTION 1010.
B. EXITS -SECTIONS 1022, 1024, 1027, 1028
C. STAIRS, RAMPS, LANDINGS, RAILINGS AND HANDRAILS - CHAPTER 10
6) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., INCLUDING:
A. ACCESSIBLE MEANS OF EGRESS -SECTION 1009
B. ACCESSIBLE ROUTE - SECTION 1104 & ICC/A117.1-2009, CHAPTER 4
C. ACCESSIBLE ENTRANCES -SECTION 1105
D. PARKING & PASSENGER LOADING - SECTION 1106
E. SIGNAGE FOR PARKING SPACES & PUBLIC RESTROOMS - SECTION 1111
F. PLUMBING ELEMENTS & FACILITIES - ICC/A117.1, SECTIONS 603 THROUGH 609
7) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 IBC, CHAPTER 12.
8) TOILET & BATHROOM REQUIREMENTS PER 2015 IBC, SECTION 1210.
9) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND
CERTIFICATE OF OCCUPANCY.