Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-02-18-5099 and SEPT -02-18-5100 Parachute Battlement Mesa Park & Recreation District Public Restrooms/Storage Building and Vault Toilet at Community Park TBD Sipperelle Drive — Parachute, Colorado 1) BUILDINGS AND RELATED SITE WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (I.B.C.), 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.), ACCESSIBILITY STANDARD ICC/A117.1-2009, AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW COMMENTS AND INSPECTIONS POLICIES. 3) ALL WORK SHALL COMPLY WITH BATTLEMENT MESA PUD'S "BUSINESS CENTER" (B.C.) ZONE DISTRICT REGULATIONS. 4) BUILDINGS ARE APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION WITH OCCUPANCY GROUP "U" (UTILITY & MISCELLANEOUS) USE. 5) VERIFY COMPLIANCE WITH EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10 INCLUDING: A. DOOR HARDWARE, LOCKS, LATCHES & LANDINGS AT DOORS -SECTION 1010. B. EXITS -SECTIONS 1022, 1024, 1027, 1028 C. STAIRS, RAMPS, LANDINGS, RAILINGS AND HANDRAILS - CHAPTER 10 6) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., INCLUDING: A. ACCESSIBLE MEANS OF EGRESS -SECTION 1009 B. ACCESSIBLE ROUTE - SECTION 1104 & ICC/A117.1-2009, CHAPTER 4 C. ACCESSIBLE ENTRANCES -SECTION 1105 D. PARKING & PASSENGER LOADING - SECTION 1106 E. SIGNAGE FOR PARKING SPACES & PUBLIC RESTROOMS - SECTION 1111 F. PLUMBING ELEMENTS & FACILITIES - ICC/A117.1, SECTIONS 603 THROUGH 609 7) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 IBC, CHAPTER 12. 8) TOILET & BATHROOM REQUIREMENTS PER 2015 IBC, SECTION 1210. 9) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY.