HomeMy WebLinkAbout01.0 NarrativeASPEN VALLEY
POLO CLUB
ASPEN VALLEY POLO CLUB
PUD Amendment
Narrative
November 17, 2017
LAND
WEST
345 Colorado Ave. #106
Carbondale, CO 81623
970.379.4155
www.landwestcolorado.com
(this page intentionally blank)
Aspen Valley Polo Club
2 NARRATIVE — November, 2017
TABLE OF CONTENTS
1. LIST OF APPENDICES 5
2. CONSULTANT TEAM 7
3. OVERVIEW 9
3.1. PURPOSE OF PUD AMENDMENT 9
3.2. SITE BACKGROUND 10
3.2.1. Site Location 10
3.2.2. Prior Approvals 11
3.2.3. PUD Zoning 12
3.2.4. Existing Conditions & Use 13
4. DEMONSTRATION OF SUBMITTAL REQUIREMENTS 17
4.1. TABLE 2: APPLICATION SUBMITTAL MATERIALS 17
5. PROJECT DESCRIPTION 18
5.1. PROPOSED ZONING 18
5.2. ALLOWED LAND USES 19
5.3. LAND USE SUMMARY 19
5.3.1. Table 3: PUD Summary Table 19
5.4. COMMUNITY DESIGN 20
5.5. ZONE DISTRICT 1— PLAN ELEMENTS 21
5.5.1. Horse Barns & Maintenance Barn 21
5.5.2. Polo Fields 22
5.5.3. Clubhouse 22
5.5.4. Cabins 23
5.6. ZONE DISTRICT 2 — PLAN ELEMENTS 23
5.6.1. Residential Neighborhoods 23
5.6.2. Community Center 23
5.6.3. Greenhouse & Gardens 24
5.6.4. Park, Open Space & Trails 24
5.7. AFFORDABLE HOUSING 25
5.8. ACCESS & CIRCULATION 25
5.9. LANDSCAPING 26
5.10. UTILITIES 26
5.11. CONSTRUCTION PHASING PLAN 27
6. IMPACT ANALYSIS 28
6.1. ADJACENT LAND USE 28
6.2. SITE FEATURES 28
6.3. SOIL CHARACTERISTICS 29
6.4. GEOLOGY AND HAZARD 30
6.5. GROUNDWATER AND AQUIFER RECHARGE AREAS 30
6.6. ENVIRONMENTAL IMPACTS 31
6.6.1. Flora and Fauna 31
6.6.2. Designated Environmental Resources 32
6.6.3. Impacts on Wildlife and Domestic Animals 33
6.6.4. Potential Radiation Hazard 35
6.7. NUISANCE 35
Aspen Valley Polo Club
3 NARRATIVE — November, 2017
6.8. HOURS OF OPERATION 36
7. REZONING JUSTIFICATION REPORT 37
7.1. REVIEW CRITERIA 37
8. PUD PLAN 38
8.1. GENERAL DESCRIPTIONS 38
8.2. TECHNICAL DESCRIPTIONS 40
8.3. PUD PLAN MAP 42
8.4. PUD GUIDE 42
9. AMENDMENT JUSTIFICATION REPORT 43
9.1. AMENDMENT DESCRIPTION AND SUPPORTING INFORMATION 43
9.2. LUDC SECTION 6- 203.C. CRITERIA 43
10. RELATIONSHIP TO APPLICABLE LAND USE STANDARDS 44
10.1. GARFIELD COUNTY LUDC: ARTICLE 3 — ZONING 44
10.2. GARFIELD COUNTY LUDC: ARTICLE 7 - STANDARDS 44
10.2.1. Division 1: General Standards 44
10.2.2. Division 2: Resource Protection Standards 46
10.2.3. Division 3: Site Planning 47
11. RELATIONSHIP TO GARFIELD COUNTY COMPREHENSIVE PLAN 48
11.1. FUTURE LAND USE 48
11.2. URBAN GROWTH AREAS AND INTERGOVERNMENTAL COORDINATION 48
11.3. HOUSING 49
11.4. TRANSPORTATION 49
11.5. ECONOMICS, EMPLOYMENT AND TOURISM 49
11.6. RECREATION, OPEN SPACE AND TRAILS 50
11.7. AGRICULTURE 50
11.8. WATER AND SEWER SERVICES 51
11.9. NATURAL RESOURCES 51
11.10. MINERAL EXTRACTION 52
11.11. RENEWABLE ENERGY 52
Aspen Valley Polo Club
4 NARRATIVE — November, 2017
1. LIST OF APPENDICES
A Application Form
B Evidence of Ownership
C Adjacent Property Owners & Mineral Owners/ Lessees
D Vicinity Map & Zoning Map
E Improvement Survey Plat
F Site Plan & Proposed Zone District Map
G Engineering Report & Plans
H Water Supply & Rights
Landscape Plans
J Draft Improvements Agreement
K Traffic Impact Study & Access Permit Applications
L Floodplain Development Permit
M PUD Plan Map
N PUD Guide
O Statement of Authority
P Letter of Authorization
Aspen Valley Polo Club
5 NARRATIVE — November, 2017
(this page intentionally blank)
Aspen Valley Polo Club
6 NARRATIVE — November, 2017
2. CONSULTANT TEAM
APPLICANT WATER LAW
Aspen Polo Partners, LLP Corona Water Law
Contact: Peter Rizzo Contact: Craig Corona
3629 Aiken Ct. 420 East Main Street, Suite 210B
Wellington, FL 33414 Aspen, CO 81611
561.777.6448 970.948.6523
LAND PLANNING & LANDSCAPE ARCHITECTURE
LANDWEST Colorado, LLC
Contact: Jon Fredericks
345 Colorado Ave. #106
Carbondale, CO 81623
970.379.4155
GENERAL COUNSEL
Wright Law Aspen, LLP
Contact: Gary A. Wright
715 West Main Street, Suite 201
Aspen, CO 81611
970.925.5625
CIVIL ENGINEERING ARCHITECTURE
Roaring Fork Engineering Ward and Associates, Inc.
Contact: Richard Goulding Contact: Mark Ward
592 Highway 133 3223 Arapahoe Avenue, Suite 220
Carbondale, CO 81623 Boulder, CO 80303
970.340.4130 303.442.1201
TRAFFIC ENGINEERING
Fox Tuttle Hernandez Transportation Group
Contact: Cassie Slade
P.O. Box 19768
Boulder, CO 80308
303.652.3571
SURVEYING
True North Colorado, LLC
Contact: Rodney Kiser
1118 Bennett Avenue
Glenwood Springs, CO 81601
970.945.1105
GENERAL CONTRACTOR
Divide Creek Builders
Contact: Max Filiss
1531 County Rd. 342
Silt, CO 81652
970.963.3555
Aspen Valley Polo Club
7 NARRATIVE — November, 2017
(this page intentionally blank)
Aspen Valley Polo Club
8 NARRATIVE — November, 2017
3. Overview
3.1. Purpose of PUD Amendment
The Applicant is seeking a PUD Amendment for the property formerly known as TCI Lane Ranch in
eastern Garfield County near Catherine Store. The property is now being referred to as the "Aspen
Valley Polo Club PUD". The subject property is 100.44 acres in size, and is currently zoned PUD with
an approved PUD Guide and PUD Site Plan. This application seeks to replace the existing PUD Guide
and PUD Site Plan with the proposed PUD Plan, including a new PUD Guide and PUD Plan Map. This
PUD Amendment as proposed will allow the owners to develop the property with their envisioned
land uses and dimensional standards, consistent with the Garfield County Comprehensive Plan.
This application provides pertinent information for a PUD Amendment (Substantial Modification) as
required by the Garfield County Land Use and Development Code (LUDC) Section 6-301. As
proposed, the PUD consists of two distinct Zone Districts. In order to create efficiencies in the
review process, County staff has directed the Applicant to also include many of the typical
requirements of a Preliminary Plan submittal for the area encompassing Zone District 1. These
supplemental submittal materials will allow the County to evaluate the improvements that are
planned for Phase 1. This report demonstrates conformance with all applicable submittal
requirements, County Codes, Goals and Policies.
This PUD Amendment will be the first step in a three-part review process for the subject property, as
follows:
1) PUD Amendment — to confirm certain allowed uses and dimensional standards,
which will allow the Applicant to commence construction of facilities within Zone
District 1 in the early spring of 2018.
2) Preliminary Plan — to obtain approval for subdivision of the property based upon
approved allowed uses and dimensional standards. The Preliminary Plan application
is intended to be submitted for review in 2018, after approval of the PUD
Amendment.
3) Final Plat — to subdivide the property, following the terms and conditions of a
Preliminary Plan approval. It is anticipated that Final Plat will occur in 2019.
Aspen Valley Polo Club
9 NARRATIVE — November, 2017
3.2. Site Background
3.2.1. Site Location
The subject parcel (#2391-311-00-033) encompasses 100.443 acres, and is located south of
State Highway 82, approximately1/4 mile east of County Road 100 and Catherine Store. Access to
the parcel is from Old Highway 82, which is a frontage road owned and managed by CDOT.
There is one existing gravel driveway access to the site, which is located on the northern
property boundary connecting to Old Highway 82. The property has no direct connection to any
County road.
Figure 1:
Vicinity Map (full size version located in Appendix D).
ASPEN VALItY
Polo CLUB PARCEL
100.443 acres
10
Aspen Valley Polo Club
NARRATIVE — November, 2017
3.2.2. Prior Approvals
The property was the subject of many prior applications and approvals by the County, starting in
2007 with approvals for a Comprehensive Plan Amendment and Sketch Plan. In 2009, the BoCC
granted Preliminary Plan and PUD approval, which was followed by the approvals of several
minor revisions and Preliminary Plan extensions. The Preliminary Plan has since expired as of
September 8, 2017. However, the prior PUD zoning approvals and Floodplain Development
Permit remain in effect. Table 1 provides a chronological history of prior actions by the County
for the subject property.
Table 1. History of Prior County Actions.
Type
Resolution/ Permit #
Date
Description
Comprehensive Plan
Amendment
PC -2007-05
7/11/2007
Designation of "Residential High
Density" for property.
Preliminary Plan/ PUD
2009-71
9/8/2009
Original approval.
Preliminary Plan/PUD
2009-81
12/7/2009
Retract and replace Resolution
2009-71 to correct scrivener's error.
PUD Amendment
Land Use Change Permit
PDAA6269
2/9/2010
Administrative approval of text
amendment of PUD Guide to allow
"greenhouse" as a Use by Right.
Floodplain
Development Permit
Land Use Change Permit
FDPA6264
5/21/2010
Administrative approval of
development in floodplain.
Preliminary Plan
Extension
2010-57
7/19/2010
To allow a 1 -year extension until
9/8/2011, with the opportunity to
request additional extensions.
PUD Amendment
2010-101
12/20/2010
To convert five (5) voluntary
employee units to free market units
due to market conditions.
Preliminary Plan
Extension
TBD
7/11/11
To allow a 2 -year extension until
September 8, 2013.
Preliminary Plan
Extension
2013-58
9/3/2013
To allow a 2 -year extension until
September 8, 2015.
Preliminary Plan
Extension
2015-49
9/8/2015
To allow a 1 -year extension until
September 8, 2016.
PUD Guide Correction
2016-37
5/2/2016
To allow for a correction to
Resolution 2010-101.
Preliminary Plan
Extension
2016-59
9/12/2016
To allow a 1 -year extension until
September 8, 2017.
Preliminary Plan
Expiration
n/a
9/8/2017
The Preliminary Plan approval has
expired.
11
Aspen Valley Polo Club
NARRATIVE — November, 2017
3.2.3. PUD Zoning
The subject property is currently zoned PUD, with an approved PUD Site Plan and PUD Guide.
The current PUD zoning includes the following Zone Districts and associated land uses: Single
Family Residential; Duplex Residential; Community Utility; Community Center; Private Common
Open Space; and Conservation Easement.
Figure 2:
Existing Zoning Map (full size version located in Appendix D).
ASPEN VALLEY
POLO CLUB PARCEL
Existing PUD Zone District
Public Lands
r
Residential Suburban
Zoning ata SIMP ,egedil.
ouGarfield County Land Explorer
Aspen Valley Polo Club
12 NARRATIVE—November, 2017
3.2.4. Existing Conditions & Use
Prior uses of the property include ranching with irrigated meadows, and residential dwellings
(since removed). Three outbuildings currently exist that were at one time associated with typical
ranching operations: 1) a log barn; 2) a log shed; and 3) a log cabin (McClure cabin).
Figure 3:
Log barn.
Figure 4:
McClure cabin.
Aspen Valley Polo Club
13 NARRATIVE—November, 2017
The property also includes a modern greenhouse structure and gardens that were constructed
in 2010, and are have been in continuous operation for the past seven years growing organic
produce.
Figure 5:
Greenhouse and gardens.
The property is dominated by two primary vegetation communities. Irrigated pasture comprises
approximately one-half of the site, while cottonwood galleries dominate the other one-half. The
majority of the cottonwood galleries are adjacent to the Roaring Fork River where they are
associated with smaller quantities of spruce, ponderosa pine, and juniper. Some of the isolated
upland cottonwood galleries are the result of many decades of water diversions to areas that
would otherwise be dry. Another notable vegetation community is areas of gambel oak groves.
These are limited in area, generally occurring on the northern portion of the property.
Figure 6:
Cottonwood galleries along Roaring Fork River.
Both natural and diverted water courses exist on the property. The property's southern
boundary approximates the centerline of the Roaring Fork River, except where adjacent to an
isolated parcel of BLM-administered land. Three primary irrigation ditches serve the property
including a lateral from the Basin Ditch, the Middle Ditch (aka Blue Creek Ditch), and the Lower
Aspen Valley Polo Club
14 NARRATIVE—November, 2017
Ditch. There are also several other lateral ditches existing on the property. Historically, the
ditches were used to flood irrigate the pastures on the property.
Wetlands have been identified on the southern portion of the property, and a Jurisdictional
Determination for 9.4 acres was made by the Army Corp of Engineers (ACoE) on April 20, 2009
(ACoE File No. SPK -2008 -00253 -CW). This determination has since expired (after 5 years). A new
wetland delineation was conducted in November of 2017, which resulted in a new total of 7.9
acres of wetlands on the property. This new delineation will be submitted to the ACoE for a
jurisdictional determination. The 2017 mapped area of wetlands is shown on the Site Plan in
Appendix F.
Figure 7:
Typical wetland area.
The site is fairly level with an overall east -west gradient of 0.8%, and an overall north -south
gradient of 1.0%. A portion of this topographical change is located in a bench that bisects the
property from east to west through the property's mid-section. The riparian forest adjacent to
the river is composed of a series of undulating channels, presumably created as the Roaring Fork
River historically migrated from north to south in the area. The property generally drains from
northeast to southwest at an overall grade of 1.4%, changing in elevation approximately 43
vertical feet over a distance of 3070 feet.
Surrounding land uses are varied, but are primarily rural residential. To the west of the subject
property is Blue Creek Ranch PUD, with an overall density of one unit per 1.6 acres, with the
development concentrated on 40% of the 81 acres. To the northwest, the Catherine Court
property contains 8 dwellings on one acre, primarily consisting of mobile homes. To the north of
the Aspen Valley Polo Club PUD is the CDOT Right -of -Way for Old Highway 82, and State
Highway 82, respectively. North of the CDOT ROW is a 40 -acre parcel of vacant land that at the
Aspen Valley Polo Club
15 NARRATIVE—November, 2017
time of this writing is listed for sale. To the east lies the Waldorf School, with their school
building and associated accessory facilities and playfields. The subject property is bordered on
the south by both the RFTA ROW with the Rio Grande Trail, and also BLM-administered lands
that represent the northern most portion of an area known as The Crown.
A high-pressure gas main bisects the property within a 50' easement held by Rocky Mountain
Natural Gas Co., Inc. Holy Cross Electric holds a 20' easement into the property from Old
Highway 82 to the location of the previously existing residences. Overhead electric lines exist
along the northern property boundary, adjacent to Old Highway 82. Centurylink and Comcast
provide existing communications service to the property. There are four existing decreed
domestic water wells on the property, and raw irrigation water is provided by ditches as
previously described.
There is one existing access point to the site which is located on the northern property boundary
connecting to Old Highway 82 (CDOT). The current access is a gravel driveway, and the property
has no direct connection to any County road.
Figure 8: Oblique view of property, looking south (image source: Google Earth).
Crown Mountain
Roaring Fork River
Waldorf — -
School
ASPEN VALLEY
_POLO CLUB PARCEL
IOC.44.3 acres
Blue Creek
Ranch
Catherine
Court
Aspen Valley Polo Club
16 NARRATIVE—November, 2017
4. Demonstration of Submittal Requirements
The following table demonstrates compliance with the required application submittal materials
following Table 6-301 of the LUDC for a Planned Unit Development, and the Garfield County Pre -
Application Conference Summary Letter dated 3/19/17 and signed 4/13/17.
4.1. Table 2: Application Submittal Materials
Verify
Item
LUDO SECTION 4-203.
Location
General Application Materials:
1. Application Form
Appendix A
2. Ownership
Appendix B
3. Adjacent Property Owners and Mineral Owners and Lessees
Appendix C
4. Fees
Deposit paid
5. Project Description
Page 18, Narrative
Vicinity Map
Appendix D
Improvement Survey Plat
Appendix E
Site Plan
Appendix F
Grading and Drainage Plans (Engineering Report & Plans)
Appendix G
Landscape Plans
Appendix I
Impact Analysis
Page 28, Narrative
Rezoning Justification Report
Page 37, Narrative
Improvements Agreement (Draft)
Appendix J
Traffic Impact Study & Access Permit Applications
Appendix K
Water Supply and Distribution Plan (Engineering Report & Plans; Water Rights)
Appendix G & H
Wastewater Management and System Plan (Engineering Report & Plans)
Appendix G
Floodplain Analysis (Floodplain Development Permit)
Appendix L
LUDC SECTION 6-302.
PUD Plan:
1. PUD General Descriptions
Page 38, Narrative
2. PUD Technical Descriptions
Page 40, Narrative
3. PUD Plan Map
Appendix M
4. PUD Guide
Appendix N
Amendment Justification Report
Page 43, Narrative
OTHER.
Statement of Authority
Appendix 0
Letter of Authorization
Appendix P
Aspen Valley Polo Club
17 NARRATIVE—November, 2017
5. Project Description
This Section provides a categorical summary of the overall project proposal.
5.1. Proposed Zoning
As proposed, the Aspen Valley Polo Club PUD is comprised of two distinct Zone Districts as depicted
on the PUD Zone District Map (Figure 9) below. Each Zone District is intended to provide specific
consistency in allowed land uses, development standards and densities. Zone District 1 primarily
contains agricultural uses and includes 49.23 acres in the northern portion of the PUD. Zone District
2 primarily contains residential and open space uses and includes 51.21 acres in the southern
portion of the PUD.
Figure 9:
PUD Zone District Map (full size version located in Appendix F).
f//di'4raiioed/
Aand/uses, standards and densities}
////fes//J/////JJ " !/ ��/
18
Aspen Valley Polo Club
NARRATIVE - November, 2017
5.2. Allowed Land Uses
The proposed land uses for the Aspen Valley Polo Club PUD are very similar to those approved for
the former TCI Lane Ranch, with a few exceptions. Similar to the existing zoning, proposed land uses
include agricultural, residential, parks, open space, trails, utilities, and water storage. Where the
current proposal differs is that the proposed uses include provisions for additional agricultural uses
with equestrian facilities. This includes any agricultural building, structure, or improvement for the
purpose of accommodating, breeding, raising, training or competing equids (primarily horses).
Associated agricultural facilities may include barns, stables, riding halls, riding rings, paddocks, polo
fields, corrals, tracks, or trails. The complete list of proposed "Uses by Right" is included in Section 4
of the PUD Guide, Appendix N.
5.3. Land Use Summary
The PUD Guide (Appendix N) provides detail on various dimensional and development standards,
open space requirements, and also includes limitations on density. The following PUD Summary
Table details the minimum standards and limitations for the proposed PUD.
5.3.1. Table 3: PUD Summary Table
ITEM
OVERALL PUD
ZONE DISTRICT 1
ZONE DISTRICT 2
Total Acres
100.44 +/-
49.23 +/-
51.21 +/-
Minimum Open Space Percent
50%
21% (of total PUD)
29% (of total PUD)
Minimum Open Space Acres
50.22 +/-
21.09 +/-
29.13 +/-
Minimum Lot Size
--
0.75 acres
0.25 acres
Maximum Number of Dwelling Units
54
12
42
Maximum Dwelling Units per Lot
--
up to 4
1
Maximum Overall Density
(Acres per Dwelling Unit)
1.9 AC/DU
4.1 AC/DU
1.2 AC/DU
Aspen Valley Polo Club
19 NARRATIVE—November, 2017
5.4. Community Design
The design for the PUD blends the unique facilities of a horse breeding and training center with
provisions for a compact and well-amenitized residential neighborhood, while maintaining the
integrity of an important natural environment adjacent to the Roaring Fork River. The northern
portion of the property (Zone District 1) contains the agricultural and equestrian -related uses of the
PUD. These facilities include barns and stables, paddocks, an exercise track for horses, two
regulation -sized polo fields, ponds for the storage of irrigation water, a clubhouse, up to 12 dwelling
units, and the necessary provisions of dual road access and appropriate wet and dry utilities. The
southern portion of the property (Zone District 2) has a configuration that is very similar to the
former PUD Site Plan for TCI Lane Ranch. This includes a community center, greenhouse and
gardens, park, open space, trails, up to 42 residential units, and appropriate access and utilities.
Figure 10:
Site Plan (full size version located in Appendix F).
20
Aspen Valley Polo Club
NARRATIVE — November, 2017
5.5. Zone District 1— Plan Elements
Envisioned improvements within Zone District 1 have been designed to a high degree of detail in
order to facilitate a Phase 1 construction schedule that would commence in early spring of 2018.
5.5.1. Horse Barns & Maintenance Barn
The agricultural facilities of Zone District 1 will include five horse barns, providing stalls for
approximately 20-30 horses per barn. The horse barns will serve as the primary facilities for
accommodating, breeding, and training horses. As identified in the PUD Guide (Appendix N), the
barns may also include dwelling units. At the time of this writing, it is envisioned that each barn
will include one 2 -bedroom dwelling unit, which would be occupied by horse trainers or other
employees. Each barn will also include ancillary facilities such as outdoor paddocks and
adequate truck/trailer parking and turnarounds. Associated with the horse barns is a 1/2 mile long
horse exercise track, which will be constructed to a width of 18'.
A maintenance barn is located in the northwest corner of the property, and will provide parking
and storage for all equipment, machinery, and supplies. The maintenance barn may also include
up to two Affordable Housing Units, as provided for in the PUD Guide (Appendix N).
Figure 11: Conceptual barn design.
S! p G E L E v e•-•7 I N
Lig
L E V A T I a N
Aspen Valley Polo Club
21 NARRATIVE—November, 2017
5.5.2. Polo Fields
Two regulation -sized polo fields are planned in Zone District 1. Each polo field is approximately
545' x 1030', and each occupies about 13 acres. The fields will be constructed to lie on the
natural grade of the property, and will have sub -surface drainage systems. Irrigation water for
the fields will be supplied from raw water rights from the Basin Ditch, which amount to
approximately 2.5 cfs (see Water Supply & Rights, Appendix H). Three proposed ponds on the
property will provide sufficient water storage for irrigation purposes.
Figure 12:
Existing polo field at Aspen Equestrian Estates.
5.5.3. Clubhouse
Centrally located on the south boundary of polo field 1 is a clubhouse. This building will be
approximately 4800 sf on one level, and will include a kitchen, bar, dining area, men's and
women's locker rooms, restrooms, therapy rooms, and a viewing terrace adjacent to the polo
field. The clubhouse site will also provide paved parking for approximately 30-40 vehicles.
Adjacent to the clubhouse (to the southeast) is the planned location for the McClure cabin. As
discussed in Section 3.2.4, this cabin currently exists on the property, and will be preserved and
moved to this new location.
Aspen Valley Polo Club
22 NARRATIVE—November, 2017
5.5.4. Cabins
There are four planned cabins on the west side of polo field 1. These are located in an existing
gambel oak grove, and will be field -located to preserve trees to the greatest extent possible. In
accordance with the Garfield County LUDC, these cabins are technically considered Single Family
Dwellings since they could be occupied on a year-round basis. The cabins are anticipated to have
2 bedrooms and be approximately 1200 sf each. They are planned to be utilized as employee
housing in the summer, and short term rentals in the winter.
5.6. Zone District 2 — Plan Elements
Envisioned improvements within Zone District 2 have been designed to a conceptual level of detail,
as this second Phase of the project will occur at a later date. Certain flexibility is inherent in the PUD
Guide (Appendix N) to allow for an appropriate level of design latitude, while prescribing specific
allowed land uses, dimensional standards, and densities.
5.6.1. Residential Neighborhoods
The residential areas of Zone District 2 are conceptually configured to create a "rural cluster"
style development pattern with distinct neighborhoods separated by preserved open space
areas. Trail systems will connect to other common areas within the project, allowing for efficient
pedestrian and bicycle transportation in the community. A significant buffer zone adjacent to
the Roaring Fork River will allow for the protection of water quality, wildlife, and the
preservation of the recreational experience of the river corridor. Design Guidelines relating to
the architectural character will promote designs that blend with the existing landscape in colors,
textures, materials, and uniqueness. The maximum overall residential density of Zone District 2
is 1.2 acres per dwelling unit (51.21 acres / 42 dwelling units). The minimum lot size is 0.25
acres, and there is no maximum lot size. This density is compatible with surrounding land uses
and the Residential High Density designation of the property per the Garfield County
Comprehensive Plan.
5.6.2. Community Center
An existing timber barn on the property will be renovated to become the centerpiece of the
residential neighborhood as a HOA community center building. The community center building
will provide residents with a place to hold community meetings and events, and also serve as a
small recreation center and HOA office. It is anticipated that indoor facilities could include a
meeting room, exercise facilities, office, kitchen, and restroom on the two floors of the 1450 SF
structure. A parking area will provide space for approximately 14 vehicles, including one
handicap accessible space. The existing structure has been evaluated for structural integrity and
has been deemed appropriate for this use. The original architectural character and appearance
Aspen Valley Polo Club
23 NARRATIVE—November, 2017
will be kept intact through the renovation process. The community center will provide an
important amenity for residents while fostering community -wide participation in various events
and programs. The building will likely serve as a management office throughout the construction
phases.
Figure 13:
Conceptual design of barn renovation.
5.6.3. Greenhouse & Gardens
The existing greenhouse was constructed in 2010, and has been in continuous year-round
operation since that time. The greenhouse is a single -level structure of approximately 2400 sf,
and also includes ancillary outdoor gardens. This facility will serve as an amenity for the future
residential neighborhoods as a community asset for local food production.
Figure 14:
Existing greenhouse and barn.
5.6.4. Park, Open Space & Trails
Associated with the Community Center and Greenhouse is a planned community park that will
provide for informal and passive recreation opportunities and a gathering place for community
events. This park will likely contain ponds, playground facilities, open turf areas, and
landscaping.
Aspen Valley Polo Club
24 NARRATIVE — November, 2017
Open Space lands are envisioned for the southern and western portions of Zone District 2. These
lands are primarily forested, and contain wetland areas, floodplain areas, and include the
Roaring Fork River corridor.
A hierarchy of trails is envisioned including paved asphalt trails, compacted soft -surface trails,
and natural surface primitive trails. The low-volume street system within the community will
also serve as a secondary trails system for both bicycles and pedestrians.
The PUD Guide (Appendix N) provides detail on the minimum required percentages of Open
Space areas.
5.7. Affordable Housing
Per the LUDC, the Aspen Valley Polo Club PUD will provide affordable housing mitigation in an
amount equal to 10% of the total dwelling units within the PUD. The maximum number of allowed
dwelling units within the Aspen Valley Polo Club PUD is 54, therefore, the PUD shall mitigate up to
five Affordable Housing Units. Affordable Housing mitigation may be provided as For Sale, Rental, or
Off -Site Affordable Housing Units, and mitigation may be provided in any combination of these
three alternatives. The total of all provided Affordable Housing Units shall include a minimum of
nine (9) bedrooms.
The Affordable Housing Units will be provided according to the following schedule: Following the
completion and issuance of Certificates of Occupancy for every nine (9) dwelling units within the
PUD, no building permits for additional dwelling units shall be issued until the issuance of a
Certificate of Occupancy for one Affordable Housing Unit within the PUD, OR the provision of one
Off -Site Affordable Housing Unit.
The detailed Affordable Housing Plan is provided in Section 7 of the PUD Guide, Appendix N.
5.8. Access & Circulation
Two access points are proposed for the Aspen Valley Polo Club PUD, and both are from Old Highway
82 (frontage road) on the north of the property. As of this writing, access permit applications have
been submitted to CDOT and are included with the Traffic Impact Study in Appendix K. These two
primary access points from Old Highway 82 help to distribute traffic throughout the community
while also allowing for secondary emergency ingress and egress. It is presumed that some of the
traffic generated by this project will utilize the County Road 100 signalized access to Hwy 82, while
some will utilize Old Highway 82 to the east of the project, connecting to Hwy 82 at Valley Road.
All roads within the project have been designed per County standards to support Average Daily
Traffic (ADT) at full build out, and meet minimum design criteria for emergency vehicles per County
Aspen Valley Polo Club
25 NARRATIVE—November, 2017
and Carbondale & Rural Fire Protection District Standards. The road system will be located within
private access and utility easements. The road circulation pattern has been designed to effectively
disperse traffic, thereby helping to minimize traffic volumes on any one road.
5.9. Landscaping
The project will provide landscape enhancements with a focus on proper screening, stormwater
treatment and recharge, and suitable plant materials with respect to long-term maintenance
requirements and reducing potential wildlife impacts. The site and landscape character has been
developed to compliment the local environment. Specific landscape elements were designed with
respect to climate, aspect, elevation, soil conditions, and proposed uses. A conceptual Landscape
Plan is included in Appendix I, and Landscape Standards are included in the PUD Guide in Appendix
N.
5.10. Utilities
Domestic water will be provided by a newly constructed well, as described in the Water Supply &
Rights documentation in Appendix H. Wastewater will be accommodated by the use of On -Site
Wastewater Treatment Systems (OWTS). The Engineering Report & Plans (Appendix G) provide
detail on both the domestic water and wastewater treatment systems.
The property owner has significant raw water rights from several ditches, including the Basin Ditch,
Middle Ditch, and Lower Ditch. These water rights will be maintained and utilized to provide
irrigation support for polo fields, common areas, constructed wetlands and building lots within the
community. Irrigation water will be provided by a raw water irrigation system with pond storage and
a centralized wet well and pressurized pump station from one or more of the project's ditches. The
Design Guidelines will prescribe maximum areas for spray irrigation within each lot.
The Rocky Mountain Natural Gas Co. (now Black Hills Energy) maintains a 50' east -west easement on
the property for three gas lines, which also provide service to the existing buildings. Future natural
gas service will be accommodated by the same source.
Holy Cross Energy currently provides power via overhead lines into the property. There is an existing
overhead power line running east to west in the CDOT Right of Way, adjacent to the northern
property boundary. The existing overhead line within the property will be removed, while the main
east -west transmission line will remain. All future electrical lines within the community will be
buried.
Communication service will be provided by Centurylink and Comcast, and all communication lines
within the community will be buried.
Aspen Valley Polo Club
26 NARRATIVE—November, 2017
5.11. Construction Phasing Plan
Construction for the project will occur in two primary Phases, as described below:
Phase 1: (Early Spring 2018 — Late 2018)
The first Phase of construction will include improvements within Zone District 1. Earthwork is
planned to begin in the early spring of 2018, and will include grading and construction of the polo
fields, roads, ponds, and building sites. This Phase will also include the installation of all necessary
wet and dry utilities. Infrastructure construction is planned to be completed in late 2018. Upon
completion of grading, drainage and utilities, vertical building construction and installation of all
necessary landscaping, irrigation and revegetation will occur.
Phase 2: (2019 - 2020)
The second Phase of construction will encompass all necessary grading, drainage, and infrastructure
for Zone District 2. Zone District 2 is currently designed to a conceptual level of detail, and it is
anticipated that Phase 2 infrastructure construction will start in 2019 with completion in 2020, not
including residential build -out.
Aspen Valley Polo Club
27 NARRATIVE—November, 2017
6. Impact Analysis
Per Section 4-203.G of the LUDC, the Applicant shall describe both the existing conditions and the
potential changes created by the project, including any potential impact mitigation strategies.
6.1. Adjacent Land Use
The existing property has previously included up to five residential dwelling units, all of which have
been removed over the past ten years. The subject property is currently approved for up to 89
dwelling units, and this PUD Amendment seeks to reduce that density to a maximum of 54 dwelling
units. The proposed PUD Amendment is highly compatible with surrounding land uses, and impacts
to adjacent land uses have been mitigated through appropriate PUD planning and design.
West Side: The proposed overall density of the PUD is 1.9 acres per dwelling unit, which is lower
density than the adjacent Blue Creek Ranch at 1.6 acres per dwelling unit, and the adjacent
Catherine Court at 0.125 acres per dwelling unit. The proposed PUD also places agricultural uses
adjacent to existing agricultural fields in the northern portion of Blue Creek Ranch. The two projects
are very compatible in terms of contiguous open space, river protection, and providing a visual open
space buffer from Highway 82.
North Side: To the north of the subject property is the CDOT Right -of -Way for Old Highway 82, and
State Highway 82, respectively. North of the CDOT ROW is a 40 -acre parcel of vacant agricultural
land that at the time of this writing is listed for sale. The proposed PUD amendment places
agricultural open space and two agricultural barns in this area, and is therefore compatible with
adjacent uses.
East Side: To the east lies the Waldorf School, with their school building and associated accessory
facilities and playfields. Under the proposed PUD Amendment, land immediately west of the school
would remain as agricultural open space, thereby limiting any potential impacts to the Waldorf
School.
South Side: The property is bordered on the south by both the RFTA ROW with the Rio Grande Trail,
and also BLM-administered lands that represent the northern most portion of the Crown. The
proposed PUD would create open space lands for the majority of adjacent lands in this area.
6.2. Site Features
The property is dominated by two primary vegetation communities. Irrigated pasture comprises
approximately one-half of the site, while cottonwood galleries dominate the other one-half. The
majority of the cottonwood galleries are adjacent to the Roaring Fork River where they are
associated with smaller quantities of spruce, ponderosa pine, and juniper. Some of the isolated
upland cottonwood galleries are the result of many decades of water diversions to areas that would
Aspen Valley Polo Club
28 NARRATIVE—November, 2017
otherwise be dry. Another notable vegetation community is areas of gambel oak groves. These are
limited in area, generally occurring on the northern portion of the property.
Both natural and diverted water courses exist on the property. The property's southern boundary is
along the Roaring Fork River, except where adjacent to an isolated parcel of BLM-administered land.
Three primary irrigation ditches also traverse the property including the Basin Ditch, Middle Ditch
(aka Blue Creek Ditch), and the Lower Ditch. There are also several lateral ditches existing on the
property. Approximately 7.9 acres of wetlands have been identified on the southern portion of the
property. There are also existing mapped floodplain areas in the southern portion (see PUD Plan
Map, Appendix M).
The site is generally level with an overall East-West gradient of 0.8%, and an overall north -south
gradient of 1.0%. A portion of this topographical change is located in a bench that bisects the
property from east to west through the property's mid-section. The riparian forest adjacent to the
river is composed of a series of undulating channels, presumably created as the Roaring Fork River
historically migrated from north to south in the area. The property generally drains from northeast
to southwest at an overall grade of 1.4%, changing in elevation approximately 43 vertical feet.
The proposed PUD Amendment is planned to preserve the majority of natural site features.
Identified wetland areas have been protected to the greatest extent possible, and any wetland
impact areas will be re -located on site (see Site Plan, Appendix F). Floodplain and floodway areas
will remain largely unchanged, excepting the small impacts which are allowed under the current
Floodplain Development Permit (Appendix L). Over 90% of the existing vegetation on site will be
preserved, and the proposed plan is designed to work with the natural topography of the site (see
Engineering Plans, Appendix G).
6.3. Soil Characteristics
According to the Garfield County Soil Hazard Profile Map, the subject parcel is not within any
Moderate or Major Soil Hazard Areas. There is a nearby area mapped as a Major Soil Hazard Area,
which is discussed in further detail in Section 6.4 below.
(Source Map: Soil Hazard Profile, Study Areas 1, 2, & 3, Garfield County, Colorado; 2-6-02)
In 2008 a Geotechnical report was produced by HP Geotech (Appendix G). This site was determined
to be in the western Colorado evaporite region within the Carbondale collapse center. The report
indicates that this creates a long term settling or subsidence rate between 0.5 and 1.6 inches every
100 years, which should have little significant impact on the proposed project.
Twelve test pits were dug with a trackhoe with most depths ranging between 8 and 10 feet deep.
The soil profile determined by the field exploration conducted on January 10, 2008 shows 0.5 to 3
feet of topsoil overlaying 2 feet of silty sand in Pit 1 and relatively dense, silty sandy gravel
containing cobbles and boulders in the remaining pits. This is said to be alluvial deposits. Logs of
Aspen Valley Polo Club
29 NARRATIVE—November, 2017
these exploratory pits and their locations can be found within the Geotech Report. The report also
states that judging from Colorado State Engineer's well records this river alluvium consists of
rounded gravel -to boulder size rocks in a relatively clean matrix extends to depths of 40 to 50 feet.
Free water was encountered in some of the pits and groundwater has been known to elevate during
seasonal runoff and times of heavy irrigation. Any below grade areas may require an underdrain
system and water proofing.
6.4. Geology and Hazard
According to the Garfield County Slope Hazard Map, the subject parcel is not within any Moderate
or Major Slope Hazard Areas. There is a nearby area mapped as a Major and Moderate Slope Hazard
Area, which is located off of the subject property and across the Roaring Fork River, south of the Rio
Grande Trail. This area is a steep hillside, and has historically produced small debris flows onto the
Rio Grande Trail following significant precipitation events.
(Source Map: Slope Hazard, Study Areas 1, 2, & 3, Garfield County, Colorado; 2-6-02)
According to the Garfield County Soil Hazard Profile Map, the subject parcel is not within any
Moderate or Major Soil Hazard Areas. There is a nearby area mapped as a Major Soil Hazard Area,
which coincides with the Major Slope Hazard area as described above. No other Soil Hazard Areas
are proximate to the subject parcel.
(Source Map: Soil Hazard Profile, Study Areas 1, 2, & 3, Garfield County, Colorado; 2-6-02)
The subject site is not located within any known mapped geologic hazard areas, and thus the
proposed land use has little consequence of exposure or impact to known geologic hazards.
6.5. Groundwater and Aquifer Recharge Areas
The subject property contains mapped 100 -year floodplains, wetlands, and a portion of the Roaring
Fork River. The existing soils have generally high infiltration rates and groundwater levels are subject
to fluctuation with seasonal runoff and flood irrigation practices.
The drainage plan has been designed to allow for proper infiltration and groundwater recharge.
Roadways will be crowned and drain into sloped grass -lined swales or ditches. These swales and
ditches will convey runoff to the localized depressions via storm inlets and piping when necessary.
Localized depressions will be the main form of retention to provide water quality and promote
infiltration. Inlet structures, piping, swales, depression and overflow structures will convey runoff
through the site. Larger depressions will be used for retention. Overflows will flow toward the lower
wetlands to the south. The amount of impervious area generated by the development will
determine the size of these depressions, pipes and structures.
A Storm Water Discharge Permit Application will be filed with the Colorado Department of Public
Health and Environment. Best Management Practices will be used to mitigate sediment transport
Aspen Valley Polo Club
30 NARRATIVE—November, 2017
and erosion due to storm events. Sediment will be kept out of the neighboring wetlands and Roaring
Fork River during construction activities. Temporary BMPs will consist of, but are not limited to, silt
fence, erosion logs, check dams, storm inlet and drain protection, temporary sediment traps and
depressions, berming and surface roughening. These BMPs will be maintained and improved during
construction and will not be removed until vegetation has been established. Permanent BMPs will
be the storm water retention depressions that will be regularly maintained. Storm sewer inlet
sumps will also act as sediment traps that will need to be cleaned out periodically. Storm water will
also be routed over and through vegetated areas, when feasible, to provide another level of water
quality treatment. This will promote infiltration and filter out pollutants and sediment.
6.6. Environmental Impacts
6.6.1. Flora and Fauna
Vegetation communities on the subject property include oakbrush shrubland (3.0 acres), upland
meadow (10.0 acres), irrigated pasture (39.8 acres), cottonwood riparian forest (36.0 acres),
ditch (0.4 acres), wet meadow (2.5 acres), herbaceous wetlands (5.6 acres), forested wetlands
(1.1 acres), and willow shrubland (2.0) acres. The majority of significant vegetation on the
property will remain intact. The vegetation community with the largest impact will be the
irrigated pasture areas, as the majority of these will be converted to agricultural -based
equestrian uses, building sites, irrigated open space, and supporting infrastructure. Other areas
of impact include the oakbrush shrubland in Zone District 1, of which approximately 1.0 acres
will be removed in the creation of polo field 1.
Wetlands have been identified on the southern portion of the property within Zone District 2,
and a Jurisdictional Determination for 9.4 acres was made by the Army Corp of Engineers (ACoE)
on April 20, 2009 (ACoE File No. SPK -2008 -00253 -CW). This determination has since expired
(after 5 years). A new wetland delineation was conducted in November of 2017, which resulted
in a new total of 7.9 acres of wetlands on the property. This new delineation will be submitted
to the ACoE for a jurisdictional determination. The 2017 mapped area of wetlands is shown on
the Site Plan in Appendix F. The proposed project would impact less than 0.5 acres of wetlands,
and those wetlands would be re -located on the site in the location shown on the Site Plan
(Appendix F). On July 2, 2012 the prior project (TCI Lane Ranch) received a Nationwide Permit
(#29) from the Army Corp of Engineers for this wetlands impact. However, this permit expired
on June 25, 2017 since the work was never initiated. The current property owner intends to re-
apply for the permit with similar proposed impacts and mitigation plan prior to development of
Zone District 2.
Mule Deer: Development of the subject property is designed to leave large blocks of habitat
relatively intact for continued deer use. Deer use of habitats around homesites will likely
continue, although at a lower level, and with changed timing of use. Deer would generally find
cover in the thickest patches of shrubs, and venture forth into meadows during the evening and
Aspen Valley Polo Club
31 NARRATIVE—November, 2017
nighttime hours. Mule deer use would be modified and more limited, but use of habitats would
still likely occur. Deer damage to landscaping can be expected. The large blocks of open space
on the property will allow for some refugia for deer, and will help with continued utilization of
more fragmented and modified areas of the property. Given the small size of the project, and
available habitat in the areas to the south of the property, this project would have insignificant
impacts to mule deer populations.
Elk: The proposed project would have very minor impacts to elk and elk habitats. Elk use of the
property is limited to a few elk during the winter months; nevertheless, the development of this
property would cumulatively reduce available winter range habitats within the area. Because
the development has significant open space areas, some elk use of the property is likely to
continue, but elk use would occur with increased stress levels and likely reduced availability of
habitats.
Black Bear: Black bear has become a significant wildlife management issue in the State of
Colorado. Bears are commonly supplementing their diets by raiding garbage cans, breaking into
homes, and becoming a hazard and a nuisance. Habitat in the area around the subject property
is dominated by pinyon/juniper woodlands, and Gambel's oak mixed shrublands, which is
considered to be good habitat for bears. The significant riparian areas along the Roaring Fork
River also provide higher -quality habitats. This development would have minor to insignificant
impacts on bear populations or bear habitat, but homeowners will be required to use bear -
proof trash containers, not feed pets outside or leave pet food outside, and be cautioned
against planting significant amounts of fruit -bearing trees near their homes.
Wild Turkey: Wild turkeys occur on the subject property in a small flock of approximately 10
birds. Turkeys forage in the meadows, bringing their chicks in to feed on the copious
grasshoppers in the late summer, and seek shelter in the dense underbrush associated with the
property. The turkeys generally keep to the cottonwood forests adjacent to the Roaring Fork
River, and associated wetlands near Blue Creek. The large ponderosa pine trees (Pinus
ponderosa) on the property provide excellent roost trees. In general, the property provides a
good array of habitats to support wild turkey. The proposed development would continue to
allow for turkey use, through the preservation of the cottonwood forests and meadow systems,
and protection of wetland areas. Construction and use of the development would likely curtail
widespread turkey use of the area for some time. After development, the main impact to turkey
would be dogs. As turkeys are ground -nesters, their nests would be extremely susceptible to
predation from domestic dogs, and their chicks would also be very susceptible to dog predation
and harassment.
6.6.2. Designated Environmental Resources
Ute Ladies' -tresses (Spiranthes diluvialis) is a native orchid that was listed by the US Fish and
Wildlife Service (USFWS) as a Threatened Species in January of 1992. At that time, the species
Aspen Valley Polo Club
32 NARRATIVE—November, 2017
population was estimated at 6,000 individuals in 10 extant and 7 historical sites in the states of
Nevada, Colorado, and Utah and thought to be extremely vulnerable. In addition, the habitat of
this plant was thought to be threatened from development, noxious weeds, and some grazing
practices. As of 2005, Ute Ladies' Tresses were known to occur in 7 western states and
population numbers were then estimated at 83,000. In 2004, the USFWS initiated a review to
begin the process to take this species off the Endangered Species List as the increased
population numbers in combination with additional data regarding the availability of habitat led
the USFWS to believe this plant did not need the extra protections the Endangered Species Act.
A population of Ute Ladies' -tresses has been identified within the subject property and is
located in a large portion of the wetland areas in Zone District 2. In 2009, a management plan
was created which will provide guidance for future management of the species as development
of the property occurs. (Ute Ladies' Tresses Orchid Management Plan for TCI Lane Ranch; Rocky
Mountain Ecological Services; July 2009). The Plan includes a mapped "Management Area", and
this PUD Amendment does not propose any development impacts to those areas.
For potential wetland impacts, please see the discussion in Section 6.6.1.
6.6.3. Impacts on Wildlife and Domestic Animals
The following section discusses considerations to minimize the potential impacts to wildlife from
the proposed development. Many of these recommendations are considered to be "best
management practices" for wildlife, which would allow for continued wildlife use of areas within
the development.
Lighting: Because the area will likely receive use by mule deer and elk during the night,
nighttime lighting of the property and excessive lighting of roads (beyond what is required for
safe driving conditions) is not recommended.
Fencing: In order to continue the effective use of the area by big game animals, wildlife -friendly
fencing will be utilized. Fencing that is needed to keep pets and children within private yards
encouraged.
Landscaping & Revegetation: Because the area is used as winter range, reclamation of road
cuts, infrastructure routes and open spaces will occur using similar native plant species and
vegetation profiles. Revegetation will also occur as soon as possible; however, planting in the
spring after big game have left the area will be best as newly planted materials would likely be
browsed first, and plants with little time to set roots will likely be pulled up by grazing big game.
Noxious weeds will be treated annually in order to minimize their spread and impact on winter
range and increase the success of revegetation activities.
Aspen Valley Polo Club
33 NARRATIVE—November, 2017
Domestic Dogs: Dogs can have a significant impact on wildlife and the ability for wildlife to
effectively use otherwise -available habitats. Dogs can chase and kill wildlife, or so exhaust and
injure wildlife that it dies later. To minimize the impacts of dogs on wildlife, the following
practices will be employed:
1) Dogs will not be allowed outside of fenced yards unless under leash control.
2) Any fenced enclosures constructed for the overnight maintenance of dogs or cats
will be within building envelopes.
3) Loose dogs will be prohibited.
Domestic Cats: Domestic cats can have significant impacts on local breeding bird, small
mammal, amphibian, and reptile populations in area habitats. Keeping cats indoors will protect
a major component of the potential non -game wildlife use in the area.
Impacts to Landscaping: Since the subject property occurs within mule deer and elk Winter
Ranges, there will likely be damage and use of the landscaping by foraging big game. The
individual property owners will be informed of this with the understanding that that Colorado
Parks & Wildlife does not provide game -damage reimbursement for damage to landscaping.
Bears: There are existing problems with bears, garbage, and people in Garfield County and
some bears have shown signs of habituation and aggression towards residents. These conflicts
can be minimized by implementation of appropriate mitigation measures. The following
measures will be implemented to reduce potential bear problems:
1) There should be no dumps that have edible materials associated with construction
and post -construction activities.
2) Residential garbage should be placed in bear -proof dumpsters, individual bearproof
trash containers, or kept in trash cans inside closed buildings.
3) Pets should not be fed outside.
4) Bird feeders and hummingbird feeders should be brought in during the evenings,
and removed altogether during the fall months (September through late
November).
5) Nut, fruit, or berry -producing trees or shrubs should not be used in landscaping in
order to minimize an attractant for bears around homes and developed areas.
6) Compost piles should be discouraged or prohibited.
Birds: Many bird species utilize the area; therefore, the following recommendations are
presented:
1) Pet cats should remain indoors, as cats will readily prey upon these species and can
have a significant impact on bird use in the area and on bird populations.
2) Bird feeders are discouraged during spring, summer, and fall months due to the
black bear use in the area. Bird feeders can be used in the winter (from mid-
November through mid-March), as bears are hibernating during this time.
Aspen Valley Polo Club
34 NARRATIVE—November, 2017
3) All bird feeders, including hummingbird feeders, should be hung away from any
window or deck, be at least 10 feet from the ground, and be suspended between
two trees or posts. Any seed feeders should have a seed catchment pan to catch
discarded seed.
6.6.4. Potential Radiation Hazard
Eighty percent of counties in Colorado are at high risk for radon, including Garfield County.
Radon is an odorless, tasteless, colorless gas that results from the radioactive decay of uranium
in the soil. Garfield County's 2010 -2011 radon program indicated that 44% of homes tested had
radon values above the EPA's "Action Limit" of 4 pCi/L (pico-curies/liter).
(Source: Garfield County website)
A gamma radiation survey was conducted on the property on February 22, 2007 by Yeh &
Associates, Inc. Gamma radiation measurements were taken on an approximate 500 -foot grid
within 3 feet of the ground surface and at the ground surface at grid points. The 33 readings
taken on the property ranged from 8 to 16 micro -roentgens per hour (IJRIhr) using a range
selector of 25 IJRIhr. The readings averaged 11 IJRIhr. The survey determined that these
background readings are typical in this area and that mitigation of naturally occurring
radioactive material (NORM) should not be required in the project area. However, areas of deep
excavation may encounter materials with elevated levels of NORM.
Additionally, in Colorado buildup of radon gas in unacceptable levels often occurs in residential
structures that are sealed to minimize air exchange. Passive and active mitigation procedures
are commonly employed in this region to effectively reduce the buildup of radon gas. While the
survey found that radon gas will not present a significant hazard at this site, if the occurrence of
radon is of concern, it is recommended that a building be tested and monitored after
construction and commonly utilized techniques employed to reduce the risk. Build-up of radon
gas can usually be mitigated by providing frequent exchange of air within the structure and
sealing joints and cracks adjacent to the subsoils.
6.7. Nuisance
The proposed uses within the subject property are not expected to produce any abnormal toxic or
noxious substances, smoke, odors, gas, wastes, steam, or dust. Detailed erosion control and
construction plans will guide development of the site during all construction phases, with a goal of
minimizing particulate matter (fugitive dust) emissions from the project site. Nevertheless, there will
likely be a minor increase in airborne particulate matter as a result of equipment operations
producing fugitive dust during construction access improvements, vegetation clearing, and during
the earthwork phases of construction. To mitigate these impacts, contractors will employ dust
control, and CDPHE stormwater permitting will require the removal of mud from vehicles before
they track mud onto local roads. The proposed land uses are anticipated to integrate well with
Aspen Valley Polo Club
35 NARRATIVE—November, 2017
neighboring existing land uses. For the above stated reasons, the land use is considered to have
minimal nuisance impacts on adjacent lands, and is generally consistent with those adjacent uses
and their associated impacts.
6.8. Hours of Operation
Zone District 1 consists primarily of agricultural -related land uses, and as a result most activity will
occur during daylight hours on both weekdays and weekends. Some special events will occur
primarily in the summer months, and may include polo matches or various community gatherings.
These special events are also likely to occur in daylight hours, with parking management plans
employed to effectively coordinate all vehicular parking needs.
Zone District 2 primarily consists of residential and open space uses, and most outdoor activity by
future residents is expected to occur during normal daylight hours.
Aspen Valley Polo Club
36 NARRATIVE—November, 2017
7. Rezoning Justification Report
7.1. Review Criteria
In accordance with Section 4-113.0 of the Land Use and Development Code, an application for
rezoning shall demonstrate that the following four criteria have been met:
1. The proposed rezoning would result in a logical and orderly development pattern and
would not constitute spot zoning.
Response: The subject property for the proposed PUD Amendment is currently zoned PUD,
with an approved PUD Site Plan and PUD Guide. This application seeks to replace those with
a new PUD Guide and PUD Plan Map. This PUD Amendment as proposed will allow the
owners to develop the property with their envisioned land uses and dimensional standards,
consistent with the Garfield County Comprehensive Plan. The new proposed agricultural
land uses are consistent with adjacent and nearby land uses.
2. The area to which the proposed rezoning would apply has changed or is changing to such a
degree that it is in the public interest to encourage a new use or density in the area.
Response: This proposed PUD Amendment would allow for new agricultural and
equestrian -based land uses to occur on the subject property. These activities have
experienced a recent increase in popularity, in part due to the applicant's development of
similar facilities at the Aspen Equestrian Estates PUD. Those uses on that property have
demonstrated a public interest in equestrian -based agriculture and associated public events,
which will be expanded upon with the subject property.
3. The proposed rezoning addresses a demonstrated community need with respect to
facilities, services, or housing.
Response: This proposed PUD Amendment would allow for a maximum of 54 dwelling
units, of which 10% will be dedicated as Affordable Housing Units. In addition to the
Affordable Housing units, other dwelling units within the project will provide opportunities
for employee housing for horse trainers and other workers on the property. These housing
provisions address a demonstrated need for providing housing options in the eastern
portion of Garfield County.
4. The proposed rezoning is in general conformance with the Comprehensive Plan and in
compliance with any applicable intergovernmental agreement.
Response: As discussed in Section 11 of this Narrative, the proposed PUD Amendment is in
substantial conformance with the Comprehensive Plan.
Aspen Valley Polo Club
37 NARRATIVE—November, 2017
8. PUD Plan
8.1. General Descriptions
Section 6-302.A.1 of the Land Use and Development Code requires a written description of the
proposal that addresses the following five items:
1. General project concept and purpose of the request.
Response: This PUD Amendment proposes a mixed-use concept that blends the unique
facilities of a horse breeding and training center with provisions for a compact and well-
amenitized residential neighborhood, while maintaining the integrity of an important
natural environment adjacent to the Roaring Fork River.
The northern portion of the property (Zone District 1) contains all of the agricultural and
equestrian -related facilities of the PUD. These facilities include barns and stables, paddocks,
an exercise track for horses, two regulation -sized polo fields, ponds for the storage of
irrigation water, a clubhouse, up to 12 dwelling units, and the necessary provisions of dual
road access and appropriate wet and dry utilities.
The southern portion of the property (Zone District 2) has a configuration that is very similar
to the former PUD Site Plan for TCI Lane Ranch. This includes a community center,
greenhouse and gardens, park, open space, trails, up to 42 residential units, and appropriate
access and utilities.
The purpose of this request is to replace the existing TCI Lane Ranch PUD Guide and PUD
Site Plan with the proposed Aspen Valley Polo Club PUD Plan, including a new PUD Guide
and PUD Plan Map.
2. Explanation of how the PUD is in general conformance with the Comprehensive Plan.
Response: Section 11 of this Narrative provides demonstration of how the proposed PUD
Amendment is in general conformance with the Comprehensive Plan.
3. Description of how the proposed development departs from the otherwise applicable
standards of this Code but meets the intent and purpose of this Article.
Response: The proposed PUD Amendment meets the intent and purpose of PUD Plan
pursuant to Article 6 of the LUDC, including the provision of these PUD General Descriptions,
PUD Technical Descriptions (Section 8.2), PUD Plan Map (Appendix M), and PUD Guide
(Appendix N).
Aspen Valley Polo Club
38 NARRATIVE—November, 2017
4. Relationship of the proposed PUD development to the existing land uses and adjacent
property land uses.
Response: The proposed land uses for the Aspen Valley Polo Club PUD are very similar to
those approved for the former TCI Lane Ranch, with a few exceptions. Similar to the existing
zoning, proposed land uses include agricultural, residential, parks, open space, trails,
utilities, and water storage. Where the current proposal differs is that the proposed uses
include provisions for additional agricultural uses including equestrian facilities. This
includes any agricultural building, structure, or improvement for the purpose of
accommodating, breeding, raising, training or competing equids (primarily horses).
Associated agricultural facilities may include barns, stables, riding halls, riding rings,
paddocks, polo fields, corrals, tracks, or trails. The complete list of proposed "Uses by Right"
is included in Section 4 of the PUD Guide, Appendix N.
The subject property is currently approved for up to 89 dwelling units, and this PUD
Amendment seeks to reduce that density to a maximum of 54 dwelling units. The proposed
PUD Amendment is highly compatible with surrounding land uses, and impacts to adjacent
land uses have been mitigated through appropriate PUD planning and design. Compatibility
with adjacent land uses is discussed in further detail in Section 6.1 of this Narrative.
5. Phasing and timing for the proposed development including the start and completion date
of construction of each phase.
Response: Construction for the project will occur in two primary Phases, as described
below:
Phase 1: (Early Spring 2018 — Late 2018)
The first Phase of construction will include improvements within Zone District 1.
Earthwork is planned to begin in the early spring of 2018, and will include grading and
construction of the polo fields, roads, ponds, and building sites. This Phase will also
include the installation of all necessary wet and dry utilities. Upon completion of
grading, drainage and utilities, vertical building construction and installation of all
necessary landscaping, irrigation and revegetation will occur. Completion for Phase 1 is
planned for late 2018, not including vertical build -out.
Phase 2: (2019 - 2020)
The second Phase of construction will encompass all necessary grading, drainage, and
infrastructure for Zone District 2, which is currently designed to a conceptual level of
detail. It is anticipated that Phase 2 infrastructure construction will start in 2019 with
completion in 2020, not including residential build -out.
Aspen Valley Polo Club
39 NARRATIVE—November, 2017
8.2. Technical Descriptions
Section 6-302.A.2 of the Land Use and Development Code requires a written description of the
proposal that addresses the following items:
1. Method and calculation used to determine overall project and specific use type densities.
Response: The Comprehensive Plan designation for the property is Residential High Density,
which allows a density of 1/3 acre per dwelling unit. The subject property is 100.44 acres, and
thus would be allowed up to 301 dwelling units according to the Comprehensive Plan Future
Land Use Map. Due to prior design objectives and natural resource protection, the property is
currently zoned for up to 89 dwelling units. Due to the incorporation of significant equestrian -
based agricultural uses and facilities in the current proposal, the density has been further
reduced to a maximum of 54 dwelling units.
2. The PUD shall demonstrate how common wastewater facilities will be controlled or governed
by the future owners within the PUD.
Response: Zone District 1 will contain three Onsite Wastewater Treatment Systems (OWTS) that
will collectively serve all buildings in that District. Three septic fields will be used to mitigate
wastewater and will be designed in accordance with the Colorado Department of Public Health
and Environment's Regulation 43 and Garfield County regulations. These wastewater systems
will be collectively owned and maintained by a master association, which will be established
upon filing of Final Plat for subdivision of the property.
Zone District 2 will contain a single community wastewater system (similar to Blue Creek Ranch),
which will serve up to 42 dwelling units and the community center building. This wastewater
system will be collectively owned and maintained by a master association, which will be
established upon filing of Final Plat for subdivision of the property.
3. The PUD shall demonstrate how common water facilities will be controlled or governed by the
future owners within the PUD.
Response: The property has a newly constructed water well. Piping, tanks and pumping systems
will be used to deliver and store the desired volume and provide pressure to the buildings. All
domestic water uses will be supplied in this manner. This water system will be collectively
owned and maintained by a master association, which will be established upon filing of Final
Plat for subdivision of the property.
Aspen Valley Polo Club
40 NARRATIVE—November, 2017
4. Method of adequately providing other necessary public utilities.
Response: Dry utilities for the project will be provided by various service providers, including
Holy Cross Energy (electric), Black Hills (gas), and Comcast and Centurylink (communications). All
necessary utilities will be located in Access and Utility Easements.
5. Type or method of fire protection.
Response: The design team has coordinated with the Carbondale and Rural Fire Protection
District regarding proper fire and life safety design for the project. The barns with included
dwelling units will require sprinkler systems within the dwelling units as well as fire separation
from the barns. It was estimated that one 1000 -gallon tank will be required for each barn. This
will provide 50 gallons per minute for a 20 minute duration. If the clubhouse is under 5,000
square feet or 100 occupants it will not require sprinklers, but if it exceeds either it will need to
be sprinkled. Required fire flows and volume will be calculated and utilized to determine the
final design. Dry hydrants will be placed around the site and connected to the onsite ponds for
fire suppression.
6. Description of whom or what entity shall be responsible for the provision of and payment for
any facilities available to the community, including but not limited to open space, common
areas, and structures.
Response: All common facilities will be owned and managed within the common interest
community by at least one master association, and potentially one association for each Zone
District. The association(s) will assess membership dues to property owners within the PUD for
the operation, maintenance, and upkeep of all commonly owned property.
7. Discussion of impacts on County services, schools, town services and any other unique
operation that may be pertinent to a review of the proposed zone change and methods for
mitigation.
Response: There is no extension of services into remote or undeveloped areas of the County
proposed by this PUD Amendment. The proposed residential dwellings on the property will
provide an increase in assessed value and associated property tax revenues sufficient to fund
any incremental increase in demand for County services.
The RE -1 School District has recently updated their student generation rates. Since the exact
housing types and quantities within the project are unknown, it is not possible to accurately
estimate the number of students that will be generated by the project. Based on RE -1's 2014
student generation rates, it is estimated that the project COULD generate a maximum of 41
students when using the (highest) single-family attached rate of 0.75 students per unit, and 54
total units. However, the likelihood of reaching this maximum is quite low.
Aspen Valley Polo Club
41 NARRATIVE—November, 2017
In accordance with Section 7-404 the Land Use and Development Code, the project will be
subject to a school land dedication requirement or fee -in -lieu payment for the benefit of the RE -
1 School District at the time of Final Plat.
8. Documentation showing legal access or documentation demonstrating the likelihood of
achieving legal access.
Response: The property currently has one legal access from Old Highway 82. The proposed Site
Plan (Appendix F) includes two access points from Old Highway 82. Access permit applications
have been submitted to CDOT and are included in the Traffic Impact Study, Appendix K. CDOT
had previously issued two access permit for TCI Lane Ranch (since expired), and recent
discussions with CDOT have indicated the proposed new access locations to be acceptable.
8.3. PUD Plan Map
The PUD Plan Map identifies the Zone Districts within the Aspen Valley Polo Club PUD, and is located
in Appendix M.
8.4. PUD Guide
The primary purpose of the PUD Guide is to set forth a comprehensive framework of standards,
restrictions and regulations which govern development and land use within the Aspen Valley Polo
Club PUD. The PUD Guide will promote the orderly and compatible development of the property,
while remaining somewhat flexible to allow for market changes and design innovations as the
development progresses through its operational life cycle. The PUD Guide supersedes the Garfield
County Land Use and Development Code (LUDC) with site specific regulations that are more
appropriate to the design goals and objectives of lands contained within this PUD. The PUD Guide is
located in Appendix N.
Aspen Valley Polo Club
42 NARRATIVE—November, 2017
9. Amendment Justification Report
9.1. Amendment Description and Supporting Information
All proposed amendments and supporting information are provided the PUD Plan (Section 8)
pursuant to Article 6 of the LUDC, including the provision of the PUD General Descriptions (Section
8.1), PUD Technical Descriptions (Section 8.2), PUD Plan Map (Appendix M), and PUD Guide
(Appendix N).
9.2. LUDC Section 6- 203.C. Criteria
The proposed PUD amendment does not comply with the criteria for a Minor Modification, and the
Director has made a determination that the request is a Substantial Modification. This is evidenced
by the Garfield County Pre -Application Conference Summary Letter dated 3/19/17 and signed
4/13/17.
Aspen Valley Polo Club
43 NARRATIVE—November, 2017
10. Relationship to Applicable Land Use Standards
10.1. Garfield County LUDC: Article 3 — Zoning
The subject property is currently zoned PUD with allowed land uses including agricultural,
residential, parks, open space, trails, utilities, and water storage. Where the current proposal differs
is that the proposed uses include provisions for additional agricultural uses with equestrian facilities.
This includes any agricultural building, structure, or improvement for the purpose of
accommodating, breeding, raising, training or competing equids (primarily horses). Associated
agricultural facilities may include barns, stables, riding halls, riding rings, paddocks, polo fields,
corrals, tracks, or trails. The complete list of proposed "Uses by Right" is included in Section 4 of the
PUD Guide, Appendix N.
10.2. Garfield County LUDC: Article 7 - Standards
10.2.1. Division 1: General Standards
10.2.1.1. Zone District Use Regulations
The property is currently zoned PUD, and this application seeks only to amend the PUD Plan
and not change the Zone District designation.
10.2.1.2. Comprehensive Plan and Intergovernmental Agreements
The Land Use Change demonstrates general conformance with the Garfield County
Comprehensive plan as discussed in Section 11 of this Narrative.
10.2.1.3. Compatibility
The proposed PUD Amendment is compatible with all surrounding land uses as discussed in
Section 6.1 of this Narrative.
10.2.1.4. Source of Water
The project has a legal and adequate water supply as evidenced by the Water Supply &
Rights, Appendix H and Engineering Report in Appendix G.
10.2.1.5. Central Water Distribution and Wastewater Systems
The closest Water Supply Entity to the property is the Mid Valley Metropolitan District
(MVMD), with their nearest available water main being 3600' (.68 miles) east and across
Hwy 82 from the subject property. Due to the significant costs associated with a water line
extension of this distance, connecting to the MVMD for water service is not currently
practical or economically feasible; therefore the project will utilize a Central Water
Aspen Valley Polo Club
44 NARRATIVE—November, 2017
Distribution System. If the MVMD's infrastructure or other circumstances change in the
future, the property owners may re-evaluate the potential for connection.
The closest Sewage Treatment Facility to the property is also the MVMD, with their nearest
available lift station being 2800' (.55 miles) east and across Hwy 82 from the subject
property. Due to the significant costs associated with a sewer line extension of this distance
plus additional lift stations, connecting to the MVMD for sewer service is not currently
practical or economically feasible; therefore the project will utilize Onsite Wastewater
Treatment Systems (OWTS). If the MVMD's infrastructure or other circumstances change in
the future, the property owners may re-evaluate the potential for connection.
10.2.1.6. Public Utilities
Adequate public utilities will be provided by various service providers, including Holy Cross
Energy (electric), Black Hills (gas), and Comcast and Centurylink (communications). All
necessary utilities will be located in Access and Utility Easements.
10.2.1.7. Access and Roadways
All access roads meet or exceed minimum County standards for adequate and safe access
and will support projected Average Daily Traffic (ADT) at full build out, as evidenced by the
Engineering Report & Plans in Appendix G, and the Traffic Impact Study in Appendix K.
10.2.1.8. Use of Land Subject To Natural Hazards
The subject property is not located within any known natural hazard areas, as discussed in
Section 6.4 of this Narrative.
10.2.1.9. Fire Protection
The subject property is located within the Carbondale & Rural Fire Protection District. The
design team has consulted with the District in order to meet their requirements for fire
protections, as discussed in Section 8.2 of this Narrative.
Aspen Valley Polo Club
45 NARRATIVE—November, 2017
10.2.2. Division 2: Resource Protection Standards
10.2.2.1. Agricultural Lands
No land use changes are proposed that would adversely affect any adjacent agricultural
lands.
10.2.2.2. Wildlife Habitat Areas
The proposed PUD Amendment allows for significant protections of wildlife habitat, and
provides a minimum of 50% Open Space. Wildlife impact mitigation strategies are detailed
in Section 6.6.3 of this Narrative.
10.2.2.3. Protection of Water Bodies
The proposed PUD Amendment provides for significant protection of water bodies,
including existing wetlands and the Roaring Fork River. These protections are discussed in
detail in Sections 6.2 and 6.5 of this Narrative.
10.2.2.4. Drainage and Erosion
Drainage and erosion control of the site is discussed in detail in Section 6.5 of this Narrative.
10.2.2.5. Environmental Quality
Air quality will be monitored and controlled by mitigation measures discussed in Section 6.7
of this Narrative. Water quality will be monitored and controlled by mitigation measures
discussed in Section 6.5 of this Narrative.
10.2.2.6. Wildfire Hazards
The subject property is not rated (NR) on the Garfield County Wildland Fire Susceptibility
Index Map. The property will continue to be well -irrigated, and contains primarily low-lying
riparian vegetation along the Roaring Fork River corridor. Similar properties in Garfield
County have a Low Wildland Fire Susceptibility Index.
10.2.2.7. Natural and Geologic Hazards
The subject property is not located within any known natural hazard areas, as discussed in
Section 6.4 of this Narrative.
10.2.2.8. Reclamation
Any disturbed areas of the site will be appropriately reclaimed as detailed in the Engineering
Report and the Engineering Plans (both in Appendix G).
Aspen Valley Polo Club
46 NARRATIVE—November, 2017
10.2.3. Division 3: Site Planning
10.2.3.1. Compatible Design
The proposed land use change will result in a design that is compatible with the existing
character of adjacent uses, including site organization, operational characteristics, buffering,
and material usage.
10.2.3.2. Off -Street Parking and Loading Standards
The proposed PUD amendment provides adequate parking and loading, including
allowances for off-street parking lots and front yard setbacks that will allow adequate
driveway parking. These standards are detailed in the PUD Guide, Appendix N.
10.2.3.3. Landscaping Standards
The Landscape Plans (Appendix I) demonstrate conformance with Landscaping Standards
per the PUD Guide in Appendix N.
10.2.3.4. Lighting Standards
While community lighting has not yet been proposed for this project, any lighting will
comply with the Exterior Lighting Standards per the PUD Guide in Appendix N.
10.2.3.5. Snow Storage Standards
Adequate snow storage will be provided as discussed in the Engineering Report, Appendix
G.
10.2.3.6. Trail and Walkway Standards
Trail and walkway designs will conform to Landscaping Standards per the PUD Guide in
Appendix N, and are also discussed in Section 5.6.4 of this Narrative.
Aspen Valley Polo Club
47 NARRATIVE—November, 2017
11. Relationship to Garfield County Comprehensive Plan
The Garfield County Comprehensive Plan includes general goals and policies that apply to all areas of the
County. Certain goals and policies that relate specifically to The Rifle Clough Compressor Station -
Limited Impact Review are addressed in this section. Selections from the Comprehensive Plan are
displayed in bold text; and Applicant discussions and responses are displayed in regular text.
11.1. Future Land Use
Future Land Use Map (Revision 13: 12-18-13)
The Future Land Use Map (FLUM) for the subject property has a designation of Residential High (RH)
with a density range of 1/3 to <2 Ac/Du. This designation allows a range from 50 to 301 dwelling
units for the 100.44 acre property. This PUD Amendment is proposing a maximum of 54 dwelling
units, and therefore is consistent with the Residential High designation, albeit at the low end of the
allowed range.
The description for the Residential High (RH) future land use designation includes the following:
"Criteria for determining RH density within the allowed range will be specifically determined
by the Planning Commission and will be based on "degree of public benefit", considering
factors such as: amount of affordable housing including a mix of housing types, amount of
parks/trails/ open space, energy conservation, fiscal impacts on the County, preservation of
views, providing for schools and other public needs, etc.
The proposed PUD amendment will provide Affordable Housing Mitigation equal to 10% of the total
built dwelling units, a mix of allowed housing types, parks, trails, preservation of views from the Hwy
82 corridor, and a minimum Open Space amount of 50% (50.22 acres).
The Comprehensive Plan prescribes Planned Unit Development (PUD) as one of the compatible Zone
Districts for the Residential High designation. The property is currently zoned PUD, and this proposal
does not propose a change in Zone District.
11.2. Urban Growth Areas and Intergovernmental Coordination
Through the use of Urban Growth Areas (UGA), the Comprehensive Plan encourages development
within UGAs to be consistent with municipal land use plans and policies, and where public services
and infrastructure can be provided in an efficient and cost-effective manner.
"Encourage future development requiring urban services to be located in areas where these
services are or can readily be made available."
Aspen Valley Polo Club
48 NARRATIVE—November, 2017
The subject property is not located within the Carbondale UGA, or the 3 -mile Area of Influence. The
proposed project does not require urban services such as municipal water and sewer.
11.3. Housing
The housing goals and policies of the Comprehensive Plan generally apply to new residential
development.
"Garfield County is committed to take appropriate, cost-effective measures to assure that
new development contributes its fair share to providing housing affordable to those that live
and work in the county."
The County has an inclusionary housing requirement for new residential developments only in the
Roaring Fork Valley portion of the County (where housing costs are generally higher than other
areas of the County). The proposed PUD Amendment is located in Comprehensive Plan Study Area
1, and will provide affordable housing mitigation in an amount equal to ten percent (10%) of the
total dwelling units within the PUD. The maximum number of allowed dwelling units within the PUD
is fifty-four (54), therefore, the PUD will mitigate up to five (5) Affordable Housing Units.
11.4. Transportation
Of great importance in the Comprehensive Plan is the ability of the County to maintain its road
system. Two primary issues with County Roads are generally related to commuter traffic stressing
the carrying capacity of County roads, and heavy truck traffic from industrial operations impacting
the integrity of County roads.
"Ensure that county roads are constructed and maintained on a safe, and fiscally sustainable
basis."
The Traffic Impact Study (Appendix K) provides significant detail on projected traffic generation
from the project. The proposed project does not directly access any County road, but rather is
accessed by the CDOT-administered Old Highway 82 frontage road. The Traffic Study does not
identify any additional improvements to Old Highway 82 that would be necessitated by this project.
11.5. Economics, Employment and Tourism
The construction industry is an important economic sector for Garfield County, comprising 17% of
the employment base, while the tourism sector makes up another 10% of the employment base.
The Comprehensive Plan recognizes the importance of maintaining a diverse economic base.
Aspen Valley Polo Club
49 NARRATIVE—November, 2017
"Where appropriate, encourage diverse tourism related development in order to sustain it as
an economic and employment base in Garfield County.
In the near-term, the proposed project will generate significant opportunities for the local
construction industry. These opportunities will commence with the first phase of infrastructure
improvements and continue through the construction of the final dwelling. The project will also
create long-term local opportunities for design, legal, property management, real estate and other
professionals. Supplementing the economic benefit of construction will be that of the tourism
industry (specifically agri-tourism), in which people will visit the horse facilities for various special
events, tours, and matches. The proposed project will create an opportunity to draw national and
international guests, who will also patronize other businesses in Garfield County.
11.6. Recreation, Open Space and Trails
The Comprehensive Plan recognizes the value of open lands, recreational opportunities, parks, trails
and rivers. Access to these amenities contributes to quality of life, and is important to County
residents and the tourism sector of the local economy.
"Assure that new residential development provides recreation opportunities for county
residents that are appropriate to the density and type of development or that contribute land
and/or funding to a county -wide trail and recreation system."
The proposed PUD Amendment includes the provision of internal recreational opportunities;
including a community center, parks, open space, and trails. A minimum of 50% of the PUD will be
maintained as Open Space, and includes a corridor along the Roaring Fork River which will preserve
the public river experience for floaters, fishermen, and bicyclists on the Rio Grande Trail.
11.7. Agriculture
Through the Comprehensive Plan, the County values the preservation of agricultural lands, rural
character, and agricultural heritage.
"Promote the continuation and expansion of agricultural uses."
"Preserve a significant rural character in the county."
"Preserve scenic and visual corridors in the county."
The proposed project includes the development of significant agricultural land uses, including a
horse breeding and training center with customary agricultural structures and fields. The project
also includes the preservation of the McClure cabin, which was occupied by Thomas McClure — one
of the first successful potato farmers in eastern Garfield County in the late 1800's. The cabin will be
Aspen Valley Polo Club
50 NARRATIVE—November, 2017
preserved and moved to a prominent new location where it will remain as an important piece of
history for the property. The visual corridor from Highway 82 will be preserved in an agricultural
context. This northern portion of the property will include two new barns, and polo fields that will
maintain significant areas of Open Space.
11.8. Water and Sewer Services
Through the Comprehensive Plan, the County values the preservation and enhancement of high
quality water resources and proper waste water treatment.
"Ensure the provision of legal, adequate, dependable, cost-effective and environmentally
sound sewer and water services for new development."
The project proposes to develop a Central Water Distribution System utilizing a newly constructed
well. The property owner has significant raw water rights from several ditches, including the Basin
Ditch, Middle Ditch, and Lower Ditch. These water rights will be maintained and utilized to provide
irrigation support for the property. A public sewer extension is not currently practical or
economically feasible, therefore the project will utilize Onsite Wastewater Treatment Systems
(OWTS), which will be designed in accordance with the Colorado Department of Public Health and
Environment's Regulation 43 and Garfield County regulations.
11.9. Natural Resources
The Comprehensive Plan promotes the preservation and enhancement of wildlife habitat, native
vegetation, riparian corridors, scenic resources, the night sky, and air and water quality. These
natural resources contribute significant value to the tourism sector of the local economy.
"Ensure that natural, scenic, ecological, and critical wildlife habitat resources are protected
and/or impacts mitigated."
"Preserve natural drainage patterns so the cumulative impact of public and private land use
activities will not cause storm drainage and floodwater patterns to exceed the capacity of
natural or constructed drainage ways, or to subject other areas to an increased potential for
damage due to flooding, erosion or sedimentation or result in pollution to streams, rivers or
other natural bodies of water."
The Roaring Fork River corridor is an important natural environment on the south side of the subject
property. Within this area are floodplains, wetlands, and mixed forests which create wildlife habitat
and serve important ecological functions. These areas will largely be preserved as Open Space within
the PUD. The drainage plan has been designed to allow for proper infiltration and groundwater
recharge. Inlet structures, piping, swales, infiltration depressions and overflow structures will
convey runoff through the site. Proposed roads will drain into grass -lined swales and will convey
Aspen Valley Polo Club
51 NARRATIVE—November, 2017
runoff to localized depressions via storm inlets and piping when necessary. Localized depressions
will be the main form of retention to provide water quality and promote infiltration, while larger
depressions will be used for retention. Drainage and erosion control of the site during construction
activities will be managed under the authority of a Colorado Department of Public Health &
Environment (CDPHE) discharge permit and associated Stormwater Management Plan.
11.10. Mineral Extraction
Garfield County contains significant mineral resources. Through the Comprehensive Plan, the County
recognizes the value of the resource extraction industry in contributing to a diverse and stable
economy. The Plan also promotes fair mitigation of any negative impacts extraction activities may
cause.
"Ensure that mineral extraction is regulated appropriately to promote responsible
development and provide benefit to the general public."
"Ensure that mineral extraction activities mitigate their effects on the natural environment,
including air quality, water quality, wildlife habitat or important visual resources."
"In working with mineral extraction projects, the county will protect the public health, safety
and welfare of its citizens."
This PUD Amendment does not propose any mineral extraction activities, and therefore it is not
possible to apply or compare the County's Mineral Extraction goals and policies to this project.
11.11. Renewable Energy
The Comprehensive Plan promotes the development of renewable energy sources in appropriate
locations throughout the County, and the County has ensured that regulations for such land uses are
not overly burdensome. The Comprehensive Plan also acknowledges the potential of alternative
energy production for further economic diversification.
"Promote and encourage the development of renewable energy resources within the county."
This PUD Amendment creates specific allowances for renewable energy production at an
appropriate neighborhood scale. The PUD Guide (Appendix N) allows for the use of both Accessory
and Small Solar Energy Systems. Accessory Solar Energy Systems are those rated less than 15
kilowatts, and are allowed in both Zone District 1 and 2 of the PUD. Small Solar Energy Systems are
those rated 15 to 500 kilowatts, and are allowed in Zone District 1 of the PUD.
Aspen Valley Polo Club
52 NARRATIVE—November, 2017