HomeMy WebLinkAboutConditions of PermitPERMIT CONDITIONS
Grad-5138
South Canyon Trail Phase I
1. Reveg all disturbed non traveled surfaces and trail sections
2. Provided continued weed control.
3. Provide BMPS as required to control erosion and surface runoff
4. Control all surface run off away from critical features and historic sites.
5. Secure hazardous areas from access bythe public.
6. Design to follow the 2004 edition of the IMBA Trail Solution Guide, the 2007 edition of
the USDA Trail Construction and Maintenance Notebook and the Erosion and Control
Narrative submitted with this application.