HomeMy WebLinkAboutEx 16 - CDOT Access Permit LetterExhibit 16 I CDOT Access Permit
Lake Springs Ranch
Filing 2 Final Plat Application
April 2018
COLORADO
Department or Transportation
Region 3 Traffic Section
222 S 6th St, Rm 100
Grand Junction, Colorado 81501
(970) 683-6284
October 18, 2017
ATTN: Miriam Berkeley
Berkeley Family Limited Partnership
4001 CR 114
Glenwood Springs, Colorado 81601
RE: State Highway Access Permit No. 317063, Located on approximately 3458 South
from Mile Point Reference 6.0 and intersecting with CR 114/154
Dear Permittee:
The Colorado Department of Transportation (CDOT) has received your signed permit and
application fee. A copy of the issued permit is enclosed. The next step in the CDOT access
permitting process is for you (Applicant) to obtain a Notice to Proceed (NTP). Failure to
obtain an approved Notice to Proceed prior to any construction will be a violation of the
State Highway Access Code (2 CCR 601-1, "the Code") § 2.4.
Notice to Proceed Information
Well in advance of construction, the Applicant shall request a NTP in writing along with
submitting other items, such as construction drawings, specifications, and other required
documents to CDOT. The Applicant must submit a complete packet of this information to
CDOT with their written request. If the Applicant chooses not to request the NTP, the permit
expires pursuant to subsection 2.3(11)(d).
CDOT has seven days to determine if the NTP submittal is complete for review and then notify
the applicant of any deficiencies. If complete, CDOT will review and comment on the
submitted information within 30 -days. If CDOT determines the information is unacceptable,
missing, or in need of correction, the Applicant shall correct their submittal and resubmit the
complete request for NTP.
Once resubmitted, CDOT will review the revised NTP documents within 10 -days. If the
revised documents are satisfactory, CDOT will issue a NTP. If further corrections are
necessary, the cycle of submittal, review and comments will repeat itself until approval is
granted and the NTP is issued.
The request for NTP shall include the following documents, along with any other items
specified in the Terms and Conditions of your permit:
1) Cover Letter Requesting a NTP
2) Traffic Control Plan
The traffic control plan must be:
A. Consistent with CDOT Standard Plans Manual for Maintenance and Signing
222 S 6th St, Rm 100, Grand Junction, Colorado 81501 P (970) 683-6284 F (970) 683-6290 - https://codot.gov/accesspermits
B. Consistent with the MUTCD
C. Prepared by individual with American Traffic Safety Services Association (ATSSA) or
Colorado Contractors Association certification - or sealed (stamped) by a Colorado
registered professional engineer
D. Acceptable to CDOT prior to any construction within the right-of-way
E. Presented in a manner that provides a method of handling traffic (MHT) for each
different phase of construction. The MHT will describe proposed construction
phasing and will include dimensioned diagrams of work zone elements.
The final traffic control plan must be submitted a minimum of three working days
in advance of construction. Such plans may be revised as necessary with CDOT
concurrence.
3) Insurance Liability Certification
The Applicant or contractor shall be required to provide a comprehensive general
liability and property damage insurance naming CDOT as an additional insured party, in
the amounts of not less than $600,000 per occurrence and automobile liability insurance
of $600,000 combined single limit bodily injury and property damage for each accident,
during the period of access construction.
4) Complete Construction Plans
The Applicant shall provide two copies of construction plans and specifications for the
proposed improvements. The plans shall:
A. Address, as applicable, geometry, drainage, striping, signing, and signalization
B. Include, but not limited to, layout of the access, highway improvements, utility
locations, present and proposed drainage, present and proposed right-of-way lines,
present and proposed traffic control devices, and clear zone analysis
C. Sealed by a Colorado Professional Engineer in accordance with CRS 12-25-117
D. Conform to the requirement of the permit terms and conditions
E. Include the following statement on the cover page of the plans: "This design is in full
compliance with Section 4 of the State Highway Access Code, 2 CCR 601-1 except for
the following approved design waivers:"
5) Construction Progress Schedule
The Applicant shall provide a construction progress schedule that identifies all critical
path items including but not limited to excavation, embankment, surfacing, culvert
installation, traffic control placement and removal, and access construction completion.
6) Notice to Proceed Checklist
The Applicant shall provide a completed NTP Checklist. The Engineer Design Certificate
shall be completed, signed, and sealed by the Engineer of Record (See page 13).
Complete and provide all required items marked with an "X" on this checklist and then
mark an "X" in the provided column. This Checklist and associated plans and
specifications will be included as exhibits to the NTP.
7) Performance Bonds
The performance bond must be at least 110% of the estimated total highway
construction costs. Bonding agency must be licensed to do business in the State of
222 S 6th St, Rm 100, Grand Junction, Colorado 81501 P (970) 683-6284 F (970) 683-6290 - https://codot.gov/accesspermits
Page 2 of 3
Colorado. A cost estimate, sealed by a Colorado registered professional engineer, and a
draft of each bond must be provided and approved by CDOT, prior to issuing a NTP.
8) Pre -construction Meeting
Meeting shall be scheduled between, but not limited to, Applicant, a CDOT
representative, construction personnel, Traffic Control Supervisor, and Permittee (if
other than Applicant).
Please call to schedule a pre -design meeting with a CDOT engineer at (970) 683-6284. This
meeting will go over all items that shall need to be submitted with the NTP.
Respectfully,
Daniel Rous sin
R3 Permit Manager
222 5 6th St, Rm 100, Grand Junction, Colorado 81501 P (970) 683-6284 F (970) 683-6290 - https://codot.gov/accesspermits
Page 3 of 3
COLORADO DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ACCESS PERMIT
CDOT Permit No.
317063
State Highway No / Mp / Side
082A/6.654/Left
Permit Fee
$300.00
Date of Transmittal
09/15/2017
Region / Section / Patrol / Name
3 / 02 / 12 Alan Hayes
Local Jurisdiction
Garfield County
The Permittee(s): The Applicant(s):
Dan Cokley, P.E.
Berkeley Family Limited Partnership SGM-Inc.
4001 CR 114 118 W 6th St, Ste 200
Glenwood Springs, Colorado 81601 Glenwood Springs, Colorado 81601
(970) 945-2568 (970) 945-1004
is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in
accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked
by the Issuing Authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly
appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of
the permit.
Location: approximately 3455 South from Mile Point Reference 3.0 and intersecting with CR 114/154
Access to Provide Service to: (Land Use Code) (Size) (Units)
998 - County Road CR 114 660 DHV
Additional Information:
This permit is for a mixed use residential development on CR 114. •
MUNICIPALITY OR COUNTY APPROVAL
Required only when the appropriate local authority retains issuing authority.
Signature
Print Name
Date
Title.
Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained
herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from
Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to
being used.
, The permittee shall notify Les Stanton 2K2 with the Colorado Department of Transportation, at (970) 384-3357 at
least 48 hours prior to commencing construction within the State Highway right-of-way.
The person signing as the permittee must be the owner or legal representative of the property served by the permitted access and have full authority to
accept the permit and its terms and conditions.
Permittee Signature:
db..w
Print Name
1n1 r1 04,1194A04,1194Afr 4 k
/
Date
` ^7
— / ao I 1
Co -Permittee Signature: (if applicabl
Print Name
Date
This permit is notvalid until signed by a duly authorized representative of the Department.
COL RADO DEPA MENT OF TRANSPORTATION .
Sign u
Print NName�, ` Tit I�,,
I •1 iA V T k'
Date (of issue) r
l b' I F- 1 4
Copy Distribution:
Required:
1 Region
2.Applicant
Make copies as necessary for:
3.Staff Access Section Local Authority Inspector
4.Central Files MTCE Patrol Traffic Engineer
revious editions are obsolete and may not be used
Page 1 of 3 CDOT Form #101 5/07
State Highway Access Permit
Form 101, Page 2
The following paragraphs are excerpts of the State Highway
Access Code. These are provided for your convenience but
do not alleviate compliance with all sections of the Access
Code. A copy of the State Highway Access Code is available
from your local issuing authority (local government) or the
Colorado Department of Transportation (Department).
When this permit was issued, the issuing authority made its
decision based in part on information submitted by the
applicant, on the access category which is assigned to the
highway, what alternative access to other public roads and
streets is available, and safety and design standards.
Changes in use or design not approved by the permit or the
issuing authority may cause the revocation or suspension of
the permit.
APPEALS
1. Should the permittee or applicant object to the denial of
a permit application by the Department or object to any of the
terms or conditions of a permit placed there by the
Department, the applicant and permittee (appellant) have a
right to appeal the decision to the [Transportation]
Commission [of Colorado]. To appeal a decision, submit a
request for administrative hearing to the Transportation
Commission of Colorado within 60 days of transmittal of
notice of denial or transmittal of the permit for signature.
Submit the request to the Transportation Commission of
Colorado, 4201 East Arkansas Avenue, Denver, Colorado
80222-3400. The request shall include reasons for the
appeal and may include changes, revisions, or conditions
that would be acceptable to the permittee or applicant.
2. Any appeal by the applicant or permittee of action by a
local issuing authority shall be filed with the local authority
and be consistent with the appeal procedures of the local
authority.
3. In submitting the request for administrative hearing, the
appellant has the option of including within the appeal a
request for a review by the Department's internal
administrative review committee pursuant to [Code]
subsection 2.10. When such committee review is requested,
processing of the appeal for formal administrative hearing,
2.9(5) and (6), shall be suspended until the appellant notifies
the Commission to proceed with the administrative hearing,
or the appellant submits a request to the Commission or the
administrative law judge to withdraw the appeal. The two
administrative processes, the internal administrative review
committee, and the administrative hearing, may not run
concurrently.
4. Regardless of any communications, meetings,
administrative reviews or negotiations with the Department
or the internal administrative review Committee regarding
revisions or objections to the permit or a denial, if the
permittee or applicant wishes to appeal the Department's
decision to the Commission for a hearing, the appeal must
be brought to the Commission within 60 days of transmittal
of notice of denial or transmittal of the permit.
PERMIT EXPIRATION
1. A permit shall be considered expired if the access is not
under construction within one year of the permit issue date
or before the expiration of any authorized extension. When
the permittee is unable to commence construction within one
year after the permit issue date, the permittee may request a
one year extension from the issuing authority. No more than
two one-year extensions may be granted under any
circumstances. If the access is not under construction within
three years from date of issue the permit will be considered
expired. Any request for an extension must be in writing and
submitted to the issuing authority before the permit expires.
The request should state the reasons why the extension is
necessary, when construction is anticipated, and include a
copy of page 1 (face of permit) of the access permit.
Extension approvals shall be in writing. The local issuing
authority shall obtain the concurrence of the Department
prior to the approval of an extension, and shall notify the
Department of all denied extensions within ten days. Any
person wishing to reestablish an access permit that has
expired may begin again with the application procedures. An
approved Notice to Proceed, automatically renews the
access permit for the period of the Notice to Proceed.
CONSTRUCTION
1. Construction may not begin until a Notice to Proceed is
approved. (Code subsection 2.4]
2. The construction of the access and its appurtenances as
required by the terms and conditions of the permit shall be
completed at the expense of the permittee except as
provided in subsection 2.14. All materials used in the
construction of the access within the highway right-of-way or
on permanent easements, become public property. Any
materials removed from the highway right-of-way will be
disposed of only as directed by the Department. All fencing,
guard rail, traffic control devices and other equipment and
materials removed in the course of access construction shall
be given to the Department unless otherwise instructed by
the permit or the Department inspector.
3. The permittee shall notify the individual or the office
specified on the permit or Notice to Proceed at least two
working days prior to any construction within state highway
right-of-way. Construction of the access shall not proceed
until both the access permit and the Notice to Proceed are
issued. The access shall be completed in an expeditious and
safe manner and shall be finished within 45 days from
initiation of construction within the highway right-of-way. A
construction time extension not to exceed 30 working days
may be requested from the individual or office specified on
the permit.
4. The issuing authority and the Department may inspect
the access during construction and upon completion of the
access to ensure that all terms and conditions of the permit
are met. Inspectors are authorized to enforce the conditions
of the permit during construction and to halt any activities
within state right-of-way that do not comply with the
provisions of the permit, that conflict with concurrent highway
construction or maintenance work, that endanger highway
property, natural or cultural resources protected by law, or
the health and safety of workers or the public.
5. Prior to using the access, the permittee is required to
complete the construction according to the terms and
conditions of the permit. Failure by the permittee to abide by
all permit terms and conditions shall be sufficient cause for
the Department or issuing authority to initiate action to
suspend or revoke the permit and close the access. If in the
determination of the Department or issuing authority the
failure to comply with or complete the construction
requirements of the permit create a highway safety hazard,
such shall be sufficient cause for the summary suspension
of the permit. If the permittee wishes to use the access prior
to completion, arrangements must be approved by the
issuing authority and Department and included in the permit.
The Department or issuing authority may order a halt to any
unauthorized use of the access pursuant to statutory and
regulatory powers. Reconstruction or improvement of the
access may be required when the permittee has failed to
meet required specifications of design or materials. If any
construction element fails within two years due to improper
construction or material specifications, the permittee shall be
responsible for all repairs. Failure to make such repairs may
result in suspension of the permit and closure of the access.
6. The permittee shall provide construction traffic control
devices at all times during access construction, in
conformance with the M.U.T.C.D. as required by section 42-
4-104, C.R.S., as amended.
7. A utility permit shall be obtained for any utility work within
highway right-of-way. Where necessary to remove, relocate,
or repair a traffic control device or public or private utilities for
the construction of a permitted access, the relocation,
removal or repair shall be accomplished by the permittee
without cost to the Department or issuing authority, and at
the direction of the Department or utility company. Any
damage to the state highway or other public right-of-way
beyond that which is allowed in the permit shall be repaired
immediately. The permittee is responsible for the repair of
any utility damaged in the course of access construction,
reconstruction or repair.
8. In the event it becomes necessary to remove any right-
of-way fence, the posts on either side of the access shall be
securely braced with an approved end post before the fence
is cut to prevent any slacking of the remaining fence. All
posts and wire removed are Department property and shall
be turned over to a representative of the Department.
9. The permittee shall ensure that a copy of the permit is
available for review at the construction site at all times. The
permit may require the contractor to notify the individual or
office specified on the permit at any specified phases in
construction to allow the field inspector to inspect various
aspects of construction such as concrete forms, subbase,
base course compaction, and materials specifications. Minor
changes and additions may be ordered by the Department
or local authority field inspector to meet unanticipated site
conditions.
10. Each access shall be constructed in a manner that shall
not cause water to enter onto the roadway or shoulder, and
shall not interfere with the existing drainage system on the
right-of-way or any adopted municipal system and drainage
plan..
11. By accepting the permit, permittee agrees to save,
indemnify, and hold harmless to the extent allowed by law,
the issuing authority, the Department, its officers, and
employees from suits, actions, claims of any type or
character brought because of injuries or damage sustained
by any person resulting from the permittee's use of the
access permit during the construction of the access.
CHANGES IN ACCESS USE AND PERMIT VIOLATIONS
1. It is the responsibility of the property owner and
permittee to ensure that the use of the access to the property
is not in violation of the Code, permit terms and conditions or
the Act. The terms and conditions of any permit are binding
upon all assigns, successors -in -interest, heirs and
occupants. If any significant changes are made or will be
made in the use of the property which will affect access
operation, traffic volume and or vehicle type, the permittee or
property owner shall contact the local issuing authority or the
Department to determine if a new access permit and
modifications to the access are required.
2. When an access is constructed or used in violation of
the Code, section 43-2-147(5)(c), C.R.S., of the Act applies.
The Department or issuing authority may summarily suspend
an access permit and immediately order closure of the
access when its continued use presents an immediate threat
to public health, welfare or safety. Summary suspension
shall comply with article 4 of title 24, C.R.S.
MAINTENANCE
1. The permittee, his or her heirs, successors -in -interest,
assigns, and occupants of the property serviced by the
access shall be responsible for meeting the terms and
conditions of the permit, the repair and maintenance of the
access beyond the edge of the roadway including any cattle
guard and gate, and the removal or clearance of snow or ice
upon the access even though deposited on the access in the
course of Department snow removal operations. Within
unincorporated areas the Department will keep access
culverts clean as part of maintenance of the highway
drainage system. However, the permittee is responsible for
the repair and replacement of any access -related culverts
within the right-of-way. Within incorporated areas, drainage
responsibilities for municipalities are determined by statute
and local ordinance. The Department will maintain the
roadway including auxiliary lanes and shoulders, except in
those cases where the access installation has failed due to
improper access construction and/or failure to follow permit
requirements and specifications in which case the permittee
shall be responsible for such repair. Any significant repairs
such as culvert replacement, resurfacing, or changes in
design or specifications, requires authorization from the
Department.
Form 101, Page 3
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
1. This permitted access is only for the use and purpose stated in the Application and Permit.
This Permit is issued in accordance with the State Highway Access Code (2 CCR 601-1), and is
based in part upon the information submitted by the Permittee. Any subsequent relocation,
reconstruction, or modifications to the access or changes in the traffic volume or traffic
nature using the access shall be requested for by means of a new application. Any changes
causing non-compliance with the Access Code may render this permit void, requiring a new
permit.
2. This permit replaces permit any and all additional access permits that may be in existence
for this access.
3. The traffic volume shall be 660 DHV for Garfield County Road 114.
4. This access is a full movement signalized intersection. This is east leg of GCR 114.
5. A westbound SH 82 to northbound Garfield County Road 114 right -turn deceleration lane
shall be extended to State Highway Access Code standards.
6. The southbound Garfield County Road 114 to westbound SH 82 right -turn acceleration lane
shall be extended to State Highway Access Code standards.
7. The eastbound SH 82 to northbound Garfield County Road 114 left -turn deceleration lane
shall be extended to meet current State Highway Access Code standards.
8. The Permittee shall provide a signage and pavement markings plan to prevent southbound
Garfield County Road 114 traffic from blocking the GCR 114/frontage road intersection.
9. All mainline auxiliary lanes may need a 2 -inch overlay. This shall be decided at the pre -
design meeting.
10. As per the Access Code, Section 4.5 (Section 5) this access that is a public roadway shall be
improved and be re -constructed no less than 40 feet wide (exclusive of the radii). There
shall be, at minimum, a 25' turning radii (or a radii that will accommodate the minimum
turning radius of the largest vehicle projected to use the access). A turning template shall
be required with the final plan sets for review prior to the issuance of a Notice to Proceed.
11. The horizontal axis of the access to the State Highway shall be constructed perpendicular to
the centerline of the highway and extend from the edge of the roadway a minimum distance
of 40 feet, or to the property line, whichever is greater. This design shall be in conformance
with section 4 of the State Highway Access Code, 2CCR 601-1.
12. Side slopes shall be at a 4:1 slope on the roadway. The roadway shall slope away from the
highway at a -2% grade for the first 20 feet of driveway. This design shall be in conformance
with section 4 of the State Highway Access Code, 2CCR 601-1.
13. Immediately upon completion of earthwork, and prior to use, this access shall be surfaced in
accordance with Section 4.7 of the Access. This access shall be hard surfaced in accordance
with Section 4.7 of the Access Code.
14. The access shall be hard -surfaced a minimum distance of 50 feet from the traveled way, or
to the CDOT Right -of -Way, whichever is greater. Where the hard surface is to abut the
existing pavement, the existing pavement shall be saw cut and removed a minimum of one
foot back from the existing edge for bituminous, or until an acceptable existing cross slope
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
is achieved. Surfacing shall meet the Department's specifications with minimum surfacing to
be equal to, or greater than, existing highway conditions.
15. The Permittee shall provide a performance bond that will insure completion of the required
highway and all related intersection improvements in conformance with all Department
standards and specifications. The bond must be at least 110% of the estimated total
highway construction cost and the bonding agency must be surety licensed to do business in
the State of Colorado. A thorough Construction Cost Estimate sealed by a Colorado
Registered Professional Engineer and a draft of the bond must be provided and approved by
Department before acceptance of the final bond and before construction is approved to
commence.
16. A pre -design meeting is required prior to construction design. Required personnel for this
meeting are: Engineer of Record, Design Engineer, and Permittee. Please Devin Drayton,
970-683-6286 for scheduling this pre -design meeting.
17.Materials, Placing, and Compaction
For Level 3 projects, the specifications for materials and compaction shall be discussed and
determined at the pre -design meeting with the Region 3 Access Project Engineer.
Unless the Applicant has approval from the Access Manager who may state otherwise, the
following are requirements for driveway construction:
Hot Mix Asphalt Option (HMA)
Base: 16 inches of class 6 gravel with maximum 6 -inch lifts;
Surface: 4 inches of HMA in two, 2 -inch lifts;
Compaction of the subgrade, embankments and backfill shall comply with
sections 203 Et 304 of the Colorado Highway Standard Specifications for Road and
Bridge Construction.
Concrete Pavement Option: Portland Cement (PCCP)
Base: 4 inches of class 6 gravel;
Surface: A minimum of 6" of doweled and tied PCCP.
Compaction of the subgrade, embankments and backfill shall comply with
sections 203 &t 304 of the Colorado Highway Standard Specifications for Road and
Bridge Construction.
18. A Notice to Proceed, CDOT Form 1265, must be issued by CDOT before beginning
construction on the access or any activity within the highway Right -of -Way.
19. To receive the Notice to Proceed the applicant shall submit a complete packet to CDOT
with the following items:
(a) Prior to the issuance of any Notice to Proceed, the applicant shall schedule a pre -
construction meeting including but not limited to applicant, Engineer of Record,
Construction Inspector, construction personnel, Permittee (if other than applicant),
CDOT representative and Traffic Control Supervisor.
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
(b) A construction schedule-- required at the pre -construction meeting.
(c) A cover letter requesting a Notice to Proceed.
(d) Certificate of Insurance Liability as per Section 2.3(11)(i) of the State Highway Access
Code, naming CDOT as an additional insured for general liability.
(e) A certified Traffic Control Plan in accordance with Section 2.4(6) of the Access Code.
The Traffic Control Plan shall provide accessibility features to accommodate all
pedestrians including persons with disabilities for all pathways during construction.
(f) Ten copies of Construction Plans Stamped (11"x 17" with a minimum scale of 1" = 50')
by a Colorado Registered Professional Engineer in full compliance with the State Highway
Access Code.
(g) Signed and sealed Notice to Proceed Checklist.
(h) Signed and Approved Performance Bond.
(i) Signed and sealed Drainage Report or narrative.
20. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is
required to maintain all drainage in excess of historical flows and time of concentration on
site. All existing drainage structures shall be extended, modified or upgraded, as applicable,
to accommodate all new construction and safety standards, in accordance with the
Department's standard specifications.
21. Open cuts, which are at least 4 inches in depth, within 30 feet of the edge of the State
Highway traveled way, will not be left open at night, on weekends, or on holidays, or shall
be protected with a suitable barrier per State and Federal Standards.
22. Nothing in this permit shall prohibit the Chief Engineer from exercising the right granted in
CRS 43-3-102 Including but not limited to restricting left hand turns by construction of
physical medial separations.
23. The Permittee is responsible for obtaining any necessary additional Federal, State and/or
City/County permits or clearances required for construction of the access. Approval of this
access permit does not constitute verification of this action by the Permittee. Permittee is
also responsible for obtaining all necessary utility permits in addition to this access permit.
24. All workers within the State Highway right-of-way shall comply with their employer's safety
and health policies/procedures, and all applicable U.S. Occupational Safety and Health
Administration (OSHA) regulations - including, but not limited to the applicable sections of
29 CFR Part 1910 - Occupational Safety and Health Standards and 29 CFR Part 1926 - Safety
and Health Regulations for Construction. Personal protective equipment (e.g. head
protection, footwear, high visibility apparel, safety glasses, hearing protection, respirators,
gloves, etc.) shall be worn as appropriate for the work being performed, and as specified in
regulation.
25. The Permittee shall provide accessibility features to accommodate all pedestrians including
persons with disabilities for all pathways during and after construction.
26. The Permittee is required to comply with the Americans with Disabilities Act Accessibility
Guidelines (ADAAG) that have been adopted by the U.S. Architectural and Transportation
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
Barriers Compliance Board (Access Board), and incorporated by the U.S. Attorney General as
a federal standard. These guidelines are defining traversable slope requirements and
prescribing the use of a defined pattern of truncated domes as detectable warnings at street
crossings. The new Standards Plans and can be found on the Design and Construction Project
Support web page at: https://www.codot.gov/business/designsupport/standard-plans .
27. When it is necessary to remove any highway right-of-way fence, the posts on either side of
the access entrance shall be securely braced with approved end posts and in conformance
with the Department's M-607-1 standard, before the fence is cut, to prevent slacking of the
remaining fence. All materials removed shall be returned to the Department.
28. It shall be the responsibility of the Permittee to maintain adequate sight distance for this
driveway. Trimming of vegetation or trees to maintain adequate sight distance is the sole
responsibility of the Permittee.
29. The permittee, his or her heirs, successors -in -interest, assigns, and occupants of the
property serviced by the access shall be responsible for meeting the terms and conditions of
the permit, the repair and maintenance of the access beyond the edge of the roadway
including any cattle guard and gate, and the removal or clearance of snow or ice upon the
access even though deposited on the access in the course of Department snow removal
operations. Within unincorporated areas the Department will keep access culverts clean as
part of maintenance of the highway drainage system. However, the permittee is responsible
for the repair and replacement of any access -related culverts within the right-of-way.
Within incorporated areas, drainage responsibilities for municipalities are determined by
statute and local ordinance. The Department will maintain the roadway including auxiliary
lanes and shoulders, except in those cases where the access installation has failed due to
improper access construction and/or failure to follow permit requirements and
specifications in which case the permittee shall be responsible for such repair. Any
significant repair such as culvert replacement, resurfacing, or changes in design or
specifications, requires authorization from the Department.
30. Any damage to present highway facilities including traffic control devices shall be repaired
immediately at no cost to the Department and prior to continuing other work.
31. During access construction, no construction -related, personal vehicles will be permitted to
park in the state highway right-of-way.
32. Any mud or other material tracked, or otherwise deposited, on the roadway shall be
removed daily or as ordered by the Department inspector. If mud is an obvious condition
during site construction, it is recommended that the contractor build a Stabilized
Construction Entrance or Scrubber Pad at the intended construction access to aid in the
removal of mud and debris from vehicle tires. The details of the Stabilized Construction
Entrance can be found in the M Et S Standards Plan No. M-208-1.
33. A fully -executed, complete copy of this permit and the Notice to Proceed must be on the
job site with the contractor at all times during the construction. Failure to comply with this
or any other construction requirement may result in the immediate suspension of work by
order of the Department inspector or the issuing authority.
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
34. No work will be allowed at night, Saturdays, Sundays and legal holidays without prior
authorization from the Department. The Department may also restrict work within the
State Highway right-of-way during adverse weather conditions.
35. The access shall be completed in an expeditious and safe manner and shall be completed
within 45 days from initiation of construction within State Highway right-of-way or in
accordance with written concurrence of the Access Manager. All construction shall be
completed in a single season.
36. All costs associated with any type of utility work will be at the sole responsibility and cost of
the Permittee and at no cost to CDOT.
37. Areas of roadway and/or right-of-way disturbed during this installation shall be restored to
their original conditions to insure proper strength and stability, drainage and erosion
control. Restoration shall meet the Department's standard specifications for topsoil,
fertilization, mulching, and re -seeding.
38. Upon the completion of the access (and prior to any use as allowed by this permit), the
Applicant shall notify the Region 3 Access Manager by certified mail within 10 days to
request a final inspection. This request shall include certification that all materials and
construction have been completed in accordance with all applicable Department Standards
and Specifications; and that the access is constructed in conformance with the State
Highway Access Code, 2 CCR 601-1, including this permit. The Engineer of Record as
indicated on the construction plans, may be requested by the Department for this
inspection. The access serviced by this permit may not be opened to traffic until written
approval has been given from the CDOT Access Manager.
Construction Completion & Final Acceptance
39. The Permittee shall construct all improvements stated on this permit prior to any use as
allowed by this permit. The Permittee shall notify the Permit Manager by certified mail within
10 working days to request a final inspection. This request shall include signed and sealed
certification that all materials and construction have been completed in accordance with all
applicable Department Standards and Specifications; and that the access is constructed in
conformance with the State Highway Access Code, 2 CCR 601-1, and the terms and
conditions included in this permit. The engineer of record shall be present for this inspection.
The access serviced by this permit may not be opened to traffic until the CDOT Access
Manager provides written initial approval.
40. Following the final inspection, CDOT will prepare an Access Construction Inspection Summary
Letter and send it to the applicant, Permittee, and engineer of record. If additional items are
required to complete the access construction, a list of these items will be part of the access
construction inspection summary letter. All required items and final as -built survey shall be
completed within 30 days from receiving the Access Construction Summary Letter. The access
serviced by this permit may not be opened to traffic until written approval has been given from
the CDOT Access Manager. If all work appears to have been done in general close conformity
with the above named permit, an initial acceptance letter will be sent to the Permittee and this
access may be opened for traffic.
STATE of COLORADO HIGHWAY ACCESS PERMIT
ADDITIONAL TERMS and CONDITIONS
September 15, 2017 PERMIT No. 317063
Permittee(s): Berkeley Family Limited Partnership
Location: Garfield County on CO Highway 082A, near Mile Ref. Pt. 6.654 Left
41. The 2 year warrantee period will begin when the initial acceptance letter is issued. In
accordance with section 2.5(6) of the State Highway Access Code, if any construction element
fails within two -years due to improper construction or material specifications, the Permittee
shall be responsible for all repairs. Failure to make such repairs may result in suspension of
the permit and closure of the access. The letter of final acceptance will be issued once the
access has been inspected and is found to comply with all material and construction in
accordance with all applicable Department Standards and Specifications approximately 2
years after initial acceptance.
COLORADO
Department of
Transportation
What is stormwater runoff?
Stormwater runoff occurs when precipitation from rain or snowmelt
flows over the ground. Impervious surfaces like roads and sidewalks
prevent stormwater from naturally soaking into the ground
Why is stormwater runoff a problem?
Stormwater can pick up debris, chemicals, dirt and other
pollutants and flow into CDOT's storm drain system or directly
into a stream, river, lake, wetland or reservoir. Anything that
enters CDOT's storm drain system is discharged untreated into
the waterways we use for fishing, swimming, and providing
drinking water.
Dredged spoil, dirt, slurry, solid waste, incinerator
residue, sewage, sewage sludge, garbage, trash,
chemical waste, biological nutrient, biological
material, radioactive material, heat, pH, wrecked or
discarded equipment, rock, sand, any industrial,
municipal, or agricultural waste.
Tips for Reporting an Illicit Discharge
Call the illicit discharge hotline at (303) 512-4426
From a safe distance try to estimate the amount of
the discharge.
Identify characteristics of the discharge (color, odor,
algae, etc.).
Obtain information on the vehicle dumping the
waste (if applicable).
Do not approach!
Call *CSP for illicit dumping.
If possible, take a photo, record a license plate.
REMEMBER:
Never get too close to the illicit discharge, it may
be dangerous!!!
For more information on CDOT Utility
Permits:
https://www.codot.gov/business/permits/utilitie
sspecialuse
For more information on CDOT Access
Permits:
https://www.codot.gov/business/permits/access
permits
For more information on CDOT Water Quality
Program:
Water Quality Program Manager
4201 E. Arkansas Ave.
Shumate Building
Denver, Colorado 80222
303-757-9343
COLORADO
Department of
Transportation
Water Quality IDrctram
Industrial Facilities
IDrc!ram
CDOT has a Municipal Separate Storm Sewer System permit,
otherwise known as (MS4) from the Colorado Department of
Public Health and Environment. The permit states that only
stormwater can be discharged from CDOT's storm drain system
TO THE WASTEWATER
TREATMENT PLANT
TOTHELOCAL
WATERBOBY
As part of the permit, CDOT has several different
programs to prevent pollutants from entering into
the storm drain system:
Construction Site Program
New Development Redevelopment Program
Illicit Discharge Program
Industrial Facilities Program
Public Education and Outreach Program
Pollution Prevention and Good Housekeeping
Program
Wet Weather Monitoring Program
COLORADO
Department of
Transportation
Control Measures
for Industrial
Facilities
Industrial facilities can use control measures (CM)
otherwise known as Best Management Practices
(BMP) during the construction of a facility and when
operating the facility. Control measures are schedules
of activities, maintenance procedures, and other
management practices to prevent and reduce
pollution entering into CDOT's storm drain system.
Control Measures also include treatment, operating
procedures, and practices to control site run off
which can include structural and non-structural
controls.
THE GAUNTLET
.
PORETHnHT
ANTsa
.3"
IS THIS THE
MINER !NM FOR
THEPpLUTANf7
IS THE MMP
PROPERLY
MAINTAINED?
In compliance!!
CDOT defines a utility, or utility facility as any
privately, publicly, or cooperatively owned
line, facility, or system producing, transmitting
or distributing the following:
✓ Communications
✓ Cable television
✓ Power
✓ Electricity
✓ Light
✓ Heat Gas
✓ Oil
✓ Crude Products
✓ Water
✓ Stream
✓ Waste
✓ Stormwater not connected with highway drainage
✓ Similar Commodity
COLORADO
Department of
Transportation
Industrial Facilities Program Elements:
1. Educate and outreach to owners
or operators that have potential to
contribute substantial pollutant to
water.
2. Report and include information on
discharge and water quality
concerns. Provide written
notification within 15 days of
discovery to CDPHE.
3. Submit an annual report to CDPHE
containing the number of
informational brochures
distributed; name and title of each
individual trained.
Education
There are instances when a utility
company or other entity doing work in the
state highway right-of-way will require
some type of environmental permit or
clearance for that work. CDOT has put
together an Environmental Clearances
Information Summary for those applying
for a CDOT Utility and Special Use Permit
or Access Permit to obtain all required
clearances. This fact sheet is given to each
permittee and is available at:
http://www.coloradodotinfo/programs/
environmental/ resources/guidance-
standards/Environmental%20Clearances%
20Info%20Summary.pdf
COLORADO DEPARTMENT OF TRANSPORTATION
Environmental Clearances Information Summary
PURPOSE - This summary is intended to inform entities external to CDOT that may be entering the state highway right-of-way to
perform work related to their own facilities (such as Utility, Special Use or Access Permittees), about some of the more commonly
encountered environmental permits/clearances that may apply to their activities. This listing is not all-inclusive - additional
environmental or cultural resource permits/clearances may be required in certain instances. Appropriate local, state and federal
agencies should be contacted for additional information if there is any uncertainty about what permits/clearances are required for a
specific activity. IMPORTANT — Please Review The Following Information Carefully — Failure to Comply With Regulatory
Requirements May Result In Suspension or Revocation of Your CDOT Permit, Or Enforcement Actions By Other Agencies
CLEARANCE CONTACTS - As indicated in the permit/clearance descriptions listed below, the following individuals or agencies
may be contacted for additional information:
• Colorado Department of Public Health and Environment (CDPHE): General Information — (303) 692-2035
Water Quality Control Division (WQCD): (303) 692-3500
Environmental Permitting Website https://www.colorado.gov/pacific/cdphe/all-permits
• CDOT Water Quality Program Manager: (303) 757-9343 https://www.codot.gov/programs/environmental/water-quality
• CDOT Asbestos Project Manager: Phil Kangas, (303) 512-5519
• Colorado Office of Archaeology and Historic Preservation: (303) 866-3395
• U.S. Army Corps of Engineers, District Regulatory Offices:
Omaha District (NE CO), Denver Office (303) 979-4120
http://www. nwo. usace.army.mil/Missions/Reg ulatoryProgram/Colorado.aspx
Sacramento Dist. (Western CO), Grand Junction Office (970) 243-1199
http://www.spk.usace.army.mil/Missions/Regulatory.aspx
Albuquerque District (SE CO), Pueblo Office (719)-543-9459
http://www.spa. usace.army.mil/Missions/RegulatoryProgramand Permits.aspx
• CDOT Utilities, Special Use and Access Permitting: (303) 757-9654 https://www.codot.gov/business/permits
Wildlife Resources - Disturbance of wildlife shall be avoided to the maximum extent practicable. Entry into areas of known or
suspected threatened or endangered species habitat will require special authorization from the CDOT permitting office. If any
threatened or endangered species are encountered during the progress of the permitted work, work in the subject area shall be halted
and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately.
Authorization must be provided by CDOT prior to the continuation of work. Information about threatened or endangered species may
be obtained from the CDOT website, http://www.codot.gov/programs/environmental/wildlife/guidelines, or the Colorado Parks and
Wildlife (CPW) website, http://www.cpw.state.co.us/learn/Pages/SOC-ThreatenedEndangeredList.aspx. Additional guidance may be
provided by the appropriate Region Planning and Environmental Manager (RPEM).
Cultural Resources - The applicant must request a file search of the permit area through the Colorado Office of Archaeology and
Historic Preservation (OAHP), Denver, to ascertain if historic or archaeological resources have previously been identified
(http://www.historycolorado.orq/oahp/file-search). Inventory of the permit area by a qualified cultural resources specialist may be
necessary, per the recommendation of CDOT. If archaeological sites/artifacts or historic resources are known to exist prior to the
initiation of the permitted work or are encountered as the project progresses, all work in the subject area shall be halted and the CDOT
Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be
provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office and
RPEM. Contact Information: Contact the OAHP for file searches at (303) 866-3395.
Paleontological Resources - The applicant must request a fossil locality file search through the University of Colorado Museum,
Boulder (https://cumuseum.colorado.edu/research/paleontology/vertebrates/policies), and the Denver Museum of Nature and Science
(http://www.dmns.org/science/collections/earth-science-collections/) to ascertain if paleontological resources have been previously
identified in or near the permit area. Inventory of the permit area by a qualified paleontologist may be necessary, per the
recommendation of CDOT. If fossils are encountered during the permitted work, all work in the subject area shall be halted and the
CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization
must be provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office
in the Permit Special Provisions. Contact Information: See the museum websites listed above for Paleontological Collections
Manager contact information. Contact the CDOT Paleontologist for further information at nicole.peavey@state.co.us or (303) 757-
9632. The CDOT Paleontologist will not conduct a comprehensive file search independently of the museums.
Hazardous Materials, Solid Waste - The Solid Wastes Disposal Sites and Facilities Act C.R.S. 30-20-100, et al, and Regulations
Pertaining to Solid Waste Disposal Sites and Facilities (6 CCR 1007-2), prohibit solid waste disposal without an approved Certificate
of Designation (a landfill permit). The Colorado Hazardous Waste Act C.R.S. 25-15-301 et al, and the Colorado Hazardous Waste
Regulations (6 CCR 1007-3) prohibit the transfer, storage or disposal (TSD) of hazardous waste except at permitted TSD sites. There
are no permitted landfills or TSD sites within the State Highway Right of Way. Therefore, all solid or hazardous wastes that might be
generated by the activities of entities entering the State Highway Right of Way must be removed from the ROW and disposed of at a
permitted facility or designated collection point (e.g., for solid waste, a utility or construction company's own dumpster). If pre-existing
solid waste or hazardous materials contamination (including oil or petroleum contaminated soil, asbestos, chemicals, mine tailings,
etc.) is encountered during the performance of work, the permittee shall halt work in the affected area and immediately contact the
CDOT Regional Permitting Office for direction as to how to proceed. Contact Information: Theresa Santangelo-Dreiling, CDOT
Hazardous Materials Project Manager, (303) 512-5524, or Andy Flurkey, (303) 512-5520.
Asbestos Containing Materials, Asbestos Contaminated Soil - All work on asbestos containing materials (ACM) must comply with
the applicable requirements of the CDPHE Air Pollution Control Division's (APCD) Regulation 8. Disposal of ACM, and work done in
asbestos -contaminated soil, must comply with the CDPHE Hazardous Materials and Waste Management Division's (HMWMD) Solid
Environmental Clearances Information Summary
Page 1 of 3
Colorado Department of Transportation May '16
Waste Regulations. The application for any CDOT permit must specifically identify any ACM involved in the work for which
authorization is being requested. Additional guidance or requirements may be specified in the permit special provisions. Contact
Info: CDPHE APCD and HMWMD Regulations can be accessed via the CDPHE Environmental Permitting Website listed above.
Additional information concerning clearance on CDOT projects is available from the CDOT Asbestos Project Manager (303) 512-
5519, or Theresa Santangelo-Dreiling, Hazardous Materials Management Supervisor (303) 512-5524.
Transportation of Hazardous Materials - No person may offer or accept a hazardous material for transportation in commerce unless
that person is registered in conformance with the United States Department of Transportation regulations at 49 CFR, Part 171. The
hazardous material must be properly classed, described, packaged, marked, labeled, and in condition for shipment as required or
authorized by applicable requirements, or an exemption, approval or registration has been issued. Vehicles requiring a placard, must
obtain authorization and a State HAZMAT Permit from the Colorado Public Utilities Commission. Contact Information: For
authorization and more info call the Federal Motor Safety Carrier Administration, US DOT for inter- and intra -state HAZMAT
Registration (303) 969-6748. Colorado Public Utilities Commission: (303) 894-2868.
_
Discharge of Dredged or Fill Material — 404 Permits Administered By the U.S. Army Corps of Engineers, and Section 401
Water Quality Certifications Issued by the CDPHE WQCD - Corps of Engineers 404 permits are required for the discharge of
dredged or fill materials into waters of the United States, including wetlands. There are various types of 404 permits, including
nationwide permits, which are issued for activities with relatively minor impacts. For example, there is a nationwide permit for utility
line activities (nwp #12). Depending upon the specific circumstances, it is possible that either a "general" or "individual" 404 permit
would be required. If an individual 404 permit is required, section 401 water quality certification from the CDPHE WQCD is also
required. Contact the appropriate Corps District Regulatory Office for information about what type of 404 permit may be required
(contact information above). Contact the CDPHE Water Quality Control Division at (303) 692-3500.
Working on or in any stream or its bank - In order to protect and preserve the state's fish and wildlife resources from actions that
may obstruct, diminish, destroy, change, modify, or vary a natural existing stream or its banks or tributaries, it may be necessary to
obtain a Senate Bill 40 certification from the Colorado Department of Natural Resources. A stream is defined as 1) represented by a
solid blue line on USGS 7.5' quadrangle maps; and/or 2) intermittent streams providing live water beneficial to fish and wildlife; and/or
3) segments of streams supporting 25% or more cover within 100 yards upstream or downstream of the project; and/or 4) segments of
streams having wetlands present within 200 yards upstream or downstream of the project measured by valley length. The CPW
application, as per guidelines agreed upon by CDOT and CPW, can be accessed at
http://www.coloradodot.info/programs/environmental/wildlife/guidelines.
Stormwater Construction Permit (SCP) and Stormwater Discharge From Industrial Facilities - Discharges of stormwater runoff
from construction sites disturbing one acre or more - or certain types of industrial facilities, such as concrete batch plants - requires a
CDPS Stormwater Permit. Contact Information: Contact the CDPHE Water Quality Control Division at (303) 692-3500. Website:
https://www.colorado.gov/pacific/cdphe/wq-construction-general-permits and https://colorado.gov/pacific/cdphe/wq-commerce-and-
industry-permits.
Construction Dewatering (Discharge or Infiltration) and Remediation Activities - Discharges of water encountered during
excavation or work in wet areas may require a Construction Dewatering or Remediation Activities Discharge Permit. Contact
Information: For Construction Dewatering and Remediation Activities Discharge Permits, contact the CDPHE WQCD at (303) 692-
3500. For Applications and Instructions (CDPHE website): https://www.colorado.gov/pacific/cdphe/wq-construction-general-permits.
Municipal Separate Storm Sewer System (MS4) Discharge Permit - Discharges from the storm sewer systems of larger
municipalities, and from the CDOT highway drainage system that lies within those municipalities, are subject to MS4 Permits issued
by the CDPHE WQCD. For facilities that lie within the boundaries of a municipality that is subject to an MS4 permit, the owner of such
facility should contact the municipality regarding stormwater related clearances that may have been established under that
municipality's MS4 permit. All discharges to the CDOT highway drainage system or within the Right of Way (ROW) must comply with
the applicable provisions of the Colorado Water Quality Control Act, the Water Quality Control Commission (WQCC) Regulations
(https://www.colorado.gov/pacific/cdphe/wqcc-regulations-and-policies-and-water-quality-statutes) and the CDOT MS4 Permit # COS -
000005 (https://www.codot.gov/programs/environmental/water-quality/documents). Discharges are subject to inspection by CDOT
and CDPHE. Contact the CDPHE Water Quality Control Division at (303) 692-3500 for a listing of municipalities required to obtain
MS4 Permits, or go to https://www.colorado.gov/pacific/cdphe/wq-municipal-ms4-permits.
General Prohibition — Discharges - All discharges are subject to the provisions of the Colorado Water Quality Control Act and the
Colorado Discharge Permit Regulations. Prohibited discharges include, but are not limited to, substances such as wash water, paint,
automotive fluids, solvents, oils or soaps and sediment. Contact Information: Contact the CDPHE Water Quality Control Division at
(303) 692-3500.
General Authorization - Allowable Non-Stormwater Discharges - Unless otherwise identified by CDOT or the WQCD as significant
sources of pollutants to the waters of the State, the following discharges to stormwater systems are allowed without a Colorado
Discharge Permit System permit: landscape irrigation, diverted stream flows, uncontaminated ground water infiltration to separate
storm sewers, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water,
uncontaminated springs, footing drains, water line flushing, flows from riparian habitats and wetlands, and flow from firefighting
activities. Allowable non-stormwater discharges can be found at https://www.codot.gov/programs/environmental/water-
quality/glossary.html. Contact Information: The CDPHE Water Quality Control Division (telephone #'s listed above).
Erosion and Sediment Control Practices - For activities requiring a Stormwater Construction Permit, erosion control requirements
will be specified in that permit. In those situations where a stormwater permit is not required, all reasonable measures should be
taken in order to minimize erosion and sedimentation according to CDOT Standard Specifications 107.25 and 208. All disturbances
require a stabilization plan, native seeding or landscape design plan according to applicable CDOT Standard Specifications 212-217
and 623. In any case, the CDOT Erosion Control and Stormwater Quality Guide (most recent version) should be used to design
erosion controls and to restore disturbed vegetation. Contact Information: The CDOT Erosion Control and Stormwater Quality Guide
may be obtained from the Bid Plans Office at (303) 757-9313 or from: https://www.codot.gov/programs/environmental/landscape-
architecture/erosion-storm-quality.
Environmental Clearances Information Summary
Page 2 of 3
Colorado Department of Transportation May '16
Disposal of Drilling Fluids - Drilling fluids used in operations such as Horizontal Directional Drilling may be classified as "discharges"
or "solid wastes," and in general, should be pumped or vacuumed from the construction area, removed from the State Highway Right
of Way, and disposed of at permitted facilities that specifically accept such wastes. Disposal of drilling fluids into storm drains, storm
sewers, roadside ditches or any other type of man-made or natural waterway is prohibited by Water Quality Control and/or Solid
Waste regulations. Small quantities of drilling fluid solids (less than 1 cubic yard of solids) may be left on-site after either being
separated from fluids or after infiltration of the water, provided: 1) the drilling fluid consists of only water and bentonite clay, or, if
required for proper drilling properties, small quantities of polymer additives that are approved for use in drinking water well drilling; 2)
the solids are fully contained in a pit, and are not likely to pose a nuisance to future work in the area, 3) the solids are covered and the
area restored as required by CDOT permit requirements (Utility, Special Use, or Access Permits, etc.). Contact Information:
Contact CDPHE (telephone #'s listed above).
Noxious Weeds and Invasive Species Management Plan — Noxious Weeds and Invasive Species guidance can be found by
contacting the Colorado Department of Agriculture (https://www.colorado.gov/pacific/agconservation/noxiousweeds) and the
Colorado Division of Parks and Wildlife (http://cpw.state.co.us/aboutus/Pages/RS-NoxiousWeeds.aspx). In either case, management
plans involving the control of noxious weeds associated with the permitted activity and cleaning of equipment will be required.
Concrete Washout - Waste generated from concrete activities shall NOT be allowed to flow into the drainage ways, inlets, receiving
waters, or in the CDOT ROW. Concrete waste shall be placed in a temporary concrete washout facility and must be located a
minimum of 50 feet from state waters, drainageways, and inlets. Concrete washout shall only be performed as specified by the CDOT
Environmental Program and shall be in accordance to CDOT specifications and guidelines. Contact Information: Contact CDPHE or
find additional information on the CDOT website: https://www.codot.gov/business/designsupport/2011-construction-
pecifications/2011-Specs and refer to the specifications and their revisions for sections 101, 107 and 208.
Spill Reporting - Spills shall be contained and cleaned up as soon as possible. Spills shall NOT be washed down into the storm
drain or buried. All spills shall be reported to the CDOT Illicit Discharge Hotline at (303) 512-4446 (4H20), as well as the Regional
Permitting Office and Regional Maintenance Supervisor. Spills on highways, into waterways, any spill in the highway right-of-way
exceeding 25 gallons, or that may otherwise present an immediate danger to the public shall be reported by calling 911, and shall also
be reported to the CDPHE at 1-877-518-5608. More information can be found at https://www.colorado.gov/pacific/cdphe/emergency-
reportinq-line.
_
About This Form - Questions or comments about this Information Summary may be directed to Alex Karami, Program Administrator,
CDOT Access Management Unit, at (303) 757-9841, alex.karami@state.co.us.
Environmental Clearances Information Summary Page 3 of 3