HomeMy WebLinkAboutSteel Inspection ReportDecember 19, 201,1
GENERAL STEEL CORPORAT]ON
10639 BRADFORD RD
LTTTLETON, CO 80127
REGEIVED
DEC 2 I 20.17
GARFIEI.D COUNTY
COMMUNITY DEVELOPMENT15-B-88709
VANGUARD OPERAT]NG LLC
2800 CASTLE, CO
NEv{ CASTLE, CO 81"641
36r_0" x 6Bt_0" x l-3t-0"
To Vfhom Tt May Concern:
This is to certify that materials for the subject structure require no
modifications, for a building code change from IBC 2012 to IBC 2015.
The materials provided by the manufacturer, are designed for the maximum of either
the code calculated ffat roof snow of 28 psf, in conjunction with the code
calculated unbalanced snow load, or the requested, minimum roof snow load of 40
Cordiafly,
Star Buifding Systems
Materials for Metaf Buildings
An NCI Company
017-12-19 15:27:10Allen D. Hurtz, P.E.
Director of Engineering
r5-B-887o9