HomeMy WebLinkAboutApplicationGørfield County
GRADING PERMIT
APPL¡CATIONCommunity Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970194s-82t2
www.garfield-countv.com
WPE OF GRADING
tr MAJoR tr MINoR
INVOTVED PARTIES
property owner: Mark Magidson c/o Tim Casey (see letter) phone: É101 911916_
Mailing Address: 10111Jefferson Blvd, Culver City, CA.90232
Emait Address. markm@moldex.com
contractor: Matt Weaver - Five Rivers, lnc Phone:406)09-1970
Mailing Address: 32 Discovery Drive, Bozeman, MT 59718
Emait Address. mattweaver406@gmail.com
Architect: Mike Claffey - Claffey Ecological Consulting, lnc phone: €19L919j183_
Mailing Address:1371 CR 17, Fruita, CO 81521
Emait Addrerr. mclaffey@acsol.net
Engineer . Colorado River Engineering Phone: (970) p25-4933
Mailing Address: 136 East 3rd Street, Rifle, CO 81650
EmailAddress . wendy@coloradorivereng.com
PROJECT NAME AND TOCANON
Project N ame:Meadow Creek Ranch Stream Restoration and Aquatic Habitat Restoration
Describe Work: See FDPA-09-17-8576 The planned work consists of creek restoration activities and fìshery
habitat improvement. The channel and adjacent riparian areas have been heavily impacted by cattle
and sheep grazing, this project aims to restore the creek channel to a natural condition,
improve aquatic and riparian habitats, and better manage livestock and irrigation practices
Job Address:1862 County Road 243, New Castle, CO 81647
Assesso/s parcet Number: 212514200125
Sub.Lot Block
Earthwork (square feet) :Earthwork (Cubic Yards).576
AtL UTILITIES MUST BE TOCATED PRIOR TO ANY GRADING
NOTICE
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
to the best of my knowledge.
5t411B
Property Owner Print and Sign Date
have provided the required information which is correct and accurateMichae Blil'3li:flËij"lJjTåi%"11ï3ä=c,aneyEcorosiærou=t---
Claffey 'oI''"!
'o'' ou oo 16140103 -06'00'
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or
anauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe
Owner, must be provided with this Application.
Legal Access. ABuildingPermitcannotbeissuedwithoutproof of legal andadequateaccesstothepropertyfor
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
VoidPermit. ABuildingPermitbecomesnull andvoidiftheworkauthorizedisnotcommencedwithinlS0daysof
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), describcd abovc, arc not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ics) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
OFFICIAL USE ONLY
speciarconditi"i" F.'^o-s llt Ç,a*-n5 gF 57174'4ttlLr¿/pS'ilLtr M G*/ 7'"s7r,*r, ?,¡.t^trs
flr,ùßq ß** l,\ur,n* X/o, 'ßzov.tauÐ
Fees Paid:loo-Permit Fee: r
lD0 -Misc Feú:Total Fees:
IDo-
.lnlssue Date:Zoning:
R
lance due:
ú
Ba Gradinp Permit:
ø8#D-0M
Approval
5-R-Zo )BBUILDING / PLANNING DIVISION
Date
?v [0o.Do,6 1 lg
Andy Schwaller
From:
Sent:
To:
Subiect:
Attachments:
Steve Anthony
Tuesday, May 08, 2018 7:50 AM
Andy Schwaller
RE: Attached Image
FDPA -09-L7-8576 Meadow Creek Ranch Stream Restoration.pdf
Hi Andy,
I agree on the security deposit, not needed due to the size of the restoration.
I was on site yesterday and met with their weed sprayer. They just finished up a few days worth of weed treatment up
there. I don't really have anything to add to the attached comments for the land use change permit.
Mike Claffey has informed me that they plan on contacting the Conservation Districts for weed mapping.
Everything seems to be in order on this one, no additional comments from me.
Steve
From: Andy Schwaller
Sent: Monday, May 7,2OL8 3:08 PM
To: Steve Anthony <santhony@garfield-county.com>
Subject: FW: Attached lmage
Steve,
Thanks for the seed mixture. lt is really hard not to put too much seed down. I will let you know how it comes out.
I believe you have been involved with this project already. I am inclined not to require a security deposit since the area
is less than 1- acre. We can use the grading permit to verify a weed inventory, stormwater permit and to require
reveg. Let me know your thoughts. I think they are already spraying weeds as per Wendy Ryan.
Thanks,
Andy
From: copvmachine@garfield-countv.com Imailto:copvmachine@garfield-countv.com]
Sent: Monday, May 07,2OLB 3:02 PM
To: Andy Schwaller <aschwa ller@ga rfield-countv.com>
Subject: Attached lmage
1
Gaffield Col,rnty
Vegetatíon Mønagemenl
February 21,2018
Glenn Hartmann
Garfield County Community Development Department
RE: FDPA-09-17-8576 Meadow Creek Ranch Aquatic Habitat lmprovement Project
Dear Glenn,
Thank you for the opportunity to comment on the permit.
It is requested that the applicant provide a noxious weed map or inventory of Garfield County listed noxious weeds (list is
attached) for:
The Elk Creek restoration corridor.
lrrigated and non-irrigated meadows and pastures located within the parcel"
Any Russian-olive found on the parcel.
The irrigation ditches on the property.
Noxious weeds that may be on the property are: Yellow toadflax, spotted knapweed, musk thistle, oxeye daisy and
Russian-olive.
Once the inventory/map is completed, we request that the applicant provide a noxÍous weed management plan that
provides for management options and a treatment schedule.
We request that the applicant provide the riparian seed mix to be used with scientific and common name.
Staff is available to meet with the landowner or property managers to discuss both short and long-term weed
management of this property.
Sincerely,
a
a
a
a
a,
Steve Anthony
Garfield County Vegetation Manager
195 W. 146 Street Bldg. D, Suite 310
Rifle, CO 81650 Phone: 970-945-1377 x4305 Mobile Phone: 970-379.f450
Colo rq do Rive r Eng ineering
736 Esst 3'd Street
Rifle, CO 87650
EN6INETRING
t¡coSPrrIlATso
May 4,2Ot8
Mr. Andy Schwaller
Building and Planning, Garfield County
L08 Eighth Street, Suite 40L
Glenwood Springs, Colorado 8L601
RE: Grading Permit Request - Meadow Creek Ranch (MCR) - Stream Restoration & Stabilization
Project.
Dear Mr. Schwaller:
Colorado River Engineering is providing this letter to supplement a Garfield County grading permit
application for a planned stream restoration and aquatic habitat improvement project located on
Main Elk Creek within the boundaries of Meadow Creek Ranch (PlN: 21251420OL25). The work
being completed in the channel is covered under a U.S. Army Corps of Engineers General Permit l-2
(SPK-2017-00295) and a Garfield County floodplain development permit (FDPA-09-L7-8576), both
of which are attached. A requirement of the FDPA was that a grading permit be obtained in order
to bond the revegetation/weed control portion of the stream restoration work. A CDPHE
stormwater permit is also being obtained for work outside of the channel and focuses on an upland
area where cobble will be harvested. The vast majority of work being proposed is below the
ordinary high water line of Main Elk Creek with the exception of a few spots where eroded banks
need to be sloped back; therefore the main purpose of this permit is to secure the revegetation of
all disturbed areas above the high water line in the channel of Main Elk Creek. A vicinity map is
attached as Figure 1-.
Although this works falls into the category of "minor grading permit" based on the amount of
grading, we are providing the revegetation and reclamation plan as requested in the FDPA. Total fill
for coir lifts, cobble toe placement, willow clumps and topsoil placement on bars totals L3,520
square feet. No cut or fill will be done in the cobble harvest area; cobbles will simply be harvested
from the surface. The cobble harvest revegetation area is included in the revegetation bonding cost
estimate, but that area will not be graded and is not included in the total area to be graded.
Site Plan
Many of the requirements of the site plan are not applicable to this project. All of the work is being
done within the property boundaries of the applicant. Design sheets and typical cross sections of
work to be performed from Five Rivers, lnc are attached to this document. The design sheets being
provided illustrate the extent of the work to be performed in the channel. This area has not
mapped by FEMA, therefore no floodplain maps are available. A General Site Plan is attached as
Figure 2 showing the existing contours (topographic map), restoration extent, existing roads,
property boundaries, and streams. ln addition to this general map, areas of restoration are further
detailed in the attached design sheets from Five Rivers, lnc.
2018-05-04 GarCO Grading Perm¡t Letter 1of4
o Col o rs do RÍve r Eng ì nee ring
736 Eçst 3'd Street
Rifle, CO 81650
ENCINEERIN6
tr{ûttPoR^Tt:o
Erosion Control Plan
ln the channel, the main goal of this restoration work is to repair and control erosion that has
already taken place due to overgrazing and flooding. Once restoration has taken place, small cobble
coffer dams can be placed upstream of areas where major excavation work is underway to deflect
flows away from the bank. These dams can then be moved downstream where needed and
incorporated into the next feature after bank restoration work is completed.
The erosion control plan for the upland cobble harvest is attached to this application and will be
covered by a CDPHE stormwater permit. There is no grading in this area, but erosion control
measures will be implemented during cobble harvesting.
Soils Report
A soils report is attached.
Vegetation and Reclamation Plan
Soíl und Material Handling
The majority of material that will be handled during this restoration work is river cobble and gravel,
very little soil will actually be worked. Soil removed on-site will be used immediately in the stream
restoration work and will not be stored for more than a few minutes. No long-term soil stockpiles
requiring cover are needed as soil will be used immediately. Erosion control measures will be
implemented in the cobble harvest area and are covered by a CDPHE stormwater permit (see
attached map).
Weed Management PIan
A noxious weed inventory and management plan will be completed by June 30, 2018 per Exhibit A
of the Floodplain Development Permit.
Site RevegetaÍion uncl Restorutíon
The seed mixes used will vary by location of disturbance and are listed below:
General Streambank and Riparian Seed Mix
Western wheatgrass (Pascopyrum smithii)Arriba 25%
Streambank wheatgra ss (Elymus lanceolotus) SODAR 40%
Slender wheatgrass (Elymus trachycoulus) SAN LUIS 15%
Mountain Brome (Bromus marginotusl Garnet2O%
2018-05-04 GarCO Gracling P€rmit Letter 2of4
Colors do RÍve r Eng inee ring
736 Eost g'd street
RíÍle, CO 81650
EN ¡NEER¡
IXGOf,PORATÊO
Rate - 25-30 lbs per ocre - seed raked into soil, ønd lightly tracked packed with equipment ond
ploced in upper coir lifts)
Lower streambanks - lateral bar edges
Streambank wheatgrass (Elymus lanceolatus) SODAR 25%
Western wheatgrass (Pascopyrum smithii) Arriba 25%
Fowl bluegrass (Poø palustrisl25%
Slo ughgras s (B e ckm o n n i a syzi g a ch n e) 25o/o
Rate 25 pounds per acre placed in lower coir lifts, seeded on lsterol bor edges
General Mix
A Western Native Seed Montane Erosion Control Mix (approximately 50 pounds) will be used for
upland disturbance areas and includes the following species:
Mt Brome (Bromus marginatusl45%
Slender Wheatgrass (Elymus trachycaulus) 45%
Western Wheatgras (Pascopyrum smithii) tO%
ln addition to these seed mixes,2,0OO native, nursery grown willow shrubs will be planted as part
of the restoration process. These will be held on-site in a nursery setup and will be watered until
planted.
Planting Schedule
Planting of the disturbed areas will take place after the restoration work has completed. The
stream restoration is scheduled to start on June L5,2018. The seed application rate is provided
above under the different areas that will be reseeded. Seeds will be irrigated if necessary until
established.
Cost Estímate
The estimate for the vegetation and reclamation plan is based on a cost of |z,s}O/acre (per
conversations with Steve Anthony). A fill volumefarea table is attached for the restoration work. A
summary table is provided with the relevant fill areas highlighted in yellow. The revegetation area
estimate includes: coir fabric fill, cobble toe placement, willow clumps and topsoil placement on
bars. The revegetation of the cobble harvest area will be fairly minor as little vegetation exists
there currently (see attached current condition photos) as it is the area of the ranch where cow-calf
pairs are kept. lt is estimated that 5%of the area will require revegetation afterthe cobble harvest
or roughly 0.2 acres. The cobble harvest area is not included in the area that is graded, it is only
2018-05-04 GarCO Grading Permit Letter 3of4
GN6¡NßER¡Nç
tt{conto¡tA?ED
being revegetated. Revegetation work totals 22,232 square feet (0.51 acres) for a total cost
estimate of 51.,276.
lf you have any questions, please do not hesitate to call me at 970-625-4933.
Sincerely,
Wendy Ryan Christopher Manera, P.E
Colorsdo River Engineerîng
736 Eøst 3'd Street
RiÍle, CO 87650
1År,,èþ
2018-05-04 GarCO Grading Permit Letter 4of 4
::ft
ffi
,:i'f-i!
¡tit
,4.
"¡-55 regl
'a¿. ,)
:j0
r tl
Lower,r
Limit'
',).J"
')(,./ ()?;l:
f;gu¡cl
IMeadow Creek Ranch Restoration
Vicinity Map
Legend
úìt.J SïREAMS
¡r,r, I Meadow Creek Ranch
+ Parcels120616
.- SECTIONS
!! rnres
CgìÉ?é IVIAJOR RIVERS
,'r ìr row¡lsHlps
to&A
ft,tVxftsñclNIi[.Rt¡:G
PO Box 1301
Rifle, CO 81650
Tel 970-625-4933
JAMES F
NAN,
¿.:-.BUREAU.: ::'.
OF I.iAND
,MANAGEMENT.
ii
t
¡
<ùt.
MEADOW
CREEK LLC
:'r_.l.¿
t:
EAU
'. .: ,'
1,5 .. J
rl i. ,r ,1-
fìsurc:
2Meadow Creek Ranch Restoration
General Site Plan
llæ STREAI\4S
Meâdow Creek Ranch
Parcelsl 206 1 6
r) secro¡ts
^,r,
HIGHWAYS
Ql trurensreres
^.J LOCAL ROADS
@ Restoration Exteni
Legend
1?f,
Iì¡iGINgg,RINCi
PO Box 1301
Rifle, CO 81650
Tel 970-62s-4933
STATEMENT OF AUTHORITY
The name of the Êntity is ln e *DÐt4)c Ll-t-
and is formed under the laws of
The maili ng address for the Entity is
The name and/or position of the person authorized to execute instruments e bering, orotherwiseaffecting title perty on behalf of the Ent¡ty ¡sto rea
f7Lç
The limitations upon the authority of the person named above or holding the position described a boveto bind the Entity are as fo {if no li sri "None"):¿*,PH CÃft\ö
Other matters concerning the manner in
no other matter, leave this section blank)
which the Ëntity deals with any interest in real property are (if
Lh^)tì-
Signature:
Name (pri nted):c,l<
ËXEcUTED tnis Uftav ot 20J2_.
Ctt
on behalf of
Witness my hand and offícial seal.
My commissíon expires: \)o€*hf .3tJ.jìrù\1
(Date)
Title (if any)rTl ,.¿¡v t?6 tl¿L ,t¡-T^/eâ-,
The ng inst ment wðs acknow
by
srArE oF C¿U$¿*-a-*l
coUNTy oF l¡:' fã.^tg\n. )sT
ledged before me this 1\\ day of ,*5 20 tg
(Notary Public)
Comml¡3lon t 2132ô08
tlot¡r, Puþllc '
Lot Aned.l
Crlllornl¡
IsEALl
letter of Authorlzatlon
January 24,20t.8
Glenn Hartmann
Garfield County Communlty Development
108 Eíght Street, Suite 401.
Glenwood Springs, Colorado 81601
RE: Authorlrrtlon for Consultants for Floodplaln Devetopment Permlt fl tDpA-og-tl.g376
This letter authoriees Colorado Rlver Engineering and Claffey Ecological Consulting, tnc as the primary
contacts for our Aquatlc Habitat Enhancement Project on Meadow Creek Ranch, and the above
referenced Floodplain Development Permlt. Please contact elther firm with additional requests for
information on the creek project, or Mr. Tim Casey who I am äuthor¡zing to act on behalf of
Meadow Creek, LLC in your Statement of Authority Form attached.
5t
Mark MaSidson
Meadow Creek, LLC
MEADOW CREEK RANCH . MAIN ELK CREEK
ESTIMATED FILL VOLUMES/AREAS
STREAM
STATION
LENGTH
FT.
WIDTH
FT.
VOLUME
YDS
AREA
so. FT.
AREA
ACRES
1+00
Pool 60 20 44.44 720 o.o2
Bar BO 15 44.44 720 0.02
2+00
Pool 40 10 14.81 240 0.01
Riffle 30 10 14,81 300 0.01
3+00
Pool 40 10 14.81 240 0.01
4+00
Pool 30 20 22.22 360 0.01
Riffle 30 20 22.22 600 0.01
5+00
Pool 40 20 29.63 480 0.01
Riffle 30 20 29.63 600 0.01
13+00
Pool 35 20 25.93 420 0.01
Bank Toe 90 5 2s.93 450 0.01
16+00
Pool 40 15 22.22 360 0.01
1B+00
Pool 60 20 44.44 720 0.02
Bar 60 15 44.44 540 0.01
19+00
Pool 30 20 22.22 360 0.01
Bar 40 20 22.22 480 0.01
22+OO
Pool 30 20 22.22 360 0.01
24+OO
Pool 30 20 22.22 360 0.01
Bar 40 15 22.22 360 0.01
25+00
Pool 25 20 18,52 300 0.01
26+00
Pool 30 20 22.22 360 0.01
28+00
Pool 40 15 22.22 360 0.01
Bar 60 15 22.22 540 0.01
30+00
Pool 30 20 22.22 360 0.01
34+00
Pool 30 15 L6.67 270 0.01
36+00
Pool 40 15 22.22 360 0.01
Bar 60 15 22.22 540 0.01
3B+00
Pool 40 15 22.22 360 0.01
MEADOW CREEK RANCH - MAIN ËLK CREEK
ESTIMATED FILL VOLUMES/AREAS
STREAM LENGTH WIDTH
FT.
VOLUME
YDS
AREA AREA
ACRESANFTFT
39+00
Pool 30 20 22.22 360 0.01
39+00
Pool 30 20 22.22 360 0.01
40+00
Pool 20 L2 B.89 L44 0.01
41+00
Pool 30 20 22.22 360 0.01
42+00
Pool 30 20 22.22 360 0.01
43+00
Pool 30 15 16.67 270 0.01
44+OO
Pool 40 25 37.04 600 0.01
Riffle 30 10 15.00 300 0.01
Bar 60 15 22.00 s40 0.72
43+00
Pool 35 15 L9.44 315 0.01
Cover Bar 50 15 14.00 450 0.10
47+OO
Riffle 30 10 L6.67 180 0.04
Lower Bed 100 25 92.59 2500 0.5s
Cover Bar t25 30 69.44 3750 0.82
50+00
Pool 45 20 33.33 540 0,01
Riffle 30 20 15.00 600 0.01
52+00
Pool 50 15 27.78 450 0.01
Riffle 30 10 15.00 300 0.01
Bar 30 10 13.00 180 0.04
54+00
Pool 45 20 33.33 540 0.01
56+00
Pool 40 20 29.63 480 0.01
Bar 60 15 29.63 540 0.01
5B+00
Pool 40 20 29.63 480 0,01
59+00
Pool 3s t2 15.56 252 0.01
Riffle 30 15 15.00 450 0.01
Bar 50 15 16.00 450 0.10
60+00
Pool 50 15 27.78 450 0.01
Bar 50 15 28.00 450 0.10
MEADOW CREEK RANCH . MAIN ELK CREEK
ESTIMATED FILL VOLUMES/AREAS
STREAM
STATION
LENGTH
FT.
WIDTH
FT.
VOLUME
YDS
AREA AREA
FT
62+00
Pool 50 20 37.04 600 0.01
Riffle 30 20 20.00 600 0.01
Bar 50 15 37.OO 450 0.10
63+00
Pool 50 15 27.78 450 0.01
Riffle 30 15 20.00 450 0.01
Bar 50 15 28.00 450 0.10
67+00
Pool 45 20 33.33 540 0.01
77+O0
Coir Bank 240 5 BB.89 1200 0.26
89+00
Coir Bank 150 5 55.56 750 0.16
101+00
Pool 40 15 22.22 360 0.01
Riffle 40 15 20.00 600 0.01
Bar 50 15 22.00 450 0.10
103+00
Pool 50 20 37.04 600 0.01
Riffle 40 15 20.00 600 0.01
Bar 60 15 37.00 540 0.L2
105+00
Pool 40 l_5 22.22 360 0.01
Riffle 30 15 15.00 450 0.01
107+00
Pool 50 20 37.O4 600 0.01
Riffle 40 15 20.00 600 0.01
108+00
Bank Willow Clumps s3,33 480 0.01
Cobble Toe 220 5 81.48 1 100 0.24
1 13+00
Pool 35 15 L9.44 315 0.01
Bar 65 15 19,00 5Bs 0.13
1 14+00
Pool 35 15 t9.44 315 0,01
Bar 65 15 19.00 5Bs 0.13
117+00
Pool 40 15 22.22 360 0,01
Riffle 40 15 20.00 600 0.01
Bar 60 15 22.00 540 0.L2
121+00
Pool 35 L2 15.56 2s2 0.01
Riffle 40 15 20.00 600 0.01
Bar 60 25 16.00 900 0.20
MEADOW CREEK RANCH . MAIN ELK CREEK
ESTIMATED FILL VOLUMES/AREAS
STREAM
STATION
LENGTH
FT.
WIDTH
FT.
VOLUME
YDS
AREA AREA
ACRESFT
126+00
Pool 50 20 37.04 600 0,01
Bar 60 10 37.00 360 0.08
126+00
Pool 35 15 t9.44 315 0.01
Bar 40 10 19.00 240 0.05
130+50
Pool 35 15 19.44 315 0.01
Riffle 40 15 20.00 600 0.01
Bar 40 15 19.00 360 0.08
131+50
Pool 40 15 22.22 360 0,01
Bar 35 15 22.00 315 0.07
132+00
Pool 30 20 22.22 360 0.01
Bar 55 15 22.04 495 0.11
133+50
Pool 50 15 27.78 450 0.01
Bar 70 15 28.00 630 o.I4
135+00
Bank Willow Clumps 35.56 480 0.01
Cobble Toe r20 5 44.44 600 0.13
Pool 40 20 29.63 480 0.01
Bar 55 15 30.00 495 0.11
137+00
Pool 30 20 22.22 360 0.01
Bar 40 15 22.OO 360 0.08
Pool Excavation
Excavated Volume - Yds.1413.15
Area - Sq. Ft,2LL23.OO
Area - Acres 0,48
te Bar nstruction
Volume Placed Yds.685.41
Area - Sq. Ft.13095.00
Area - Acres
Place Cobble in Riffle
0.30
Volume Placed Yds 279.44
Area - Sq. Ft.i 82s0.00
Area - Acres 0.19
Bank Repair - Coir Fabric Fill
Volume Placed - Yds r73.33
Area - Sq. Ft.3900.00
Area - Acres 0.09
ir - Cobble Toe Placement
ble Toe Volume - YdsCo
Bank
296.30
Cobble Toe Area - Sq. Ft 4100.00
Cobble Toe Area - Acres 0.09
BB.89
nBa k ir W¡cllow u m
emVou su
Clump Area - Sq. Ft 1320.00
Clump - Acres 0.03
83.44
Topsoil Placement on Bars
Topsoil Volume - Yds
4200.00Topsoil Area - Sq. Ft
0.10Area - Acres
TOTAL FILL VOLUME.YDS.1606.81
TOTAL FILL AREA-ACRES 0.80
TOTAL FILL AREA 34865.00
Cobble Harvest Area Pre-Construction Photo Documentation
*-^1Stom Water Mæagmqt PlmMWtur6u'¡fl.fuMnd@$m.&GffiO:#C) Aræs of tu & Fi!: No rut/fill ¡spfopôsed, only rock hâûe*¡ng from sudàæE) No Ded¡ceted 6ncde or ÆFhâlt Bâtch PlãnBwlll be u*dFl NoStru&Êl BMP!âre propdedG) iloFstruduÉl BMp's: Sìlt Fefte and/orstrawwatle, Re-vegetative sæd¡n8.ând üñd i¡ducÞd êrósiôn.ElDlùtune eund.ryi 4.O aøes total. Contrador shall bkelnstâll silt fence or stÊwwafrle downstream ofalld¡*urbed areas.D) StagingAreas: any materialsequipmenl soil, portable restræmswade stoÞge needed. Bu¡ldofthis arca forColoÊdo RtuerH) @tion ot Sprins, Streams, Wdlendtând olhêr suÉåce mteß: Existing irrigatioñditriÉs åre tributeryto Måin Elkcreek, Elkenhance locat¡on.0.25-m¡lesto Main Elk creekdoss¡ng. I O.50-n¡les toCounty Road 243.IBMP/ EROSTON CONTROL LEGEND@TMÇKNC^ qreæt pad, @¡ed at tM patnê o! ùenratat úgreæ .nd e9t6 ú 4Ættudìoñ sþe, to ed!æ the ñld :mß@ñà Ò tò Mds a d øued aæß.k 3'sdM rù, 12" th& Pd ¿ñÆtñ ôJ 1 2 Xû'bE|+i#ORÆC SCS N EETSILTFENCð^ tnpmrv ætuat btuûßtuded Õf FßtE jttJatu and, ù æme @6,a ùtu suppÒi lene, ptùæd M d nettb be o! a s@e û n 4 ñt@tuinawas to i^tæpt and daain .edina. dnd dæase lM ætdiæ fuAaìndF a@ .J lùt@ s@; oppnabþ u'hæ shú ûd dl ù snallù@ttud @ nq be a pñ& 9k&.t @þùd 4aI üe a@bbbEUg@NRqRdudq edæ dnd aù mMd oltusl ùfu hnd tutuùanæ, Mdl@ ùúttudù ddütèñ a@s e*Á tó ù¡st Þþbhs ñ dd tôpÈæ,t sd? l6sand.tuæ thè @ãæ ÒÍ@tût¿lU hañfl atuê sú6biæ l^&tu thèúg ojsd a@ pil6 dnd ffittudù tuùÈoooú4r d6útd o e ¿dh dd ò[.uo*ffid,rq'q bdoilydffisbftDRAFT 4/24/!8
MAIN ELK CREEK - TYPICAL POOL EXCAVATION SITE
LEFT
DESCENDING
BANK soD/sorL LAYER
EXISTING X-SECTION RIGHT
DESCENDING
BANK
STABLE BANK
A A
7'
5 f
0 5'L0'5 3
Note: The existing streambed cons¡sts of gravel/cobble depos¡ted over valley fill and intermittent sand/clay layers. The valley fill substrate consits of
alternating lensei of sand, gravel and 0.5 to 2' sub-angular limestone and sandstone fragments in a fine-grained clay/sìlt matrix.
LEFT
DESCENDING
BANK
soD/5orL LAYER
PROPOSED X-SECTION RIGHT
DESCENDINC
BANK
A'
STABLE BANK
A
7',7'
5'5
o 5 10'0'3
Note: The ex¡5tin9 gravel and cobble at each pool sitc would bc uscd to covcr thc streambcd once the excavat¡on was complete.
^ll
excess
gravel/cobble would be hauled to an upland fìll site or used to construct lateral bars where designated in the design plans.
sotr-Rool zoNE
VALLEY FILL SUBSTRATE
LEFT
DESCENDING
BANK
MAIN ELK CREEK - TYPICAL BANK SLOPING SITE
EXISTING X-SECTION RICHT
DESCENDING
BANK
soD/sorL LAYER
10'10'
ING BANK
SOD/SOIL LAYER
5'5
o 5'lo'15'20'25'30'35'40'45
PROPOSED X-SECTION
LEFT
ESCENDING
BANK
SLOPE VERTICAL BANK TO AN
APPROXIMATE 2:1 SLOPE AND
COVER WITH TOPsOIL. SEED WITH
RIPARIAN GRASS SPECIES.
RIGHT
DESCENDING
BANK
soD/sorL LAYER
10'10'
PLANT WILLOWS IN AND
ABOVE COBELE TOE,
PLACE 6 TO 12' COBBLE
AT TÕE ÕF BANK.
soD/5orL LAYER
5 5
0 5 10'15'20'2'',30'35'40'4s',
Fiqure 2
@t
COLORADO
Department of Public
Health I Environment
Dedícated to protecting å nd improvrng the health and envíronment of the people of Colorada
ASSIGNED PERMIT NUMBER
Date Received / /
¡!/i lf,'l lìil iì::/:ii,'
Revised: 10-201
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRU CTI ON ACTIVITI ES APP LICATION
coLoRADO DTSCHARGE PERMIT SYSTEM (CDPS)
PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED.
For Applications submitted on paper - Please print or type, Original signatures are required.
At[ itemsmustbecomptetedaccuratelyandintheirentiretyfortheapplicationtobedeemedcomptete. lncompteteappticationswitl notbeprocessed
untilatl informationisreceivedwhichwitl.uttimatetydelaytheissuanceofapermit. lfmorespaceisrequiredtoansweranyquestion,pleaseattach
additional sheetstotheappticationform. Applicationsorsignaturepagesfortheappticationmaybesubmittedbymail orhanddeliveredto:
Colorado Department of Public Health and Environment, 4300 Cherry Creek Drive South, WQCD-P-B2, Denver, CO 80246-l 530
For Applications submitted electronically
Ptease note that you can ONLY complete the fecdback form by downloading it to a PC or Mac/Appte computer and opening the Application with Âdobe
Reader or a similar PDF reader. The form witt NOT work with web browsers, Google preview, Mac preview software or on mobile devices using iOS or
Android operating systems.
lf apptication is submitted electronically, processing of the apptication wi[[ begin at that time and not be detayed for receipt of the signed document.
Any additional information that you woutd like the Division to consider in developing the permit should be provided with the application. Examptes
include effluent data and/or modeting and planned pottutant removal strategies.
Beginning July I , 2016, invoices will be based on acres disturbed.
DO NOT PAY THE FEES NOW - lnvoices will be sent after the receipt of the application
Disturbed Acreage for this apptication (see page 4)
Less than 1 acre (S83 initiat fee, $165 annual fee)
1-30 acres (5175 initiat fee, 5350 annual fee)
Greater than 30 acres (5270 initial fee, 5540 annuat fee)
PERMIT INFORMATION
Reason for Application:
Appl¡cant is:
NEW CERT
Property Owner
RENEW CERT EXISTING CERT#
contractor/operator
A. CONTACT INFORMATION - *indicates required
* PERMITTED ORGANIZATION FORMAL NAME: F|VE R|VCTS, INC
1) * PERMIT OPERATOR - the party that has operational control over day to day act¡v¡ties - may be the same as owner
Responsible Person (Title):Project Manager
Matt LastName: weavgrCurrently Held By (Person): FirstName:
(406) 209-1970 Ema¡rAddress: mattweaver406@gmail.com
Five Rivers, lnc
Telephone:
Orga nization:
Mailing Address
City:
32 Discovery Drive
Bozeman state, MT Zip Code 59718
Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly
authorized representative ofthat person. A person is a duly authorized representative only if:
(¡) The authorization is made in writing by the permittee
(ii) Theauthorizationspecifiese¡theranindividualorapositionhavingresponsibilityfortheoverall operationoftheregulatedfacilityor
activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or
an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative
may thus be either a named individual or any individual occupying a named position); and
(iii) The written authorization is submitted to the Division
swconstructionAppr,.,,,onro, Five RiVefS, lnC 041301201I page 1 of 5
2l OWNER - party has ownership or long term lease of property - may be the same as the operator,
Same as 1) Permit Operator
Responsible Person (Title):Owner, Corporate Officer
Mark LastName: Magidsoncurrently Held By (Person): FirstName
310-842-8516 EmairAddress: markm@moldex.com
Meadow Creek, LLC
Telephone:
Organ¡zation:
Mailing Address:
City:
lÙlll Jefferson Blvd
Culver City state: CA Zip Code:90232
Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly
authorized representative ofthat person. A person is a duly authorized representative only if:
i. The authorization is made in writing by the permittee.
ii. The authorization specifies either an individual or a position having responsibil¡ty for the overall operation of the regulated facility or
activity such as the pos¡tion of plant manager¿ operator of a well or a well field, superintendent, position of equivalent responsibility, or an
individual or position having overall responsibility for environmental matters for the company. (A duly authorized representat¡ve may thus
be either a named individual or any individual occupying a named position); and
iii. The written authorization is submitted to the Division.
3) *SITE CONTACT local contact for questions relating to the facility & discharge authorized by this permit for the facility
! t.r" as 1) Permit operator
Responsible Person (Title)Project Manager
Current.ly Held By (PÈrson): F¡rstNar'ìle:Wendy
Telephone:97 Q-625-4933 xt 1 1 6 Enrait Address: wendy@ co lo radoriveren g. com
Colorado River Engineering, lnc
,".r*rr"' RYan
Organization:
Mailing Address:136 East 3rd Street
Rifle State:Co z¡p code:81650C¡ty:
4) xBILLING CONTACT if different than the permittee.
I I Same as 1) Permit Operator
Respons¡ble Person (Title):Owner, Corporate Officer
Mark LastName: MagidsonCurrently Held By (Person): FlrstName
Telephone:310-842-8516 EmairAddress: markm@moldex.com
Meadow Creek, LLCOrga nization
10111Jefferson BlvdMailing Address:
City:Culver City
5) OTHER CONTACT TYPES (check below) Add pages if necessary:
State:CA zip corie 90232
Responsible Person (Title):Project Manager (USACE GP 12)
Currently Held By (Person):r¡rstllar"' Mikê LastName: Claffey
970-640-3783 EmairAddress: mclaffey@acsol.net
Claffey Ecological Consulting, lnc
Telephone:
Organizat¡on:
Mail¡ng Address:
City:
1371 17 Road
Fruita co zip code 81521State:
Environmental Contact Consultant
Compliance Contact
Stormwater M54 Responsible Person
Stormwater Authorized Representativefl lnspection Facility contact
5W Construction Application for:Five Rivers, lnc 04/3012018 page 2 of 5
B) PERMITTED PROJECT/FACILITY INFORMATION
Meadow Creek, LLCProject/Facility Name
street Address or cross streets 1862 CR 243
(e.g., Park St and 5 Ave; CR 21 and Hwy 10;44 A,ve and Ctear Creek) ; A street name without an address, intersection, mite marker, or other
identifying information describing the location of the project is !o! adequate. For linear projects, the route of the project should be described as
best as possibte using the starting point for the address and latitude and longitude - more clearly defined in the required map )
City:New Castle County:Garfield zip Code 81647
Fac¡l¡tyLat¡tude/Longitude -Listthelatitudeandlongitudeof theexcavation(s)resultinginthedischarge(s). lftheexactsoil disturbinglocation(s)
are not known, list the latitude and longitude of the center point of the construction project. lf using the center point, be sure to specify that it is
the center point ofconstruction activity. The preferred method is GPS and Decimal Degrees.
t-at¡tuoe 39 . 62789 Lonsitude -107 57201 (e.g.,3e.70312', 104.93348')
Dec¡mal Degrees (to 5 decimal places) Decimal Degrees (to 5 decimâl places)
This information may be obtained from a variety of sources, including:
. Surveyors or engineers for the project should have, or be able to calculate, this information.
. U.S. Geological Survey topographical map(s), available at area map stores.
¡ Using a Global Positioning System (GPS) un¡t to obtain a direct reading.
¡ Google - enter address in search engine, select the map, right click on location, and select "what's here"
Note: the latitude/ongitude required above is notthe directionol degrees, m¡nutes, ond seconds provided on a site legal descr¡ption to deÍine
property boundaries.
C) MAP (Attachment) lf no map is submitted, the applicat¡on cannot be submitted.
Map: Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will be disturbed. A vicinity map is not
adequate for this purpose.
D) tEGAt DESCRIPTION - only for Subdivisions
Legal description: lf subdivided. provide the legal description below, or indicate that it is not applicable (do not supply Township/Range/Section
or metes and bounds description of site)
Subdivision(s)Lot(s):Block(s)
OR Not applicable (site has not been subdivided)
E) AREA OF CONSTRUCTION S|TE - SEE PAGE 1- WltL DETERMINE FEE
Provide both the total area of the construction s¡te, and the area that w¡ll undergo disturbance, in acres
Total area of project disturbance site (acres):+l- 4
Note: aside from clearing, grading and excavation activities, disturbed areas also include areas receiving overburden (e.g., stockpiles), demolition areas, and areas
with heaW equipment/vehicle traffic and storage that disturb existing vegetative c0vêr.
! errtofLargerCommonPlanofDevelopmentorSale,(i.e.,total,includingallphases,filings,lots,andinfrastructurenotcoveredbythisapplication)
F) NATURE OF CONSTRUCTTON ACTIVITY
Check the appropriate box(es) or provide a brief description that indicates the general nature of the construction activities. (The full description of activities must be
included in the Stormwater Management Plan.)
commercial Development
Residential Development
Highway and Transportation Development
Pipeline and Utilities (lncluding natural gas, electricity, water, and communicat¡ons)
O¡l and Gas Exploration and Well Pad Development
Non-structural and other development (i.e. parks, trails, stream realignment, bank stabilization, demolition, etc.)
T
T
trf
T
ø
swconstructionAppr,"u.,onro. FiVe Rivers, lnC 0413012018 page 3 of 5
G) ANT|C¡PATED CONSTRUCTION SCHEDUTE
Construction Start Date:June 15, 2018 Final Stabilizãtion Date:August,2018
Constuction Start Ðate - This is the day you expect to begin. ground disturbing activities, including grubbinS, stockpiling, excavating, demolition,
and grading activities.
Finat Stabitizotion Dote - in terms of permit coverage, this is when the site is finally stabilized. This means that all ground surface disturbing
activities at the s¡te have been completed, and all disturbed areas have been either built on, paved, or a uniform vegetative cover has been
established with an individual plant density of at least 70 percent of pre-disturbance levels. Perm¡t coverage must be maintained unt¡l the s¡te is
finally stabilized. Even if you are only do¡ng one part of the project, the estimated final stabilizat¡on date must be for the overall project.
lf permit coverage is still required once your part is completed, the permit certificat¡on may be transferred or reassigned to a new responsible
entity(s).
H) RECEIVING WATERS (lf discharge ¡s to a d¡tch or storm sewer, include the name of the ult¡mete receiving waters)
lmmediate Receiving Water(s):Lower Pasture Alt Ditch
Ultimate Rece¡ving Water(s):Main Elk Creek
ldentify the receiving water of the stormwater from your site. Receiving waters are any waters of the State of Colorado. This ¡ncludes all water courses, even if they
are usually dry. lf stormwater from the construction site enters a ditch or storm sewer system, identify that system and indicate the ultimate receiving water for the
ditch or storm sewer. Note: a stormwater dìscharge permit does not allow a discharge into a ditch or storm sewer system without the approval ofthe owner/
operator of that system.
SW Construction Application for:Five Rivers ,lnc 0413012018 pãge 4 of 5
2.
r) STGNATURE PAGE
1, you may print and sign this document and mail the hard copyto the State along with required documents (address on page one)
Electronic Subm¡ssion Signature
you may choose to submit your application electronically, along with requ¡red attachments. To do so, click the SUBMIT button below whlch will direct you, vla
e-mail ,tosignthedocumentelectronicallyusingtheDocusignElectronicsignatureprocess. Oncecomplete,youwill receiveviae-mail,anelectronically
stamped Adobe pdf of this application. Print the s¡gnature page from the electronically stamped pdf, sign it and mail it to the WQCD Permits Section to complete
the appl¡cation process (address is on page one of the application).
. The Division encourages use of the electronic submission of the appllcãtlon and electronlc slgnature. Thls method meets si8nature requ¡rements as
required by the State of Colorado.
. The ink signed copy of the electronically stamped pdf signature page is also required to meet Federal EPA Requirements.
. Processing of the applicat¡on will begin with the receipt of the valid electronic s¡gnature.
STORMWATER MANAGEMENT PLAN CERTIFICATION
By checking this box "l certify under penalty of law that a complete Stormwater Management Plan, as described in the stormwater management plan guidance,
has been pre-pared for my activity. Based on my ¡nquiry ofthe person or persons who manage the system, orthose persons directly responsible for gathering
the information, the Stormwater Management Plan ¡s, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for falsely certifying the completion of said SWMP, including the possibility of fine and imprisonment for knowing vioìations."
"l certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance w¡th a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry ofthe person or persons who manage the system, or
those persons directly responsibìe for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and complete.
I am aware that there are significant penalties for submitting false informat¡on, including the possibility of fine and imprisonment for knowing violations."
"t understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater Discharges Associated with Construction
Activity for the entirety of the construction site/project described and applied for, until such time as the application is amended or the cert¡fication is
transferred, inact¡vated, or expired." IReg 61.4(1}(h)]
For Docusign
Electronic Signature Ink S¡gnature
Signature of Legally Responsible Person or Authorized Agent (submission must include original signature)
Matt Weaver Project Manager
Date: 0413012018
Name (printed)Title
Signature: Theapplicantmustbeeithertheownerand operatoroftheconstruct¡onslte.RefertoPartBoftheinstructionsforadditionalinformation.
TheapplicationEuSLþCJig¡Êdbytheappl¡canttobeconsideredcomplete. lnall cases,itshall besignedasfollows:
(Regulation 61.4 (1ei)
a) ln the case of corporations, by the responsible corporate officer is responsible for the overall operat¡on of the facility from which the discharge described in
the form or¡g¡nates
b) ln the case of a partnership, by a general partner.
c) ln the case of a sole proprietorship, by the proprietor.
d) tnthecaseof amunicipal,state,orotherpublicfacility,byeitheraprincipal executiveofficer,rankingelectedofficial, (aprincipalexecutiveofficerhas
responsibility for the overall operation of the facility from which the discharge originates).
3rd party preparer: lf this form was prepared by an authorized agent on behalf of the Permittee, please complete the field below.
Wendy Ryan wendy@coloradorivereng.com
Prcparcr Namc (printed)
Mi\cREjobfiles\1 156-Meâdow Creek Ranch-Floodplain Reslorâlion\cRE-PDFS Temp\sw[¡P Drafl 4'24-18-Pdf
EmailAddress
DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PIAN
DO NOT INCLUDE PAYMENT_AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED.
Attach Map
Ättach File
Attach File
Attach File
Attach File
sw construct¡on Appr,.",,on ¡o, FiVe Rivers, lnc 041301201 B page 5 of 5