Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-04-18-5193 and SEPT -04-18-5194 Deanna Spracher New SF Residence & Garage TBD Stover Valley Road High Aspen Ranch Exemption — Lot C 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH BUILDING ENVELOPE AND/OR SETBACK REQUIREMENTS INCLUDING ROOF PROJECTIONS. 4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 200 PSF. 5) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25 -FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE, AND AS FOLLOWS: • AVG. NATURAL GRADE = 7,542.5' (actual elevation above sea level) ■ MAX. BUILDING HEIGHT = 7,567.5' (actual elevation above sea level) 6) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.