Loading...
HomeMy WebLinkAboutEngineers Design Report 05.17.2018DESIGN REPORT ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) 11084 CR 311 SILT, COLORADO GARFIELD COUNTY May 17, 2018 Prepared By: Kenneth J. Brotsky, P.E. 558 Rio Oso Lane Grand Junction, CO 81507 (970)216 8861 k bro+s kiNO I. INTRODUCTION: This Report has been prepared at the request of Pete Grover, representative for the above referenced property. This Report addresses the design of an On -Site Wastewater Treatment System to serve a proposed residence. Public sewer service is not available. The procedures used in this report follow the "Garfield County On -Site Wastewater Treatment System Regulations". II. SOILS AND PERCOLATION TEST: A test hole was dug in the area of the proposed absorption field and observed by the Engineer on May 15, 2018. The soils are ancient alluvial material. The upper 12" of soil is black, loamy, clay, mountain topsoil. From 12" to 38" the material is a biege, silty clay. At 38" to 96" the soil is a light tan, silty, sandy clay with some caliche. The ground surface where the OWTS absorption bed will be built slopes at about 5 to 6% to the northwest. Percolation rate averaged from 8 to 15 minutes per inch. The soil type is somewhere between type 1 and 2, so for design purposes, a Long Term Acceptance Rate of 0.7 gallons per square foot per day will be used. It is desirable to put the bottom of the absorption bed in the material which is 38" below the existing grade. III. SYSTEM DESIGN: A. Estimated Sewage Flow: The proposed house will be 3 bedroom, however the hoomeowner wishes to design and construct a system for 4 bedrooms. 4 x 150 = 600 gallons per day ...;25 B. Septic Tank Use a 1,250 gallon tank C. Absorption Bed: follows: The absorption bed size is calculated as 525 / A= 6<0'b/.70 6 Z 5/ 7 Z 750 857 sq. ft. Adjustment Factors: Table 5.2 Method of Application is Gravity Trench Factor 1.0 Table 5.3 Type of Distribution is Ch Factor 0.70 szs Bed Size required is 750 x 1.0 x 0.70 = 6 Sq. Ft. Total Number of chambers required is 600/12 = 50 units Use trench configuration, with 2 trenches and 25 chambers per trench for a total of 50 chambers. KENNETH J. BROTSKY, No. 18843 PERCOLATION TEST DATA TABLE ADDRESS: //6891'- e21/ DATE 5-///6//8 HOLE # DEPTH iz o s TIME i .' 3 � 3 G Mi u ("so DROP RATE /1/ArrTpI AVE. CO 4'o -5'/h 2 53/4, 33// 8 /z-3/; s, c ry C'cA y . 38-9e." 4iGilr 74N SIc7 y e,..4, It)/ 54...w 0L/-(6-• 7QLLue.m4G o�.0 D/G S /�,vG/E� r C ez-34 z y z /s a 34 Y7 /'// y yy 3 ' SOIL PROFILE D E P T H l ` v-iz" 84.AA /s1irV, r p » iz zy"- 3e.- - f_ &ei- 7z"_ 80/'- 9L * /oS _ /z-3/; s, c ry C'cA y . 38-9e." 4iGilr 74N SIc7 y e,..4, It)/ 54...w 0L/-(6-• 7QLLue.m4G o�.0 D/G S /�,vG/E� r RATE SLOWER THAN 60 MPI A/ RATE FASTER THAN 5 MPI A/ SLOPE GREATER THAN 30% A/ HSWT DEEPER THAN 4 FT. 5 BEDROCK LESS THAN 4 Ff. n/ FLOODPLAIN ON-SITE WATER= ‘- REPAIR AREA GWT IISWT COMMENTS: TESTED BY: '� /i+ : 'c • _' SIGNATURE HOLE LOCATION DIAGRAM r),,EQPO f..r frite SEE MANIFOLD DETAIL, r�.- CLEANOIIT oso f/B61'GL4.55 UO FZe41 VA! F65T A' To d'i�E7L 1` .\\-- ` __.. 24t'O,. HDPE L'CriLr,e AM/ /5/T GR.401:= ••1 44 1/../ALL�: 7-AA//C , i5En Dcf'r4/G sca_Ew L'AF miz/LL `1 3/g" NoLE5 f4JI.SN. 6.4646' /'vC P/PE _ref rr�rL r�A;or 807719' OF hoc/LT/2470A DIVLL 2 - qz" /-/z)LG5 34'dp F4o/r1 BOTTOM 1..7E-11rV/AliPEC r;1. ! Pot r roc- rim NOTE: 1250 GALLON SEPTIC TANK SEE NOTE 4 SET TEE AND MANIFOLD • PIPE LEVEL ' ELBOW DOWN TO LOWER INFILTRATOR QUICK-41NFIL" TRENCHES, 2' TRENCH = 50 T NORTH SCALE: 1" = 20' 'INFILTRATORS_ 4"PVC PIPE e FROM TANK 4"R4"X4"TEE 4"x B$ND= MANIFOLD DETAIL