Loading...
HomeMy WebLinkAboutExcavation Observation Letter 04.03.218ffi CTL ITHOMPSON @ April 3, 2018 lntegrated Elements Construction 2621 Fairview Heights Court Rifle, CO 8'1650 Attention: Travis Stanley Subject:Excavation Observation McDaniel Residence Addition 1000 County Road 323 Garfield County, Colorado Project No. GS06206.001 -305 As requested, we visited the subject site on April 2, 2018. The purpose of our síte visit was to observe the soils exposed at footing elevation for the addi- tion. A copy of our excavatíon/footing observation report is attached. CTL I Thompson, lnc. performed a soils and foundation investigation for the subject site (Project No. GS06206.000-120; report dated February 26,2018). Pursuant to our recommendation during our previous site visit, the contractor subexcavated the clay soils to expose the underlying sand and gravel soil in all parts of the foundation excavation. Footing elevations in the subexcavated areas should be re-attained with densely-compacted, granular structural fill pursuant to recommendations in our soils and foundation investigation report. We appreciate the opportunity to work with you on this project. lf you have questions or we can be of further service, please call. Very truly yours, cTL ITHOMPSON, tNC '^-,).Uru (.e-t- D.. Kellogg, P.E. Division Manager JDK:at 234 Center Drive I Glenwood Springs, Colorado 81601 Telephone: 970-945-2809 Fax: 970-945-741 1 Excavation/Footing lnspection CTLITHOMPSON CLIENT ADDR LOT FILING NO,JOB Heconrmonded Founrlatlon CTL/THOM JOB FOOTINGS MAXIMUM SOIL PRESSUHE PSF. MINIMUM WIDTH INCHES tr FOOTINGS WITH MINIMUM DEADLOAD MAXIMUM SOIL PFESSUBE OF - PSF, MINIMUM OEADLOAD PRESSURE OF PSF, PROVIDE A INCH VOID BENEATH GRADE BEAMS INCHESMINIMUM WIDTH I onnoe BEAMS AND PADs MAXIMUM SOIL PRESSURE OF MINIMUM DEADLOAD PRESSURE OF PSF. PBOVIDE A INCH VOID BENEATH GRADE BEAMS INCHESMINIMUM WIDTH Foundation Plan BY PLAN NO.DATE WALL FOOTING WIDTH _- (INCHES) DEPTH -- (INCHES) COLUMN PAD -- (INCHES) DEPTI I ---- (INCHE8) coLUMN pAD (tNcHËs) DÊ.PTH _--- (lNcHÊs) REINFORCEMENT AS PEB PLAN: fJ vss n ruo ! ruorue REoUIRED ! nrsre I rrusrnlleo Soll Condltlons At Footlng Level UPPER LEVEL LOWEB LEVEL Ground Waler Conrlltlons 3',5 INÐICATES APPROXIMATE DEPTH/VVIDTH MEASUREMENT LOCATION lnstructions to Contractor ffrx oerurnnl coNFoBMANcE wtrH PLAN n Re¡ecreo RECOMMENDED CORRECTIVE PFOCEDURE FIELD REVIEWED For¡nclation Layout ¿l s 3' PSF.ãrt I :r l I I ) I j- E+\sÍrES 1'l IN EXCAVATION ENCOUNTERED IN BORING NO.JP:L'o g' ,r* l-l erucourutERro et FEET tN BoRtNG No, e Remarks: DATE OF