Loading...
HomeMy WebLinkAboutLand Use Change Permit1111 WA/MIIIV I[<t Iffi1Iinf lIfrl' Ir,00010. 11l III Reeeptiank}: 677125 05I12+z0i6 02 17-24 PM Jinn Alhcrloo 1 of 5 Rec Fee 50-00 Ono Fee 0 00 GARFIELD COUNTY CO RECEIVED GARFIELD COUNTY COMMUNITY DEVELOPMENT LAND USE CHANGE PERMIT for A 35 -acre parcel of land located at 0269 CR 309, adjacent to the Battlement Mesa PUD in the SE % SE 14 Section 5, Township 7 South, Range 95 West of the 6r" P.M. and legally described in Exhibit A Assessor's Parcel No. 2407-054-00-085 In accordance with and pursuant to provisions of the Garfield County Land Use and Development Code, as amended, and the Garfield County Director's decision the following activity is hereby authorized by Land Use Change Permit: A Small Injection Well Facility known as the Ursa Tompkins Injection Well as shown on the Site Plan Attached as Exhibit B (GAPA-02-16-8418) This Land Use Change Permit is issued subject to the conditions contained in the Director's decision issued on April 29, 2016, attached as Exhibit C, and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: ACTING DIRECTOR OF THE COMMUNITY DEVELOPMENT DEPARTMENT J 5‘1 a slip Tamra Allen, AICP at 1 ■III ! 4 {Il++rl,G 11,Nl'f'':,'a'Ir:*'!,l1f h MLLIhi WO, 11 NI Receptionq: B77125 05/12/2015 02:11 24 PM Jean Riberlco 2 or _, RPC Fee $0 00 Doc Fee 0,00 GARFIELD COUNTY CO Exhibit A (Legal Description) The SE 1Y4 of the SE 14 of Section 5, Township 7 South, Range 95 West of the 6th P.M. excepting therefrom a tract of land described as follows: Beginning at the Northeast comer of the SE 1 of the SE 1/4 of said Section 5; thence West 40 rods; thence South 20 rods; then East 40 rods; thence North 20 rods to the Point of the Beginning and as also shown in Boundary Agreement recorded April 18, 1967 in Book 383 at Page 485 as Reception No. 237679. 2 Exhibit B (Project Site Plan) Waft Ames; Premed leargesesel conleeniseiT+1nkA a ftft ft.� 127 1• fts w o SO' GnornIC Ugh In I et1 1•.f6• 17 -000 000ko?I�"Ias 11an :fie) oQ 0000 w.�s. i nr..rry Ldre of Pad Cf 481. MA Rom Tasapklns Ped AAA Ass reeteledUpeeoler NatetnorAArra L 1Sf7 tater *Indio were Tiede' ell hlela.ea Man serf r.,r.�n c. tarW Hl 15' Aln JJ 7$. Leh n•pwd F aloib d. .0 Colts sera se Common; ne►rrrawro.elr.n 14...w II Mired MIRIkx1 AMvn r1I:1 111014: AN Ye.nfr.:;T .yet 01rea.1''07 rw rwnwut 1(Jf tee a ' r."" mem moan., r.r Ma 11 at 14 RES*. 11t 14 a.. a..r 1--.r ML: YI k Form 2A - Attachrnent J Tompkins Pad Facillty layout Drawing fate.n7. Twvehy T forth. Urn 101WoR efi LiYo I Aid 1111 111 Reeepti°nil: 877125 05/12/2016 02 1; 24 PM Jean Alberico 7 or 5 Rec Fee $11 0L Doc Fee 0,00 GARF I EL0 C0,111TY CO 3 Exhibit C (page 1 of 2) 1. That all representations made by the Applicant in the application shall be conditions of approval unless specifically altered by the conditions of approval of the Board. 2. That the Tompkins Injection Well shall be operated in accordance with all applicable Federal, State and local regulations governing the operation of this type of facility. 3. The Applicant shall maintain all required CDPHE permits for the facility including any applicable air quality APEN permits including as may be required for the storage tank batteries. 4. The facility shall maintain compliance with CDPHE Storm Water Management Permits, Drainage and Grading Plans, and Reclamation and Erosion Control Plans for the site. 5. The Applicant shall remain in compliance with the Watershed Permit issued by the Town of Parachute. 6. The Applicant shall maintain all required COGCC permits and forms for the facility and shall comply with all conditions or requirements of said permits and forms. Copies of COGCC permits and forms shall be provided to the County once issued. 7. The facility shall maintain compliance with COGCC Noise Standards/Regulations and the facility shall be required to utilize an electric pump as represented. If future compliance issues are identified, the Applicant shall provide noise mitigation in order to achieve compliance along with a technical evaluation by a qualified professional to confirm compliance. Should transfer pumps for distribution of water between well pads be constructed on the site as part of the injection well operation, said pump shall be tested for noise compliance with noise mitigation installed if necessary to include the potential for housing in a sound mitigation structure. 8. The facility shall have only termporary lighting for unscheduled night time maintenance. All lighting shall comply with Section 7-304, Lighting Standards, with all lighting to be directed inward and doward toward the interior of the site. Facilities and storage tanks shall be painted a non -glare neutral color to lessen any visual impacts. 9. The Applicant shall comply with the Battlement Mesa Wildlife Mitigation Plan - Agreements between Ursa Operating Company and CPW which includes limitations on trucking to between the hours of 10 a.m. and 3 p.m., when and where possible, KU!:Kt%N AIK1;IN ri1111 Reception#: 877125 7' 12/x016 02:17 24 PM Jean A14erico 4 '1 6 Rac Faa $0 CO Doc Fee:0,00 GARFIELD COUNTY CO 4 compliance with noise regulations and use of bear proof trash containers for all food related trash. 10. The Applicant shall comply with the recommendations of Geologic and Soils Hazards Report related to the Potts-Ildefonso Soils present on the site. These recommendations include the use of coated steel or appropriate cathodic protection, as well as the use of corrosion resistant concrete. 11. The Applicant shall comply with the access representations and Traffic Report including use of designated haul routes and maximum estimated traffic generation. The daily trucking estimates may be applied based on a weekly average to account for minor operational variations. Trucking of water to the site shall utilize watertight tanks and shall comply with all COGCC or CDOT requirements for hauling of production water. The Applicant shall provide the County with updates on the progress toward implementing pipelines for transportation of water to the injection well. Said updates shall be provided on an annual basis and include assessment of, and mitigation for, any unanticipated traffic impacts. 4111 Ped1r3.1114 NniNiti'+ iirr erillIT rVrAil0, 11111 RecepUcn$* : 877125 Or.:(P /2016 02 17 24 PM Joan Plberico « nl 5 Rec Fee $4 00 poo Fee,0 00 GARFIELD COUNTY CO 5