Loading...
HomeMy WebLinkAboutCorrespondence from Architect 10.06.2017Jim Wilson From: Jeff Johnson <jeff@jjarchitectural.com> Sent: Friday, October 06, 2017 8.56 AM To: Jim Wilson Cc: 247@skybeam.com Subject: Chaplin Addition- Southern stair pads Jim, Good Morning, Per our conversation yesterday and in talking with the Contractor, Roger, it was determined that the southern footer pads for the addition stairway were placed too shallow. The request has been made to the concrete subcontractor to lower the elevation of these pads by 30" to 36". This will assist in getting these pads below any recent fill down to a native soil depth, as well as assure proper frost depth once finish grade is established. Tony Herra will make these modifications prior to pouring on Monday. Thank you for assisting us in this manner. Jeff mos J/s C`• Jeffrey Scott Johnson Jeff Johnson Architectural, PC 136 East Third Street Rifle, CO 81650 970-625-0580 work 970-366-1467 cell 1