Loading...
HomeMy WebLinkAboutCorrespondenceAndy Schwaller To: Subject: javier orozco RE: Building Permit Native Springs Yes. Just verify the grading with your engineer prior to doing any digging From: javier orozco Imailto:javierorozco-com @hotmail.com] Sent: Friday, September 28,2O181-1:06 AM To: Andy Schwa I ler <aschwa ller@ga rfield-county.com> Subject: Re: Building Permit Native Springs Ok I ll get that as soon as possible so can I still get the digging permit? Get Outlook for iOS From: Andy Schwaller <aschwaller@garfield-county.com> Sent: Friday, September 28,201811:03 AM To: iavierorozco co lôhotmail.com Cc: Dave Argo Subject: Building Permit Native Springs As per the plat notes for that subdivision, lot L1- requires a grading and drainage plan done by an engineer as part of the building permit and design. Thanks, Andy