Loading...
HomeMy WebLinkAbout01.1 Application Form• Gai f eld County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.�arfield-county.com TYPE OF SUBDIVISIONS ❑ Sketch Plan ❑ Preliminary Plan ❑ Preliminary Plan Amendment Final Plan/Final Plat ❑ Final Plat Amendment 1 DIVISIONS OF LAND APPLICATION FORM ❑ Conservation Subdivision Yield Plan 0 Common Interest Ownership Community _INVOLVED PARTIES Owner/Aplicant Name: l � 't f /a_ /i E3J Mailing Address: 73 78 (' , /Z /00 TYPE OF EXEMPTIONS ❑ Minor Exemption ❑ Major Exemption O County Road/Public ROW Exemption ❑ Rural Land Development Exemption ❑ Final Plat Amendment ❑ Time Extension Phone: (5 ) 963 9k • City: C'/ / 'o-uo/t E-mail: tiegL:s L/Llf IRepresentative Authorize ion Required) 5- Name: 1 .D N/SCOt /9%6, (1,4tr!,/(Ls-W-. Mailing Address: ( S J'1 (ii Ai, ( AK r\.., c State: CO Zip Code: 31473 Phone: ( 970 ) 5-86.7( City: Irenr7i State: CC.� ZipCode: el e0 E-mail: dele)-,nie),, I,-)cc.n5 PROJECT NAME AND LOCATION Project Name: P/ v r1- i°0/1J T cc ,02 /5; 011 Assessor's Parcel Number: p` j 1 - _27 L -OO -0D Physical/Street Address: 23)g C , w. /00 C'1 JOEL' e 0, S/4 3 Legal Description: Se2WT-7 c, / Zone District: /W-6 j 4.'/L ,2 , /dee, DGJTy Property Size (acres): SFPR- CSI �I • Project Description . p t1 zi_5 G U' 3 7/ j5J - /9.70 S. . i`' / £1$ Existing Use: �, Proposed Use (From Use Table 3-503): Description of Project: �j '/ 4.417702"'4.),L7— Proposed Development Area Land Use Type j # of Lots Single Family Duplex Multi -Family Commercial Industrial Open Space Other Total 3 # of Units Acreage Parking • ST __. azY71Y jil3Ygd)7. REQUEST FOR WAIVERS Submission Requirements 0 The Applicant requesting a Waiver of Submission Requirements per Section 4-202. List: Section: 9205/01% COV7/ ¥-, v3,Section: +4.►41Uct i.10/E-4%) SAY -64M) �- Y0,7. j Section: toemQsoil4 /L4» �f-do�.f Section: Waiver of Standards 0 The Applicant is requesting a Waiver of Standards per Section 4-117. List: Section: Section: Section: Section: I have read the statements above and have provided the required attached information which is correct and accurate to the best of my knowledge. 6A2//3 Signature of Property Ow Date OFFICIAL USE ONLY File Number: _ _ _ - __ _ _ _ _ __ Fee Paid: $ Garfield County FEE SCHEDULE - BASE FEES TYPE OF LAND USE ACTION BASE FEE LAND USE CHANGE PERMITS General Administrative Permit $250 Limited Impact Review / Amendment $400 / $300 Major Impact Review / Amendment $525 / $400 Rezoning: Text Amendment $300 Rezoning: Zone District Amendment $450 Planned Unit Development (PUD) / Amendment $500 / $300 Floodplain Development Permit $400 Pipeline Development Plan / Amendment $400 / $300 Vacating Public Roads & Rights -of -Way $400 Small Temporary Employee Housing $50 Minor Temporary Employee Housing $250 Comprehensive Plan Amendment $450 Variance $250 Interpretation $250 Takings Determination INO FEE 1041: Areas & Activities of State Interest $400 SUBDIVISIONS Sketch Plan $325 $675 + application agency review fees and outside 1 consultant review fees, as authorized pursuant to Preliminary Plan / Conservation Subdivision the Regulations, such as the Colorado Geologic Survey Preliminary Plan Amendment $325 Final Plat $200 Final Plat Amendment / Correction Plat $100 Combined Preliminary Plan and Fin& Plat $1,075 EXEMPTIONS Minor Exemption / Amendment $300 / $300 Major Exemption / Amendment $400 / $300 Rural Land Development Option Exemption / Amendment _J$400 / $300 STAFF HOURLY RATE Planning Director $50.50 Senior Planner $40.50 Planning Technician $33.75 Secretary $30.00 County Surveyor Review Fee (includes review of Amended Determined by Surveyor Plats, Final Plats, Exemption Plats) Mylar Recording Fee $11 — 15page, $10 each additional page • • Garfield County PAYMENT AGREEMENT FORM GAR IELD COUNTY "COUNTY" and Property Owner ("APPLICANT") gU6 6 fi �f/�% Gl�lf�� agree as follows: 1. The Applicant has submitted to the County an application for the following Project: 2. The Applicant understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type application, and the guidelines for the administration of the fee structure. 3. The Applicant and the County agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. The Applicant agrees to make payment of the Base Fee, established for the Project, and to thereafter permit additional costs to be billed to the Applicant. The Applicant agrees to make additional payments upon notification by the County, when they are necessary, as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional County staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, the Applicant shall pay additional billings to the County to reimburse the County for the processing of the Project. The Applicant acknowledges that all billing shall be paid prior to the final consideration by the County of any Land Use Change or Division of Land. 1 hereby agree to pay all fees relatedatto this application: Billing Contact Person: /268.�i9n.) Phone: (72) ) 5 3 YA'CC.) Billing Contact Address: City: 737P C ,2 /oC Billing Contact Email: -s4 C 1:41A- ,74- State: eb, Zip Code: ;Y/( 23 (o) (-,/ 41/L «y� Printed Name of Person Authorized to Sign: g�� LA? /3 (Signature) (Date) • • • Legend Required Application Type 5-302.6 Sketch Plan (Optional) 5-302.0 5-302. D Preliminary Plan Final Plan/ Final Plat v Site Plan (4-203.D.) w 0 N .i3 O U 0l E N c c m c 0 0 W Landscape Plan (4-203.F.) Table 5-401: Submittal Requirements i ri 0 N 0 6 c O 0 0 (0 w 'y p T � C -1 ¢ rn c_ 0 c E v Development Agreement (4-203.J.) Improvements Agreement (4-203.x.) N so11) as hi O cal lEc a CL 2 E CI) Y 1- N rn a Final Plan (5-402.F.) Final Plat (5-402.G.) Common Interest Plat Yield Plan Site Map(s).(5-402.H.) Open Space Plan Water Supply Plan Sewage Management Plan (5-402.M 0 1 N y w Written Narrative/ Additional H 5-303.B 5-303.C. 5-303. D 5-303. E 5-203 Sketch Plan (Optional) Yield Plan Preliminary Plan Final Plan/Final Plat 1 1 Public/County Road Split v 1 Submissions Preliminary engineering reports and tans: A., B., C Final engineering reports and plans A., B., C., D., E., F., G., H. and letters of intent to provide service from all utility service providers. Preliminary engineering reports and plans: A., B., C. Final engineering reports and plans: A., B., C., D., E., F., G., H. and letters of intent to provide service from all utility service providers. Explanation of request. 5-204 Minor/Major Exemption GARFIELD COUNTY UNIFIED LAND USE RESOLUTION OF 2008, AS AMENDED 5-14 • • • Legend Required Application Type V 0 N W ri N 2 0 U W N 0 0 ndsca • e Plan (4-203.F. Table 5-401: Submittal Requirements • ve o • ment • reement (4 - oM hl C'. E rf co'N Q' 4 c ca0 N > 2 'E a ce f 1•-- ketch Plan (5-402.0. Prelimina Plan (5-402.E., inal Plan 5-402.F., ted •an ite a•QO • • en pace P an 5-402.1. ater uppl -la Written Narrative/Additional Submissions 5-205 Rural Land Development) Amendments and Re -Subdivisions Engineering reports and plans: A, B, C, D, E. 5-304 Amended Preliminary Plan Written statement of proposed amendment and any supporting documents. 5-305 Amended Final Plat 5-306 Common Interest Community Re - Subdivision v v Explanation of consistency with underlying preliminary plan and/or PUD plan. A. Streets Trails, Walkways, and Bikeways B. Mitigation of Geo ogical Hazard C. Sewage Collection and Water Supply arid Distribution System D. Soil Suitability Information E. Groundwater Drainage Engineering Studies F. Engineering design and construction features for any bridge, culverts, or other drainage features to be constructed G. Final cost estimates for public improvements H. The certification listing all mortgages, liens, judgments, easement, contracts, and agreements of record regarding the land to be platted and the BOCC may require, at its discretion, that the holders of such mortgages, liens, judgments, easements, contracts, or agreements shall be required to join in and approve the application for Final Plat approval before such Final Plat is accepted for review. All other exceptions from title shall be delineated. GARFIELD COUNTY UNIFIED LAND USE RESOLUTION OF 2008, AS AMENDED 5-15