HomeMy WebLinkAboutEngineer's Installation Observation 08.21.2015ALL SERYICE 6147 Braun Court Arvada, CO 40004 303.908.7823 August 21, 2015 Keith Elhers Three Sail Enterprise Grand Junction, Colorado kehlers threesaiI.net Onsite Wastewater Treatment System (OWTS) Installation Conformation for ADU Leable Residence Garfield County, Colorado Mr. Ehlers, ALL SERVICE septic, LLC reviewed the installation of the onsite wastewater treatment system (OWTS) for the subject 2 bedroom ADU. The installation included a 1000 -gallon, two-compartment NorwecoTM septic tank, followed by 2 rows of 8 ADS chambers each, for a total of 16 chambers and 240 SF of infiltrative area. Observation ports were installed. Effluent is distributed serially within the trenches, via a 4" overflow SDR 35 PVC pipe. Design Calculations: Daily Wastewater Flow = 75 x 2 x 2 Bedrooms = 300 GPD LTAR (Per Garfield County Public Health Regulation = 0.8 GPD/SF (Treatment Level 1) STA Calculations = 300 gallons/day / 0.8 SF/gallon (Soil Type 1, TL1) = 375 SF Gravity trenches with chambers (x 0.5) = 187.5 SF ADS Chambers = 16 total chambers = 240 SF of STA The OWTS was generally installed according to specifications. This observation is not a guarantee of workmanship and/or parts and materials. ALL SERVICE septic, LLC should be notified if changes are made to the OWTS in the future. Any additional OWTS construction must be according to the county regulations. Pump the septic tank yearly. LIMITS: Observations are limited to components that are visible at the time of the inspection. The installer must have documented and demonstrated knowledge of the requirements and regulations of the county in which they are working. The quality of the installation is dependent of the expertise of the installer, soil type, and weather conditions. Please call with questions. Sincerely, ALL SERVICE septic, LLC Reviewed By: Timothy Petz, P.G.