HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-06-18-5320
DOLLAR GENERAL
1) ALL WORK SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 IBC, IMC, IPC, IFGC,
IFC, AND 2009 IECC AND IFC. IN ADDITION, ALL WORK TO COMPLY WITH STATE & FEDERAL
REGULATIONS AND WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
INSPECTIONS POLICY. CIRCLED NUMBERS COORESPOND TO NUMBERS ON PLANS.
3) WORK MUST COMPLY WITH LAND USE PERMIT MISA-05-18-8648 AND LAND USE CODE.
4) BUILDING IS APPROVED AS TYPE II -B CONSTRUCTION, OCCUPANCY GROUP "M" AND S-1
(MERCANTILE AND STORAGE).
5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS, INCLUDING FIRE SPRINKLER
SYSTEM, FIRE EXTINGUISHERS, ALARMS & OTHER PERTINENT REQUIREMENTS. FIRE DISTRICT'S
FINAL APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
6) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR & SIGN -OFF
PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
7) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1008.
8) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12.
9) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11 & ICC A117.1-2009.
10) BUILDING MECHANICAL SYSTEMS INCLUDING COMBUSTION AIR, DUCTWORK & VENTING
REQUIREMENTS TO COMPLY WITH INTERNATIONAL MECHANICAL CODE (IMC) AND IECC,
SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
11) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING ROUGH -IN
INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
12) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
13) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH IECC, SECTION 505.
14) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL
ROUGH -IN INSPECTION.
15) SIGN PERMIT APPLICATION REQUIRED FOR FREE-STANDING SIGN LOCATED ADJACENT TO
BUILDING.
16) SEE 309.2 IBC FOR ALLOWABLE QUANTITIES OF HAZARDOUS MATERIALS GROUP M
OCCUPANCIES.