Envelope Compliance Certificate
Section 1: Project lnformation
Energy Code: 2009 IECG
Project Title: Health & Counseling Center
Project Type: New Construction
Construclion Site:
499 Holden Way
Carbondale, CO 81623
Building Location (for weather data)
Climate Zone:
Vertical Glazing / Wall Area Pct.:
Building Use: Activity Type(s)
1-Healthcare-Clinic : Nonresidential
RECEIVED
sEP 0 5 20ts
GARFIELD COUNTY
COMMUNITY DEVELOPME¡IT
Owner/Agent:
Joe White
Colorado Rocky Mountain School
499 Holden Way
Carbondale, CO 81 623
jwhite@crms.org
Carbondale, Colorado
5b
12/"
Floor Area
197 1
Designer/Contractor:
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES: Design 1 0% better than code
Envelope Assemblies:
Component Name/Description Cont, Proposed
R-Value U-Factor
Budget
U-Factor(a)
Gross
Area or
Perimeter
Cavity
R-Value
East Wall: Wood-Framed, 16" o.c., [Bldg. Use 1 - Healthcare-Clinic]
Window 1: Metal Frame with Thermal Break, Perf. Specs.: Product
lD WINDOW, SHGC 0.45, [Bldg. Use 1 - Healthcare-Clinicl (b)
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product lD GLASS DOOR, SHGC 0.45, [Bldg. Use 1 -
Healthcare-Clinicl (b)
SOUTH WALL: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Healthcare-Clinicl
Window 2: Metal Frame with Thermal Break, Perf. Specs.: Product
lD WINDOW, SHGC 0.45, [Bldg. Use 1 - Healthcare-Clinic] (b)
WEST WALL: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Healthcare-Clinicl
Window 3: Metal Frame with Thermal Break, Perf. Specs.: Product
lD WINDOW, SHGC 0.45, [Bldg. Use 1 - Healthcare-Clinic] (b)
Door 2: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product lD GLASS DOOR, SHGC 0.45, [Bldg. Use
1 - Healthcare-Clinicl (b)
NORTH: Wood-Framed, 16'' o.c., [Bldg. Use 1 - Healthcare-Clinic]
Window 4: Metal Frame with Thermal Break, Perf. Specs.: Product
lD WINDOW, SHGC 0.45, [Bldg. Use 1 - Healthcare-Clinic] (b)
Door 3: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product lD GLASS DOOR, SHGC 0.45, [Bldg. Use
1 - Healthcare-Clinicl (b)
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 -
Healthcare-Clinicl
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Heallhcare-Clinic]
1 080
97
c1
694
69
1196
145
21
21
2183
165
29.2 0.0
29.2 0.0
29.2 0.0
29.2 0.0
0.053
0.290
0.330
0.053
0.290
0.053
0.290
0.330
0.053
0.290
0.064
0.550
0.800
0.064
0.550
0.064
0.550
0.550
0.064
0.550
678
59
30.0 26.0 0.018
0.330 0.550
0.027
(a) Budget UJactors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance wilh NFRC and requires supporting documentation.
Project Title: Health & Counseling Center Report date: 06/05/18
Data filename: 2:\2017 Projects\17'l 64 CRMS Holden House\energy - com check\CRMS Holden House Medical Cenler.cck Page 1 of 1 0
Air Leakage, Component Certification, and Vapor Retarder Requirements:
E 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
¡ 2. Windows, doors, and skylights certified as meeting leakage requirements.
g 3. ôomponcnt R values & U-faclors labeled as certified.
¡ 4. No roof insulalion is inslallecl on a srrspended ceiling with removable ceiling panels.
g 5. 'Othe/ components have supporting documenlalion for proposed U-Factors.
¡ 6. lnsulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
g;Zi 'Stal4 elevator shaft venls, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
E 8. Cargo doors and loading dock doors are wealher sealed.
D 9. Recessed lighting fixtures installed in the building envelope are Type lC rated as meeting ASTM 8283, are sealed with gasket or caulk.
¡ 10.Buibiñg ehtrance doors have a vestibule equipped with self-closing devices.
Exceptions:
I Building entrances with revolving doors.
I Doors not intended to be used as a building entrance.
I Doors thal open directly from a space less than 3000 sq. fl. in area.
I Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
fl Doors opening direcily from a sleeping/dwellìng unit.
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in lhis document is consistent with the building plans, specifications
and other calculations subm¡tted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC
requirements in COMcheck Version 4.0.8.0 and to comply with the mandatory requiremenls in the Requirements Checkl¡st.
Garrett Bowling qß 1l;ltS
Name - Title Sìgnature Date
Project Title: Health & Counseling Center Report date: 06/05/18
Data tilename: 2:\2017 Projects\17164 CRMS Holden Housc\cnergy - com chcck\CRMS Holdcn House Mcdical Centcr.cck Pagc 2 of 10
COMcäeck Software Version 4.0.8.0
lnterior Lighting Compliance
Certificate
Section 1; Project lnformation
Energy Code: 2009 IEGG
Project Title: Health & Counseling Center
Project Type: New Construction
Construction Site:
499 Holden Way
Carbondale, CO 81623
Owner/Agent:
Joe White
Colorado Rocky Mountain School
499 Holden Way
Carbondale, CO 81623
jwhite@crms.org
Designer/Contractor:
Section 2: Interior Lighting and Power Calculation
A
Area Category
B
Floor Area
(fr2)
c
Allowed
Watts /ft2
D
Allowed Watts
(BxC)
Healthcare-Clinic 1971 1971
Section 3: lnterior Lighting Fixture Schedule
A
F¡xture lD : Descr¡ption / Lamp / Wattage Per Lamp / Ballast
Total Allowed Walts = 1971
BCD
Lamps/ # of Fixture
Fixture Fixtures Watt.
E
(cxD)
Healthcare-Clinic (1 971 sq.ft.)
LED I: Type Bl: LED Linear 33W:
LED 2: Type 82: LED Linear 33W:
LED 3: Type 83: LED Linear 15W:
LED 4: Type C l : LED Linear 33W:
LED 5: Type C2: LED Linear 22W:
LED 6: Type C3: LED Linear 33W:
LED 7: Type D1: LED Linear 22W:
LED 8: Type D2: LED Linear 33W:
LED 9: Type D3: LED Linear 33W:
LED I 0: Type F1 : LED A Lamp 1 1 W:
LED 1 1: Type F2: LED A Lamp 13W:
LED 12: Type G1 : LED A Lamp 9W:
LED 13: Type G2: LED A Lamp 13W:
LED 14: Type U4: LED Undercabinel Unit 17.1W:
LED 15: Type U6: LED Undercabinet Unit 24W:
4
I
4
5
2
1
1
'1
'1
7
8
4
b
'1
1
38.8
28.4
14.2
40.9
28.5
61.4
26
32
32
11.2
tb.5
10
14
18
36
155.2
28.4
56.8
204.5
57
61.4
26
32
32
78.4
132
40
84
18
36
Total Proposed Watts = 1042
Section 4: Requirements Checklist
lnter¡or Lighting PASSES 47"A freïü than code.
Lighting Wattage:
g 1. Total proposed watts must be less than or equal to tolal âllowed watts.
Allowed Watts
1971
Proposed Walts
1042
Complies
YES
Project Title: Health & Counseling Center Report date: 06/05/18
Data filename: 2:\2017 Projects\17164 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page 3 of 10
Controls, Switching, and Wiring:
¡ 2. Daylight zones under skylights more than 15 feet from the per¡meter have lighting controls separate from daylight zones adjacent to
vefiical fenesh'ation.
3 3. Daylight zones have individual lighling controls independent from that of the general area lighting.
D4.
D5.
tr6.
D7.
D8.
Exceptions:
Q Contiguous daylight zones spanning no more than two orientations are allowed to be conlrolled by a single controlling device.
D Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a
separate switch for general area lighting.
lndependent controls for each space (switch/occupancy sensor).
Exceptions:
D Areas designated as security or emergency areas that must be continuously illuminated.
I Lighting in stairways or corridors that are elements of the means of egress.
Masler switch at entry to hotel/motel guest room.
lndividual dwelling units separately metered.
Medical task lighting or arVhistory display lighting claimed to be exempt from compliance has a conlrol device independent of the control
of the nonexempt lighting.
Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either
controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps, switchino the middle
lamp luminaires independently of other lamps, or switching each luminaire or each lamp.
Exceptions:
fl Only one luminaire in space.
I An occupant-sensing device conlrols the area.
I The area is a corridor, storeroom, restroom, public lobby or sleeping unit.
E Areas that use less than 0.6 Watts/sq.ft.
D L Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
I Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safely or security
¡ 1 0. Photocell/astronomical lime switch on exterior lights.
Exceptions:
I Lighting intended for 24 hour use.
3 11.Tandem wired one-lamp and three-lamp ballasted luminaires (No single-lamp ballasts).
Exceptions:
I Eleclronic high{requency ballasts; Luminaires on emergency circuits or with no available pair.
Section 5: Compliance Statement
Compliance Statement: Ïhe proposed lighting design represented in this document is consistenl with the building plans, specifications
and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2009 IECC
requirements in COMcheckVersion 4.0.8.0 and to comply with the mandatory requirements in the Requirements Checklist.
Garrett Bowling çß 6lslr8
Name - Title Signature Date
Project Title: Heallh & Counseling Center Report date: 06/05/1 8
Data f ilename: 2:\2017 Projects\171 64 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page 4 of 1 0
GOMcåeck Software Version 4.0.8.0
Exterior Lighting Compliance
Certificate
Section 1: Project lnformation
Energy Code: 2009 IECC
Project Title: Health & Counseling Center
Project Type: New Construction
Exterior Lighting Tone'. 3 (Other)
Construction Site:
499 Holden Way
Carbondale, CO 81623
A
Exterior Area/Surface
Owner/Agent:
Joe While
Colorado Rocky Mountain School
499 Holden Way
Carbondale, CO 81 623
jwhite@crms.org
Quant¡ty
Section 2: Exterior Lighting Area/Surface Power Calculation
Designer/Contractor:
D
Tradable
Wattage
EF
Allowed Proposed
Watts Watts
(BxC)
B c
Allowed
Watls
/ Unit
Entry canopy 405 ll2 0.4 Yes 162 64
Total Tradable Watts. = 162 64
Total Allowed Watts = 162
Total Allowed Supplemental Watts.- = 750
- Wattage tradeoffs are only allowed between tradable areas/surfaces.
** A supplemental allowance equal to 750 watts may be applìed toward compliance of both non{radable and iradable areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A
Fixture lD : Description / Lamp / Wattage Per Lamp / Ballast
BCDE
Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
Enùy canopy (405 ftz): Tradable Wattage
LED 1: LED MR 10W:
LED 2: LED MR 7W:
5
2
10
7.1
50
14"2
Total Tradable Proposed Watts = 64
Section 4: Requirements Ghecklist
Lighting Wattage:
q 1. Within each non-tradable areaLlsurface, lotal proposed watts must be less than or equal to total allowed walts. Across all lradable
areas/surfaces, total proposed watts must be less than or equal to total allowed watts.
Compliance: Passes.
Controls, Switching, and Wiring:
g 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting.
g 3. Lighting not des¡gnated for dusk-to-dawn operation is controlled by either a a photosensor (w¡th time switch), or an astronomical time
switch.
g 4. Lighting designated for dusklo-dawn operation is controlled by an astronomical time switch or photosensor.
0 5. All time switches are capable of retaining programming and the time sett¡ng during loss of power for a period of at least 10 hours.
Exterior Lighting Efficacy:
Project Title: Health & Counseling Center Report date: 06/05/18
Data filename: 2:\2017 Projects\171 64 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page 5 of 1 0
D 6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt.
Exceptions:
fl Lighting that has been claimed as exempt and is ident¡fied as such in Section 3 table above.
E Llght¡ng that is specifically dês¡gnatêd as requlrêd by a hêalth or life safety statue, ordinance, or rêgulåtion
I Emergency lighting that is automatically off during normal building operalion.
Q Lighting that is conlrolled by motion sensor.
Section 5: Compliance Statement
Compliance Slatement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications
and other calculations submitted w¡th this permit application. The proposed lighting system has been designed to meet the 2009 IECC
requirements in COMcheck Version 4.0.8.0 and to comply with the mandatory requirements in the Requirements Checklist.
Garrett Bowling çß 6lsl!8
Name - Title Signature Date
Proiect Title; Health & Çounseling Center Report date: 06/05/18
Data filename: 2:\2017 Frojects\17164 CRMS I lolden I louse\energy - com check\CRMS l-lolden l-louse Medical Genter.cck Page 6 of 1 0
COMcheck Software Version 4.0.8.0
Mechan ¡cal Gompliance Certificate
Section 1: Project lnformation
Energy Code: 2009 IECC
Project Title: Health & Counseling Cenler
Project Type: New Construction
Construction Site:
499 Holden Way
Carbondale, CO 81623
Owner/Agent:
Joe White
Colorado Rocky Mountain School
499 Holden Way
Carbondale, CO 81623
jwhite@crms.org
Carbondale, Colorado
5b
Designer/Contractor
Section 2: General lnformation
Building Location (for weather data)
Climate Zone:
Section 3: Mechanical Systems List
Quantity System Type & Description
BB-1 (Single Zone) :
Heating: 7 each - Hydronic or Steam Coil, Hot Water, Capacity = 2040 kBtu/h
No minimum efficiency requirement applies
Fan System: None
BB-2 (Single Zone) :
Heating: 3 each - Hydronic or Steam Coil, Hot Water, Capacity = 1020 kBlu/h
No minimum efficiency requirement applies
Fan System: None
BB-3 (Single Zone) :
Heating: 5 each - Hydronic or Steam Coil, Hot Water, Capacity = 4080 kBtu/h
No minimum efficiency requirement applies
Fan System: None
BB-4 (Single Zone) :
Heating: 4 each - Hydronic or Steam Coil, Hot Water, Capacity = 3060 kBtu/h
No minimum efficiency requirement applies
Fan System: None
BB-5 (Single Zone) :
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 2805 kBtu/h
No minimum efficiency requirement applies
Fan System: None
WH-1:
Gas Storage Water Heater, Capacity: 82 gallons, lnput Rating: 160 kBtu/h w/ Circulation Pump
Proposed Efficiency: 100.00 % Et, Required Efficiency: 80.00 % Et
Section 4: Requirements Checklist
Requirements Specific To: BB-l :
g 1 . Balancing and pressure lest connections on all hydronic terminal devices
g 2. Meets the condenser heat recovery requìrement for service water heating
Exception(s):
tr Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
Project Title: Health & Counseling Center Report date: 06/05/18
Data filename: 2:\2017 Projects\'l7164 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page 7 of 10
2
D Facilities that provide 60% of their service water heating from s¡te solar or sile recovered energy or from other sources.
g 3. Chilled water pumping systems with multiple chillers must automalically reduce chilled water flow rates proportionately when chillers are
not operating
D 4. Hot water pumping syslems w¡th multiple boilers automatlcally Íeduce hol water flow rates proportlonately when bollers are not
opcraling
Requirements Specific To: BB-2 :
g 1. Balancing and pressure test connections on all hydronic terminal devices
L] 2. Meets the condenser heat recovery requirement for service water heating
Exception(s):
f| Facilities lhat employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
D Facilities thal provide 60% of their service water heating from site solar or site recovered energy or from other sources.
¡ 3. Chilled water pumping systems wilh multiple chillers must automatically reduce chilled water flow rates proportionalely when chillers are
not operating
E 4. Hol water pumping systems with multiple boilers automatically'reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: BB-3 :
g 1. Balancing and pressure test connections on all hydronic terminal devices
E 2. Meets the condenser heat recovery requirement for service water healing
Exception(s):
tr Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
tr Facililies that provide 60% of their service water heating from site solar or sile recovered energy or from other sources.
p 3. Chilled water pumping systems with multiple chillers musl automatically reduce chilled water flow rates proportionately when chillers are
not operating
E 4. Hot water pumping systems wilh multiple boilers automatically reduce hol water flow rates proportionately when boilers are not
oPerating
Requirements Specific To: BB-4 :
g 1 . Balancing and pressure lest connections on all hydronic terminal devices
g 2. Meets the condenser heat recovery requirement for service water heating
Except¡on(s):
B Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
B Facilities thal provide 60% of their service water heating from site solar or site recovered energy or from other sources.
3 3. Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
E 4. Hol water pumping syslems with mult¡ple boilers automatically reduce hot water flow rates proportionately when boilers are not
operaling
Requirements Specific To: BB-5 :
g 1. Balancing and pressure test connections on all hydronic terminal devices
E 2. Meets the condenser heat recovery requirement for service water heating
Exception(s):
tr Faclllties that employ condenser heat recoveÍy for space heating with a heat recovery des¡gn exceeding 30% of the peak
water-cooled condenser load at design conditions.
tr Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
3 3. Chilled water pumping systems with multiple chillers musl automatically reduce chilled water flow rales proportionalely when chillers are
not operating
E 4. Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: WH-l :
p 1. Water heatìng equipment meets minimum efliciency requirements: Gas Storage Water Healer efflclency: 80.00 % Et (212 SL,
kBtu/h)
D 2. All piping in circulating system insulated
¡ 3. Hot water slorage temperature controls that allow setpo¡nt of 90'F for non-dwelling units and 110'F for dwelling units.
¡ 4. Automatic time control of heat tapes and recirculaling systems present
g 5. Controls will shut off operation of circulating pump between water heater/boiler and storage tanks within 5 minutes after end of heating
cycle
Generic Requirements: Must be met by all systems to wh¡ch the requirement ¡s appl¡cable:
D 1. Plant equipment and system capacity no greater lhan needed to meet loads
Project Title: Heallh & Counseling Center Report date: 06/05/18
Data filename: 2:\2017 Projects\17164 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page I of 10
Exception(s):
D Standby equipment automatically off when primary system is operating
D Multiple units controlled to sequence operation as a function of load
g 2. Minimum one temperature conlrol device per system
¡ 3. Minimum one humidily control device per installed humidificalion/dehumidification system
E 4. Load calculations per ASHRAE/ACCA Standard 183.
D 5. Automatic Controls: Setback to 55"F (heat) and 85'F (cool); 7-day clock, 2-hour occupant override, 1 O-hour backup
Exception(s):
tr Continuously operaling zones
¡ 6. Outside-air source for ventilation; system capable of reducing OSA to required minimum
g 7. R-5 supply arrd telurn air duct ìnsulation in unconditioned spaces
R-8 supply and return air duct insulatìon outside the building
R-8 insulation between ducts and the building exterior when ducts are part of a building assembly
Exception(s):
D Ducts located within equiPment
tr Ducts with interior and exterioÍ temperature difference not exceeding 15"F.
¡ 8. Mechanical fasteners and sealanis used to connect ducts and air distribution equipment
¡ 9. Ducis sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 1814 or 1 81 B tapes and mastics
¡ 10. Hol water pipe insulation: 1.5 in. for p¡pes <= 1.5 in. and 2 in. for pipes >1 .5 in'
Chilledwater/refrigerant/brinepìpeinsulation: l.5in.forpipes<=1 .5in.and'1 .Sin.forpipes>1.5¡n.
Steam pipe insulalion: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in.
Exception(s):
tr Piping within HVAC equipment.
tr Fluid temperatures between 55 and 105'F.
A Fluid not heated or cooled wilh renewable energy.
tr Piping within room fan-coil (w¡th AHRl440 rating) and unit ventilators (with AHRl840 rating).
D Runouts <4 ft in length.
E l l.Operation and maintenance manual provided to building owner
g 12. Balancing devices provided in accordance with IMC 603.17
g 13. Demand control ventilation (DCV) present lor high design occupancy areas (>40 person/1 000 ft2 in spaces >500 lt2) and served by
systems w¡th any one of 1) an air-side economizer, 2) automatic modulating conlrol of the outdoor air damper, or 3) a design outdoor
airflow greater than 3000 cfm.
Exception(s):
tr Systems with heat recovery.
tr Mulliple-zone systems withoul DDC of individual zones communicaling with a cenlral control panel.
tr Systems with a design outdoor airf low less than 1200 cf m'
tr Spaces where the supply airflow rate minus any makeup or outgoing lransfer air requirement is less than 1200 cfm.
¡ 14.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
Exception(s):
tr Gravity dampers acceptable in buildings <3 stories
D l5.Automatic controls for freeze protection systems presenl
g 16.Three-pipe systems nol used
g 17. Exhaust air heat recovery included for syslems 5,000 cfm or greater with more lhanTlk outside air fraction or specifically exempted
Exception(s):
Hazardous exhaust systems, commercial kitchen and clothes dryer exhausl systems lhat the lnlernational Mechanical Code
prohibits the use of energy recovery systems.
Systems serving spaces that are heated and not cooled to less than 60'F.
Where more than 60 percent of the ouldoor heating energy is provided from site-recovered or site solar energy.
Heating systems in climates with less than 3600 HDD.
Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64"F.
Systems requiring dehumidification that employ energy recovery in series w¡th the cooling coil.
Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup a¡r
volume to 50 percent or less of design values or, a separate make up air supply meeting the followìng makeup air requirements:
a) at least 75 percent of exhaust flow rate, b) heated to no more than 2"F below room setpoint temperature, c) cooled to no lower
than 3"F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling.
Project Title: Health & Counseling Center Report date: 06/05/1 I
Data filename: 2:\2017 Projects\171 64 CRMS Holden House\energy - com check\CRMS Holden House Medical Center.cck Page 9 of 1 0
tr
D
a
tr
tr
tr
fl
Section 5: Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specificalions
and other calculations subm¡tted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC
requiremenls in COMcñeckVersion 4.0.8,0 and to comply with the mandatory requirements in the Requirements Ghecklist.
Garrett Bowling ç8 ('lsltï
Name - Tille Signature Date
Section 6: Post Gonstruction Compliance Statement
tr HVAC fecord drawings of the actual installation, system capac¡ties, calibratlon information, and performance data for each equipment
provided to the owner.
tr HVAC O&M documents for all mechanical equipment and system provided to lhe owner by the mechanical conlractor.
E Written HVAC balancing and operations report provided to lhe owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Dale
Project Title: Health & Counsel¡ng Center Report date: 06/05/18
Data filenante: 2:\2017 Ptojecls\17164 CRMS Holclen House\energy - com check\CRMS Holden House Medical Center.cck Page I 0 of I 0