Loading...
HomeMy WebLinkAboutArchitectural Committee Approval 09.06.2018BATTLEMENT MESA Service Association September 6, 2018 Sanchez Drywall Inc 110 W Main Street Silt CO 81652 RE: 410 Meadow Creek Drive Dear Sir or Madam, This letter is in regards to your application to the Architectural Committee to build a new home. The Architectural Committee met on Wednesday, September 5, 2018. Your application has been approved. You cannot finish the gable ends with vertical siding. It must be stuccoed to match the house or other conforming material. If you have any questions please contact Steve Rippy at 970-285-9432. Regards, :`IFC(' 4, %Weft Amie L. Martin Office Manager Enclosure The Colorado Dream 401 Arroyo Drive • Battlement Mesa, Colorado 81635 PHONE: 970.285.9432 FAX: 970.285.9631 EMAIL: BMSA@BattlementMesaColorado.com WEB: www.BattlementMesaColorado.com BATTLEMENT MESA Service Association ARCHITECTURAL REVIEW COMMITTEE (ARC) NEW HOME CONSTRUCTION APPLICATION Date: ?tic)/ -13( Village_eger►,e Lot #: 1 S Block # Owner: General Contractor: Street Address: y/O hada W Vie, �[ Name: r�Gi Nt C•►IQ,Z , 4t 4ai � llll Address: UO ua 41-41-1 1n City: State: S i l State: Cr__) Zip: C1 / L 52 - Telephone: LTelephone: `1+° 3 l cut4 Fax Number: Cell Phone: q%e-) 3i-ct 9 (6 6 E-mail: SoLvt.c.. It• s Z d0 �q_�nnrir 1 Name: CJLk L , u 1 �G Address: Lr t3 .)-$ I City: S < <� State: CL Zip: 3.l. -r2 C.= w. Telephone: y,( Jb . Fax Number: Cell Phone: E-mail: Architect II Or Draftsman. Name: CO - 1i ��S �a vu _ LQ. 2— Address: Address: 3 ! 2— 14- u.J 1„` 1.3 City: { , t f-(- State: C Zip: /6 Sz Telephone: 3 a(4 C Fax Number: Cell Phone: E-mail: -5 c D►.tf (cS 22-(-2 Q i - vv-, Section I. As the Architectural Standards are modified periodically and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that the design and construction of a project conform to the requirements of the Architectural Standards. The intent of this Application is to provide a guide for an owner or the architect to ensure a complete submittal. However, this application shall be signed, dated and submitted with the plans package in order for the preliminary submittal to be deemed complete by the Architectural Review Committee. Failure to do so may delay review of the proposal. The Architectural Standards are comprehensive in scope for designing homes within Battlement Mesa. Please review the Architectural Standards carefully prior to presenting a submittal to the Architectural Review Committee. Excavation at site ma not commence until the ARC has a roved construction and foundation lans. BATTLEMENT MESA Service Association This portion of the Application. Form is to be completed by the Architectural Committee (not the Applicant) COMMONS OF APPROVAL or DISAPPROVAL 1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the Project has received a Project approval from the Architectural Committee and has been issued a building permit (as required by Garfield county for new home or Renovation projects). 2. All general building, site improvements, landscaping and revegation to specifically include the front, side and rear yard areas for any Project shall be completed and shall have passed a Final Compliance Inspection no later than eighteen (18) months after Project approval by the Architectural Committee. It is the responsibility of the owner or builder to furnish the Architectural Committee a copy of the Certificate of Occupancy within one (1) week of issuance of the Certificate of Occupancy. 3. If the selections of colors and/or landscaping plans are not included with this application they must be submitted for approval beforeanyaction is taken to install the missing items. 4. Ow 6 ft. C.J'cis C'a.J .sr„ +.,l,;S?:re-el ee)/A. Verb?,) f Sich;iq — 014574 6c _5'f+err o .ror or �YAtr C��.,1 r r: r ,4-144�r.Q r J 5. 6. Application Approval (Initials of Architectural Committee Members): By: Application Approved for Cons tion subject to the above conditions: By Chairman: 3/34 ,Fxr Date: ? Application Denied (Initials of Architectural Committee Members): By: Application Denied for reason(s) stated above: By Chairman: Date: