Loading...
HomeMy WebLinkAbout6.0 PermitVIII 1P,ill'alli ffl+ALialiri(Xini 'ilrhifi ri 11111 Recept 1 on#3 : 912455 10/02/2018 03:03:12 PM Jean Rlberico 1 of 4 Rec Fee:$0,00 Doc Fee:0.00 GARFIELD COUNTY CO LAND USE CHANGE PERMIT for A Parcel of Land Owned by David and Roslyn Hatch located south of the City of Rifle at 1885 County Road 319, Rifle, CO 81650, in Section 23, Township 6S Range 93W of the 6t' Principal Meridian, further described in Exhibit A. (Assessor's Parcel No. 2177-233-00-253) In accordance with and pursuant to provisions of the Garfield County Land Use and Development Code of 2013, as amended, and a Resolution of Approval (Resolution Number 2018-5) of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: A TELECOMMUNICATION FACILITY (LIPA-08-17-8569) This Land Use Change Permit is issued subject to conditions of approval as set forth in Exhibit "B" and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: erk of the Board GARFI COM COL • LD -COLI ISSIONER "ADO TY BOARD OF COUNTY GARFIELD COUNTY, /0 f .PB Date Ch Page 1 of 4 1111.IVOl'GOIM 11111 Receptionl3: 912455 1O/O2/2O1B 03:00:12 PM Jean Alberico 2 of 4 Rec Fee:SO.OD Doc Fee:D.O0 GRRFIELD COUNTY CO Exhibit A (Legal Description) Township 6 South, Range 93 West of the 6th Principal Meridian Section 23: NW1/4SW1/4 EXCEPTING a tract of land described as follows: Commencing at the Southwest corner of said NW1/4SW1/4, thence Northerly along the West line of said NW1/4SW1/4 466.7 feet, thence Easterly and parallel with the South line of said NW1/4SW1/4 466.7 feet, thence Southerly and parallel with the West line of said NW1/4SW1/4 466.7 feet to the South line of said NW1/4SW1/4, thence Westerly along the South line of said NW1/4SW1/4 466.7 feet, more or less, to the point of beginning. FURTHER EXCEPTING therefrom that portion conveyed via Quit Claim Deed August 8, 2001 in Book 1275 at Page 859 as Reception No. 585895 and Quit Claim Deed recorded January 14, 2004 in Book 1554 at Page 486 as Reception No. 644561. County of Garfield, State of Colorado Page 2 of 4 ■III filrdENfiNlii111111 With NIVI,P M.,14,ti Lill 111 Reception#: 912455 10/02/2018 03:00:12 PM Jean Alberlco 3 of 4 Rec Fee:$0,00 Doc Fee:0.00 GARFIELD COUNTY CO Exhibit B Conditions of Approval 1. That all representations made by the Applicant in the application shall be conditions of approval unless specifically altered by the conditions of approval as adopted by the Board of County Commissioners. 2. That the facility shall be operated in accordance with all applicable Federal, State and local regulations governing the operation of this type of facility including but not limited to all FCC and FAA regulations. 3. The Applicant shall maintain compliance with all FAA and FCC permitting requirements including but not limited to safety requirements, non-interference provisions, and conditions of approval. 4. Prior to the issuance of the Land Use Change Permit, the Applicant shall provide structural and foundation engineered plans prepared by a qualified professional engineer. The tower shall be designed to carry appropriate gravity and wind Toads. The engineering plans shall be reviewed and accepted by the Community Development Department and the Garfield County Engineer. 5. Prior to the issuance of the Land Use Change Permit, the applicant shall work with Colorado River Fire Rescue and the Community Development Department to ensure that the location is addressed to the satisfaction of both entities and to allow for adequate emergency response. Demonstration that this condition has been met shall be supplied from Colorado River Fire Rescue. 6. Prior to the issuance of the Land Use Change Permit, the applicant shall provide the lease between MBC Grand and the property owner to demonstrate that the telecommunication facility shall be removed upon expiration of the lease agreement. 7. Prior to the issuance of the Land Use Change Permit, the applicant shall demonstrate legal access to the site from the County Road to the use. Demonstration of legal access shall be reviewed and accepted by the Community Development Department and the County Attorney's Office. 8. Prior to the issuance of the Land Use Change Permit, the applicant shall record at the Garfield County Clerk and Recorder, an Avigation and Hazard Acknowledgement or other similar documentation acceptable to the Garfield County Attorney's Office and Airport Director. A demonstration of compliance with this condition shall be reviewed and accepted by the Community Development Department and the County Attorney's Office. 9. No construction shall commence without all federal, state, and local permits being issued and final, including but not limited to Garfield County Building Permits, Page 3 of 4 1111101. 7Prif iriflk fti Ni.10171 91.M I, t lib 11111 Reception#: 912455 10/02/201B 03:00:12 PM Jean Rlberico 4 of 4 Roc Foe:$0.00 Dec Fee:D.00 GARFIELD COUNTY CO State of Colorado Electrical Permits, FAA and FCC Permits as required. 10. Potable water and sanitation shall be addressed during construction by provision of portable facilities in compliance with OSHA requirements. 11. The area of disturbance shall be re -vegetated during the next growing season after completion of construction. Dust suppression during construction activities shall be provided. 12. The facility shall be operated in compliance with all lightning protection requirements. Any light not required by the FAA shall comply with Garfield County Lighting Standards as detailed in Section 7-304 of the Land Use and Development Code. 13. The applicant shall install a Knox Box security lock and work with the Colorado River Fire District to make sure it is operational. 14. The applicant shall use the updated grading and drainage plan (Exhibit 18) for construction and operation of the tower. The applicant shall also install a culvert for grading and drainage as represented in (Exhibit 16). 15. The accessory structure shall utilize non -reflective construction materials. 16. The newly constructed access road to the use shall comply with Roadway Standards in Section 7-107 of the Land Use and Development Code. 17. The height of the tower shall not exceed 160 feet. Page 4 of 4