HomeMy WebLinkAbout2397~-'
,. ,,·
.,/'!ifl:j,,,.
\ . ,Job Address I ,
. .• ·[ ~ture of Work
Use of Building
Owner
I I
•l .,
GARFIELD COUNTY BUILDING AND SANITATrON DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
, (303) 945-8241 / (303) 625-3321
Exxon'·Company, USA -Perachut1 1 Tenn1nal Area
Building Permit
Craft Bu11d1ng, Instrumentation -Bldg No If-55
Exxon Company• 'IIISA
Coi,tr:actor Brown & Root. Inc ..
, Amount of Permit: $ _8_4_._00 _______ _ Date:
,.,
-: • .'..c.',.,;,.,, ,,. ,. J,",'"''·•·"·';· •. ,,,_, .i.·, ,~ll_, __ ..,~.: .. 1a:.
March 1. 1982
Patsy J • T anneY
Clerk
_.,.. Wit
B·-uILDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
Bldg. No. TF-55
Garfield County, Colorado, ____ F_e_b_._1_2 __ , 19 E.
0 Exxon Company, U.S.A. wner: --------------------------------------------
c B ·id Brown and Root, Inc • ontractor or U1 er:--------------------------------------
Location: Parachute, Colorado, Terminal Area -Temporary Facilities
Purpose for which building is to be used: __ C_r_a_f_t_B_u_i_l_d_1._· _n-=g,__-__ I_n_s_t_r_u_m_e_n_t.:....;..a....:t_i_o:...n __________ _
Size of Lot: ___ N_/_A ____________________________________ _
Distance of buildi_ng from property line at
Front: ___ N_/A ___ _ Rear: ____ N_/_A ___ _ Left Side: __ N_/_A __ _ Right Side: ___ N_/A __ _
Distance from nearest building: _____ N_/_A ___ _ Number of stories: ___ o_n_e ___________ _
Source of water supply: ________ N_/_A ____ _ Number of rooms: ___ o_n_e ___________ _
Type of sewage disposal: _______ ......,.+-.__ __ _ Concrete blocking Type of foundation: ___________ ......:... ___ _
Width of building: ___ 2~0-' __________ _ M . l. 'd ll 2 X studs atena m outs1 e wa s: _____________ _
Length of building: --~4~0~' -----------Metal Exterior finish: _________________ _
f 8 I Height o walls:----~-----------
Metal
Type of roof:------------------
Floor space in square feet: ____ 8_0_0_' _______ _
· Estimated value: $ _1_7___,_,_3_3_0_._0.:....c;.0 _________ _
Date construction will begin: Existing Date of completion: _______________ _
Permit charge: $ _8_4_• _0_0 _______ _
Plan check fee: $ ____________ _
TOTAL: $_8_4_-_o_o _______ _
And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully, --/+i...:;.::_~~~--r,£~._vnJ_· ..::..__~~,r:...==-=---· ------
Floyd E. Myres
Senior Permit Coordinator
er· The County Commissioners hereby grant tbe above permit as per terms therein stated. Tbis __ -,,./'---~-----day of
BUILDING OFFICIAL
-!·--··-··
.~ ;
" , .. ,
:TH
•
F"IELO EN6, OFFICE
/Tr:--24 k1N ~S!TION
'ElECTRlCAl
SHOP
; f?A.111...01~~
SHOf
I t,\51'~ MEl·ff
5HOP
/rF-551
TO ARRIVE 2/1 V62
MOVE J.,-lK.OF Z/B-12/82
~ ~
M\\...\.-VJRlbl·ff
S\tOP
~
rruruR~l
.
I OH'ICE I
L.: ---I
--MOVE 2/u/az. ._____ /E.)l.l'AvAr,oJJ
. I ---; I TF-le, I OFFICE.
RIG,G/1,J~
Srlo~
MOVE ~K.OF 3/c.2-2t/82
co·~4o' CRAFT OFFfC[ lOC,U/ONS
{StE CRAPT Off/CE BUILDING 5CHEOULE)
N.T, S.
-:::::, --
"·
!
.
dPC -2/3/82 REV, i
j
J
E)f{ON COMPANY. U.S.A.
POST OFFICE BOX 30B • GRAND JUNCTION, COLORADO B 1502
COLONY SHALE OIL PROJECT
Mr. William J. Thompson
Chief Building Inspector
Garfield County Department of Development
2014 Blake Avenue
Glenwood Springs, Colorado 81601
Dear Bill:
September 14,
We have removed two modular buildings from our property that were located at our
________.___ -·-._.Parachute --ferminah--.. ·These.,bu..ildings were identified as follows:
~---
o 24' x 54' modular building Colony Number PF 45 (medical building)
and Garfield County Permit Number 1887.
o 20' x 40' modular building Colony Number PF 55 (Instrumentation)
and Garfield County Permit Number 2397.
Since the buildings have been moved out of state we would like them removed
from your permit files.
Thank you for your cooperation.
ACB:eab
Attachment
c: Mr. Claude Crampton -Houston
A DIVISION OF EXXON CORPORATION
Very truly your,
~~
A. C. Bishard
Regulatory Affairs