HomeMy WebLinkAboutApplication- PermitGarfield County
Building & Sanitation Department
108 8th Street, Suite #40I Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. 10078
Job Address 35 1 5Cxx1'-res-u3 '('a \xtK, -+ 8 �T I e✓5
By5h 10 -+ids
Nature of Work Building Permit 2-140q — its -Le _0 2-' Od _]
Use of Buildin
Owner MC -
Contractor
rd + tbGW/Gt1
T
Contractor S i a K recast
Amount of Permit $ 1 7 (0
Date
Cler r
GARF D COUNTY BUILDING PERMIT APPLICATION
(10B 8" Street. Suite 201. Stemmed Spring'. CO 81801
3 �9 1/4.5)C8
. `� Ph* • -: 9700--94468212 / Ms: 970-984-3470 / Inspection Line: 970-9845009
Permit No: _� V
Parcel/Schedule No7' fes} 23 y6Z D7
Job Addres _T^�_1 paa61435 er
R? -
1 Lot No:St (� Block No: / E7temptlort '`' • �1
ita
FY/I1
�N �Wk,Ph:
2
Owner:
j�
$4Ce .ut -1--5 J4,,�_
Address�
ix-4•et.iw /%
pts r Z `
`i STT 7 4
3
Contractoks 1
_?6f
Address:
ph.
Llc. No.
4
Architect/Engineer: ecAddress:
t
Ph:
Lin No.
5
Sq. Ft. of Building;
z-wic est"
Sq. Ft. of Lot:
.7„AD d
Height:
Z-0
No. of Floors:
I
(1
Use of Budding: Siso P 't__.k' -^ A /1
�LN,f«"`�(/`
7
Describe Work:'Zeit-goo-en
Pt'bp 6i't LC oCc r 'Z� �� l-2cnr- Gf--S
8
Class of Work: ❑ New a Alteration 4, Remove
Li Addition J Move
4
10
Garage: ❑ Single
❑ Double
Carport: O Single
J Double
o Driveway Permit 0 On -Site Sewage
Disposal
J Site Plan
11
Valuation of Work: S2 C 7 �C.iri^
Adjusted Valuations: S
2200
12
Special Conditions:
5'-e�Plan
%
Nonce
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
BY THE STATE OF COLORADO.
TEES
IS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS. OR. IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK I5 COMMENCED
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT.
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO VIOLA E OR CANCEL THE PROVISIONS OF ANY OWER STATE
LOCAL • ULA CO - r CTION OR THE PERFORMANCE
OF C• ' •- ON i'\, //I /
�� _
A
ALL
BE
THE
OR
Check :
�� /
Perm Fee:
ZS'THISSUED
g3 .2.5—
Total Fee:
1'27 34, -
Dated Permit Issued:
OCC �Group:
-.TType:
Zoning:
Setbacks:
Manu. Home:
ISDS No. &Fee:
BLDG ' D. PLNG D
APPAQV 1/DATE APPROVAL/DATE
17t.
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOFFED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION. ERECTION, CONSTRUCTION AND USE OF THE
ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS TN SAID PIANS. SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS. OMISSIONS OR DISCREPENCIES PONSI
BILLY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DEUILDER
AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNEREST
Garfom.003
I1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL)
TOdlle
eo `�%` /10 D °p�J`\�\\O/Jf .F 1`� I ° • r 1 1 1 n
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. Al] bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OFOCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # I Otrlcti
gnature
BpcontOct2004
/00 s'
Date
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24" and
drawn to scale.
1
,Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks,'balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded sub vision plat, shall include a copy of the building envelope as it is shown on
the final t with the proposed structure located within the envelope.
Yes
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual
Sewage Disposal System) and distances to the property lines, wells (on subject property
and adjacent,properties), streams or water courses? This information must be certified by
a licensed,s(trveyor with their signature and professional stamp on the design.
Yes I/ No Not necessary for this project
3. Are the plans submitted for application review construction drawings and not drawings
that are stam d or marked identifying them as "Not for construction, for permit issuance
only", " proval drawings only", "For permit issuance only" or similar language?
Yes No Not necessary for this project
2
Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado egistered Engineer?
Yes No Not necessary for this project
5. Does the site plan indicate the location and direction of the State, County or private road
accessing t property?
Yes
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes t No Not necessary for this project
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes a No Not necessary for this project
8. Do the plans ' dicate the location and size of ventilation openings for under floor crawl
spaces an e clearances required between wood and earth?
Yes No Not necessary for project
9. Do the plans i icate the size and location of the ventilation openings for the attic, roof
joist space d soffits?
Yes No Not necessary for this project
10. Do the plans i de design loads as required under the IBC or IRC for roof
snowload a minimum of 40 pounds per square foot in Garfield County)?
Yes No Not necessary for this project
11. Do the plans include design loads as required for floor loads undeythe IBC or IRC?
Yes No Not necessary for this project
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes No Not necessary for this project
13. Is the wind speed and exposure design included in the plan?
Yes No Not necessary for this project i/
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes 7 No Not necessary for this project
3
15. Does the building section drawing or other detail include the method of positive
connectiojof all columns and beams?
Yes P/ No Not necessary for this project
16. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top of flat roof? (Check applicable zone district for building height maximum)
Yes No Not necessary for this project
17. Does the plan include any stove or zero clearance fireplace planned or installation
including make and mo' = and Colorado Phase II certifications or Vase II EPA
certification? a
Yes No Not necessary for this project
18. Does the plan include a masonry fireplace including a fireplace sectio i4 indicating design to
comply with the IBC or IRC?
Yes No Not necessary for this project
19. Does the plan include a window schedule or other verification that' egress/rescue windows
from sleeping rooms and/or basements comply with the requirei$nts of the IBC or IRC?
Yes No Not necessary for this project
20. Does the Ian include a window schedule or other verification that windows provide
natural ' t and ventilation for all habitable rooms?
Yes No Not necessary for this project
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used
as a walking surface; sliding glass doors; fixed glass panels; shosyer doors and tub
enclosures and specify safety flaring for these areas? d/
Yes No Not necessary for this project
22. Do the plans include a complete design for all mechanical systems p)drned for installation
in this building?
Yes No Not necessary for this project ✓
23. Have all in the building been accurately identified for the intended use? (Occupancy
as identiin the IBC Chapter 3)
Yes No Not necessary for this project
24. Does the plan indicate the quantity, form, use and storage of any materials that
may be in use in this building?
Yes No Not necessary for this project
25. ' Is the loca 'on of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicate on the plan?
Yes No Not necessary for this project
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four emp)6yees and both sexes are employed, facilities for both sexes?
Yes ✓✓ No Not necessary for this project
27. Do the plan ndicate that restrooms and access to the building are handicapped
accessib
Yesf , No Not necessary for this project
28. Have two 2) complete sets of construction drawings been submitted with the
appli a n?
Yes No
29. Have you d, igned or had this plan designed while considering building and other
construct' n code requirements?
Yes No Not necessary for this project
30. Does the p accurately indicate what you intend to construct and what will receive a
final ins on by the Garfield County Building Department?
Yes No
31. Do your pl comply with all zoning rules and regulations in the County related to your
zone dis ' t? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning esolution for setbacks.
Yes No
32. Do you erstand that approval for design and/or construction changes are required
prior to he implementation of these changes?
Yes No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the ' e of application and that you will be required to pay the "Permit" fee as well
as any " tic System" or "Road Impact" fees required, at the time you pick up your
buildin permit?
Yes No
34. Are you aware that you are required to call for all inspections required under the IBC
including pproval on a final inspection prior to receiving a Certificate of Occupancy
and occ pancy of the building?
Yes No
5
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be .ven for an Agent and that the party responsible for the project must comply
with the U form Codes?
Yes No
36. Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
37. Are you aware that requesting inspections on work that is not ready or not accessible
will result ' a $50.00 re -inspection fee?
Yes No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You ca ontact the Road & Bridge
Department at 625-8601.(4
Yes No —/
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician d Plumber to perform installations and hookups? The license number will
be requir at time of inspection.
Yes No
40. Are you aware that on the front of the building permit application you will need to fill in
the Parcel/ edule Number for the lot you are applying for this permit on prior to
submi the building permit application? Your attention in this is appreciated.
Yes No
41. Do you know that the local fire d ct may require you to submit plans for their review
of fire safety issues? Yes No (Please check with the
building department about this requirement)
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit? /
Yes c/
I hereb knowledge that I have read, understand, and answered these questions to
y
Signature
Phone:in 5/ 7 GZ(days); (evenings)
Project Name: 47c My.- O f. 7<
Project Address: 33?
Note:
Date
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
No 1 UO175
gsiv
Assessor's Parcel No 244c1- 2.24 -o2--oo
Date 9 1512-00(4
BUILDING PERMIT CARD /B/' 1/
Job Address 3 3 9 5ca rrat .,, P'r htj+e ,L
$ T1 Trocv lens 1-1-4 o3k1 anis
Owner I'&C. E l roti 1 (-\-a✓lan AddressZi09 ScarruuJ A Ut Phone # M5 ° ' i Zla
ContractorS*Gr' TreCc,St Address ISao 02 2-5911 1C1/ -k Phone # taint
Setbacks: Front Rear RH LH Zoning
Shop Int
Soils Test
Footing
Foundation
Grout
Underground Plumbing
Rough Plumbing
Framing
Insulation
Roofing
Drywall
Gas Piping
INSPECTIONS
Weatherproofing
Mechanical
Electrical Rough (State)
l 'cal�Final (State)
ate)
Fina Checklist Completed
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
/4a firea(/SflzAta 932
(continue on back)
I INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
FOR INSPECTIONS
BUILDING PERMIT
GAR,�FIELD COUNTY, COLORADO
Date Issuedp !' 6 6NQ Zoned Area Permit No.1 01 IC
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
use Skop ttrt1 tii �p
Address or Legal Description 53 5 COJ r tva) l f `t , aysdtrgl
Owner McElroy I I ktrian ContractorSiar
stbarks Front Side Side Rear
Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Fo&ing
Driveway
Foundation
Underground Plumbing
Insulation
Rough Plumbing
Drywall
Chimney & Vent
aaa�
Electric Final (by State inspector)
Gas Piping
Final 9 /s OG /{�lic—
Electric Rough (By State Inspector)
Septic Final
Framing
(T include Roof in place and Windows
and Doors instated).
ote3. �� ��i2G
?% is
ALL LISTED ITEMS MUST BE INSPECTED ANI) APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APPROVEDDO NOT DESTROY THIS CARD
Date G4 By/HiSA
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC