Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Sanitation Department 108 8th Street, Suite #40I Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. 10078 Job Address 35 1 5Cxx1'-res-u3 '('a \xtK, -+ 8 �T I e✓5 By5h 10 -+ids Nature of Work Building Permit 2-140q — its -Le _0 2-' Od _] Use of Buildin Owner MC - Contractor rd + tbGW/Gt1 T Contractor S i a K recast Amount of Permit $ 1 7 (0 Date Cler r GARF D COUNTY BUILDING PERMIT APPLICATION (10B 8" Street. Suite 201. Stemmed Spring'. CO 81801 3 �9 1/4.5)C8 . `� Ph* • -: 9700--94468212 / Ms: 970-984-3470 / Inspection Line: 970-9845009 Permit No: _� V Parcel/Schedule No7' fes} 23 y6Z D7 Job Addres _T^�_1 paa61435 er R? - 1 Lot No:St (� Block No: / E7temptlort '`' • �1 ita FY/I1 �N �Wk,Ph: 2 Owner: j� $4Ce .ut -1--5 J4,,�_ Address� ix-4•et.iw /% pts r Z ` `i STT 7 4 3 Contractoks 1 _?6f Address: ph. Llc. No. 4 Architect/Engineer: ecAddress: t Ph: Lin No. 5 Sq. Ft. of Building; z-wic est" Sq. Ft. of Lot: .7„AD d Height: Z-0 No. of Floors: I (1 Use of Budding: Siso P 't__.k' -^ A /1 �LN,f«"`�(/` 7 Describe Work:'Zeit-goo-en Pt'bp 6i't LC oCc r 'Z� �� l-2cnr- Gf--S 8 Class of Work: ❑ New a Alteration 4, Remove Li Addition J Move 4 10 Garage: ❑ Single ❑ Double Carport: O Single J Double o Driveway Permit 0 On -Site Sewage Disposal J Site Plan 11 Valuation of Work: S2 C 7 �C.iri^ Adjusted Valuations: S 2200 12 Special Conditions: 5'-e�Plan % Nonce A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE BY THE STATE OF COLORADO. TEES IS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS. OR. IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR PERIOD OF 180 DAYS AT ANY TIME AFTER WORK I5 COMMENCED I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLA E OR CANCEL THE PROVISIONS OF ANY OWER STATE LOCAL • ULA CO - r CTION OR THE PERFORMANCE OF C• ' •- ON i'\, //I / �� _ A ALL BE THE OR Check : �� / Perm Fee: ZS'THISSUED g3 .2.5— Total Fee: 1'27 34, - Dated Permit Issued: OCC �Group: -.TType: Zoning: Setbacks: Manu. Home: ISDS No. &Fee: BLDG ' D. PLNG D APPAQV 1/DATE APPROVAL/DATE 17t. AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOFFED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION. ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS TN SAID PIANS. SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS. OMISSIONS OR DISCREPENCIES PONSI BILLY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DEUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNEREST Garfom.003 I1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL) TOdlle eo `�%` /10 D °p�J`\�\\O/Jf .F 1`� I ° • r 1 1 1 n The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. Al] bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OFOCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # I Otrlcti gnature BpcontOct2004 /00 s' Date GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24" and drawn to scale. 1 ,Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,'balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded sub vision plat, shall include a copy of the building envelope as it is shown on the final t with the proposed structure located within the envelope. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent,properties), streams or water courses? This information must be certified by a licensed,s(trveyor with their signature and professional stamp on the design. Yes I/ No Not necessary for this project 3. Are the plans submitted for application review construction drawings and not drawings that are stam d or marked identifying them as "Not for construction, for permit issuance only", " proval drawings only", "For permit issuance only" or similar language? Yes No Not necessary for this project 2 Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado egistered Engineer? Yes No Not necessary for this project 5. Does the site plan indicate the location and direction of the State, County or private road accessing t property? Yes 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes t No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes a No Not necessary for this project 8. Do the plans ' dicate the location and size of ventilation openings for under floor crawl spaces an e clearances required between wood and earth? Yes No Not necessary for project 9. Do the plans i icate the size and location of the ventilation openings for the attic, roof joist space d soffits? Yes No Not necessary for this project 10. Do the plans i de design loads as required under the IBC or IRC for roof snowload a minimum of 40 pounds per square foot in Garfield County)? Yes No Not necessary for this project 11. Do the plans include design loads as required for floor loads undeythe IBC or IRC? Yes No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes No Not necessary for this project 13. Is the wind speed and exposure design included in the plan? Yes No Not necessary for this project i/ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 7 No Not necessary for this project 3 15. Does the building section drawing or other detail include the method of positive connectiojof all columns and beams? Yes P/ No Not necessary for this project 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of flat roof? (Check applicable zone district for building height maximum) Yes No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned or installation including make and mo' = and Colorado Phase II certifications or Vase II EPA certification? a Yes No Not necessary for this project 18. Does the plan include a masonry fireplace including a fireplace sectio i4 indicating design to comply with the IBC or IRC? Yes No Not necessary for this project 19. Does the plan include a window schedule or other verification that' egress/rescue windows from sleeping rooms and/or basements comply with the requirei$nts of the IBC or IRC? Yes No Not necessary for this project 20. Does the Ian include a window schedule or other verification that windows provide natural ' t and ventilation for all habitable rooms? Yes No Not necessary for this project 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shosyer doors and tub enclosures and specify safety flaring for these areas? d/ Yes No Not necessary for this project 22. Do the plans include a complete design for all mechanical systems p)drned for installation in this building? Yes No Not necessary for this project ✓ 23. Have all in the building been accurately identified for the intended use? (Occupancy as identiin the IBC Chapter 3) Yes No Not necessary for this project 24. Does the plan indicate the quantity, form, use and storage of any materials that may be in use in this building? Yes No Not necessary for this project 25. ' Is the loca 'on of all natural and liquid petroleum gas furnaces, boilers and water heaters indicate on the plan? Yes No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four emp)6yees and both sexes are employed, facilities for both sexes? Yes ✓✓ No Not necessary for this project 27. Do the plan ndicate that restrooms and access to the building are handicapped accessib Yesf , No Not necessary for this project 28. Have two 2) complete sets of construction drawings been submitted with the appli a n? Yes No 29. Have you d, igned or had this plan designed while considering building and other construct' n code requirements? Yes No Not necessary for this project 30. Does the p accurately indicate what you intend to construct and what will receive a final ins on by the Garfield County Building Department? Yes No 31. Do your pl comply with all zoning rules and regulations in the County related to your zone dis ' t? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning esolution for setbacks. Yes No 32. Do you erstand that approval for design and/or construction changes are required prior to he implementation of these changes? Yes No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the ' e of application and that you will be required to pay the "Permit" fee as well as any " tic System" or "Road Impact" fees required, at the time you pick up your buildin permit? Yes No 34. Are you aware that you are required to call for all inspections required under the IBC including pproval on a final inspection prior to receiving a Certificate of Occupancy and occ pancy of the building? Yes No 5 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be .ven for an Agent and that the party responsible for the project must comply with the U form Codes? Yes No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. 37. Are you aware that requesting inspections on work that is not ready or not accessible will result ' a $50.00 re -inspection fee? Yes No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You ca ontact the Road & Bridge Department at 625-8601.(4 Yes No —/ 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician d Plumber to perform installations and hookups? The license number will be requir at time of inspection. Yes No 40. Are you aware that on the front of the building permit application you will need to fill in the Parcel/ edule Number for the lot you are applying for this permit on prior to submi the building permit application? Your attention in this is appreciated. Yes No 41. Do you know that the local fire d ct may require you to submit plans for their review of fire safety issues? Yes No (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? / Yes c/ I hereb knowledge that I have read, understand, and answered these questions to y Signature Phone:in 5/ 7 GZ(days); (evenings) Project Name: 47c My.- O f. 7< Project Address: 33? Note: Date If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Feb2005 7 No 1 UO175 gsiv Assessor's Parcel No 244c1- 2.24 -o2--oo Date 9 1512-00(4 BUILDING PERMIT CARD /B/' 1/ Job Address 3 3 9 5ca rrat .,, P'r htj+e ,L $ T1 Trocv lens 1-1-4 o3k1 anis Owner I'&C. E l roti 1 (-\-a✓lan AddressZi09 ScarruuJ A Ut Phone # M5 ° ' i Zla ContractorS*Gr' TreCc,St Address ISao 02 2-5911 1C1/ -k Phone # taint Setbacks: Front Rear RH LH Zoning Shop Int Soils Test Footing Foundation Grout Underground Plumbing Rough Plumbing Framing Insulation Roofing Drywall Gas Piping INSPECTIONS Weatherproofing Mechanical Electrical Rough (State) l 'cal�Final (State) ate) Fina Checklist Completed Certificate Occupancy # Date Septic System # Date Final Other /4a firea(/SflzAta 932 (continue on back) I INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS FOR INSPECTIONS BUILDING PERMIT GAR,�FIELD COUNTY, COLORADO Date Issuedp !' 6 6NQ Zoned Area Permit No.1 01 IC AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. use Skop ttrt1 tii �p Address or Legal Description 53 5 COJ r tva) l f `t , aysdtrgl Owner McElroy I I ktrian ContractorSiar stbarks Front Side Side Rear Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Fo&ing Driveway Foundation Underground Plumbing Insulation Rough Plumbing Drywall Chimney & Vent aaa� Electric Final (by State inspector) Gas Piping Final 9 /s OG /{�lic— Electric Rough (By State Inspector) Septic Final Framing (T include Roof in place and Windows and Doors instated). ote3. �� ��i2G ?% is ALL LISTED ITEMS MUST BE INSPECTED ANI) APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVEDDO NOT DESTROY THIS CARD Date G4 By/HiSA IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC