Loading...
HomeMy WebLinkAboutAs-built Report 11.27.2018DRAINAGE, UTILITY AND DITCH EASEMENT PER PLAT REC. NO. 544219 LOT 1 3.71AC.f ABSORPTION TRENCHES 14 EA INFILTRATRORS. .F. TOTAL AREA Waste Water Flow Reference: 5 CCR 1002-43 Section 43.6 Design Flow. 75 gpd/person No. Bedrooms: 3 No. people/bedroom 2 Total Daily Flow 450 gallons (Table 6-1) Percolation Data Percolation tests performed Oct. 13, 2018 No ground water within 8' of theround surface Average percolation rate = I 26.8 min/inch IMPORTANT NOTE: On site water was used in the percolation tests. Use of imported water (e.g, City of Glenwood Springs) for tests is invalid c produces erroneous results that do not represent actual percolation rates. Table 10-1 Soil Structure and LTAR LTAR = 0.5 Gal/Day/Square Foot Table 10-2 - Size adjustment for Application Method No reduction; gravity flow for a trench (chanter) Table 10-3 - Size ad ustment for distribution media Trench: reduce to 70% of calculated area REQUIRED TRENCH AREA 450 gpd / 0.5 gaVday/SF = 900 Table 10.3 reduction = 0.7 Net Required Trench Area: 630 S.F. Design Recommend Infiltrator brand or equal, low profile 34" wide 48" effective length S.F./Infiltrator 11.33 No. required: 55.6 Use 3 trenches 18.5 - Round to units each trench 19 Total # chambers: 57 Total length of each trench: 76 Feet Note: Clear distance between trenches 6 feet (measured adjacent sidewall to adjacent sidewall) DESIGN AND CONSTRUCTION NOTES: • Septic tank: 1,250 gallon. Install an effluent filter on the distribution end. • Infiltrator brand low profile chambers or equal. Adjust the following calculations if a different brand or size is used. • Net absorption trench area = 630 s.f • Designed for 3 bedroom home + auxiliary buildings (e.g„ shop) • Design flow = 450 gpd • Average percolation rate = 26.8 min/inch • Soils are deep sandy silty loam, continuous. No water table within 8' of the ground surface. LTAR = 0.5 gal/day/SF. • Each trench: 76 feet long x 34" wide (dig 36" wide). 19 chambers/trench are required. • Trenches shall be as level as possible. Plans show the trenches parallel with the contours. This is optional. • Install 6" diameter PVC inspection ports at each end of each trench. Cover with an irrigation box at grade. • Min. of 18" soil over top of chambers. • Lightly compact fill over top of chambers. Mound topsoil 6"-12" to allow settlement. • Field fit elevations to septic tank / house elevations. • Distribution lines: min. 4" diameter PVC • Use 1x3 distribution / splitter box (gravity) = aw4 V @ • Place splash blocks under inlets to minimize erosion •. d G, .G Uh ; COMPLIANCE NOTES •\.• • Offset to well = 207 feet ' // X/ " 24753 . 119 feet VON • Offset to nearest open ditch = INSTALLATION INSPECTED NOV. 28, 2018 BY / • 4 c �'_" • • • • • ° ` PAUL C. CURRIER, P.E. ALL ITEMS WERE/d INSTALLED IN CONFORMANCE WITH SPECIFICATIONS. A FIELD CHANGE WAS MADE TO USE 4 ROWS OF INFILTRATORS. NOV 2018 / 14MAR19 501-1.0 LOT 1 ISDS.DWO 'm CHKD : PCC