Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-03-19-5660 and SEPT -03-19-5661 HES 51 Road 223, LLC Commercial Office Building — Manufactured 51 County Road 223 — Rifle, Colorado 1) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES. 2) FACTORY -BUILT STRUCTURES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT STRUCTURES IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. C.D.O.H. INSTALLATION INSIGNIA SHALL BE AFFIXED PRIOR TO GARFIELD COUNTY'S FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 3) FOUNDATION, BUILDING EGRESS AND ALL RELATED SITE WORK SHALL COMPLY WITH 2015 INTERNATIONAL BUILDING CODE (I.B.C.) AND MANUFACTURER'S REQUIREMENTS. ALL WORK SHALL ALSO COMPLY WITH GARFIELD COUNTY'S "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS. 4) FACTORY -BUILT STRUCTURE IS APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION WITH OCCUPANCY GROUP "B" (BUSINESS) USE. 5) APPLICANT TO CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LETTER FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY. 6) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 2000 P.S.F. 7) EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS PER SECTION 1010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 8) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., CHAPTER 11 AND I.C.C. A117.1 - 2009. PROVIDE ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICES, INCLUDING LANDINGS, RAMP, RAILINGS, ETC. 9) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12. 10) RESTROOM SHALL COMPLY WITH ACCESSIBILITY REQUIREMENTS PER I.B.C, CHAPTER 11 AND I.C.C. A117.1 - 2009. PLUMBING PIPES WILL NEED TO BE FROST -PROTECTED AGAINST FREEZE - UPS IN THE AREA BETWEEN BOTTOM OF FLOOR STRUCTURE AND FINISH GRADE BELOW. 11) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY 12) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY.