Loading...
HomeMy WebLinkAboutSubsoil Study for Foundation Design 01.14.19H.P=KUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwood@kumarusa.com Geotechnical Engineering I Engineering Geologv Materials Testing I Environmental Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado January 14,2019 RECEIVED ÅPl? tl 3 ?Û1$Gruenefeldt Construction Attn: Dan Gruenefeldt P.O. Box 1910 Basalt, Colorado 81621 dan@gruenefeldt.com Project No.l8-7-752 Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot El8, Aspen Equestrian Estates,29 Equestrian Way, Garfield County, Colorado Dear Dan: As requested, H-P/Kumar performed a subsoil study for design of foundations at the subject site. The study was conducted in accordance with our agreement for geotechnical engineering services to you dated December 28,2018. The data obtained and our recofirmendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: The proposed residence will be a one to two story wood frame structure located on the site in the area of the pits as shown on Figure 1. Ground floor will be slab-on-grade. A monolithic slab foundation is being considered. Cut depths are expected to range between about l% to 3 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: The lot was vacant at the time of our site visit. The lot is flat, slopes slightly down to the south and is vegetated with grass and weeds. Eagle Valley Evaporite bedrock is exposed on the valley hillsides to the north and south. There was around 6 inches of snow cover at the time of our site visit. Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating five exploratory pits at the approximate locations shown on Figure 1. The logs of the pits are presented on Figure 2. The subsoils encountered, below about 8 inches of topsoil, consist of one GARFIELD COUNTY COMMUNITY DEVELOPMEITIT -2- to four feet of medium stifi sandy silty clay overlying relatively dense, silty sandy gavel with cobbles and small boulders down to the maximum depth explored, 5Yz feet. Free water was not encountered at the time of excavation and the upper subsoils were moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recoûrmend spread footings or a thickened edge slab foundation placed on the undisturbed natural clay soil designed for an allowable soil bearing pressure of 1,200 psf for support of the proposed residence. The clay soils tend to compress under load and there could be some post-construction foundation settlement. Footings or the thickened slab edge should be a minimum width of 18 inches for continuous walls and 2 feet for columns. Loose and disturbed subsoils encountered at the foundation bearing level within the excavation should be compacted or removed and the footing or thickened edge bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Shallower footings or thickened slab edges should be protected from frost with insulation in accordance with the International Residential Code. Continuous foundation walls (if any) should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 10 feet. Foundation walls acting as retaining structures (if any) should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 50 pcf for the on-site soil as backfill. Non-structural Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab-on-grade construction. To reduce the effects of some differential movernent, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath slabs to act as a break for capillary moisture rise. This material should consist of minus 2 inch aggregate with less than 50olo passing the No. 4 sieve and less than2o/o passing the No. 200 sieve. Project No.18-7-752 J All fill materials for support of floor slabs should be compacted to at least 95%o of maximum stan<lard Proctor density at a moisture content ncar optimum. Requirecl fill can consist of imported gravel such as road base devoid of vegetation, topsoil and oversized rock. Underdrain System: An underdrain should not be needed for the proposed slab at or above surrounding grade construction. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95o/t of the maximum standard Proctor density in pavement and slab areas and to at least 90o/o of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 6 inches in the first 10 feet in unpaved areas and a minimum slope of 2/zinches in the first 10 feet in pavement and walkway areas. 4) Roof downspouts and drains should discharge.well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 5 feet from the building. Consideration should be given to the use of xeriscape to limit potential wetting of soils below the foundation caused by irrigation. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Figure I and to the depths shown on Figure 2,the proposed type of construction, and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our Project No. 18-7-752 -4- findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory pits and variations in the subsutface conditions may not become evident until excavation is perfonned. If conditions encoutttered during construction appear difièrent from those described in this report, we should be notified at once so re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recofiìmendations, and to verify that the recoîrmendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. 'We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or if we may be of funher assistance, please let us know Respectfully Submitted, H-P*KUMAR James H. Parsons, E.I Reviewed by: Daniel E. Hardin, P JHP/kac attachments Figure 1 - Location of Exploratory Pits Figure 2 - Logs of Exploratory Pits Figure 3 - Legend and Notes 0t E 4 o(/,r /? L Project No. 18-7-752 llll-lrvcs SlnlxouddvoçtIIJJ 'IAcl:lælþu4tnaæ.ull þoqesâulPpa,oo¿\04æ6\s"@ctl@wotþllD6pl? '(t!ßn ,0tIãódcDd'çt¿ac[0/parr1¿oL't',l'1'uoJælw@soJuoÛo6lul?,çrnìn ,oto+.;-_8/,? 307I'\/JIl.-æI,./IIæ.æIæ@æI(I7ã'¿IæII@,0tr.-l--ltd¿oI--{ /'7---\Ig lrdtüd'.v 8çou bs oo¿'çzoIlldeql )ppqosL 6t4øtna,àã@5ì,oezættd .¿r'6r¡dvl tfì)læd-HSlId AUOIVUOIdX] JO NOIIVCOIzçL- L-8',l € I - PIT 1 EL. 6270' PII 2 EL. 6270' PIT 3 EL. 6270' 0 0 l--l¡ll¡ll! IIFÀl¡lô 5 5 t- UJ¡J lL IIt-IL UJô 10 10 PIT 4 EL. 6270' PIT 5 EL. 6270' 0 0 È- l,¡J l¡Jl¡ IIFfL l¿!ô 5 5 !-l¿ll¡ll! II t--fL¡Jo 10 10 18-7 -752 H-PVKUMAR LOGS OF EXPLORATORY PITS Fig. 2 ¡ I I LEGEND TOPSOIL; ROoT ZONE, SANDY SILTY CLAY, ORGANIC, MOIST, SOFT, DARK BROWN. CLAY (CL); SILTY, SANDY, MEDIUM STIFF, SLIGHTLY MOIST, BROWN. GRAVEL (GM-GP); SANDY, SLIGHTLY SILTY, WITH COBBLES AND SMALL BOULDERS, DENSE, MOIST, BROWN. NOTES 1. THE EXPLORATORY PITS WERE EXCAVATED WITH A BACKHOE ON JANUARY 2, 2019 2. THE LOCATIONS OF THE EXPLORATORY PITS WERE MEASURED APPROXIMATELY BY PACING FROM FEATURES SHOWN ON THE SITE PLAN PROVIDED. 3. THE ELEVATIONS OF THE EXPLORATORY PITS WERE OBTAINED BY INTERPOLATION BETWEEN CONTOURS ON THE SITE PLAN PROVIDED. 4. THE EXPLORATORY PIT LOCATIONS AND ELEVATIONS SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE IMPLIED BY THE METHOD USED. 5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL. 6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF DRILLING. PITS WERE BACKFILLED SUBSEQUENT TO SAMPLING. 18-7 -752 H-PVKUMAR LEGEND AND NOTES Fig. 3 I P e Äl