Loading...
HomeMy WebLinkAboutFoundation Inspection Report 07.30.2018uau�wan;�x<:xtrmo..xs.wcYrare�:.:.: :. :.r :::.�\`S.z. CAPSTONE ENTERPRISES WEST, LLC 618 PARTEE DRIVE GRAND JUNCTION, CO 81506 PHONE (970) 250-3331 martlnOcapstonewest.com Date: 7/30/2018 Job Number: 4142-02 Attention: Jim Dyke Jim Dyke Construction LLC jd50@icloud.com Subject: Construction Inspection 13100 CR 204 At the request of your agent, Capstone Enterprises West, LLC (Capstone) inspected the construction of the foundation pad at 13100 CR 204. The purpose of these inspections was to verify that the soils were as anticipated from the previous geotechnical reports and to insure that the subgrade and backfill were moisture conditioned and compacted as recommended The site was inspected as follows: Report 1 5/16/2018 PM Foundation excavated to subgrade and compacted The soils were as anticipated from the previous geotechnical investigations Testing showed good moisture and density Pad approved for backfill Report 2 5/21/2018 PM Pad brought to final grade Testing showed adequate moisture and good density Pad approved for concrete forms The preparation of the foundation pad at 13100 CR 204 meets the requirements for the construction of the residence. Capstone approves of the compaction. The soils at this site are suitable for a foundation designed for maximum bearing capacity of 6,000 psf. Respectfully Submitted Martin W. Chenoweth P.E. Capstone Enterprises West, LLC