HomeMy WebLinkAboutEngineer's Field Observation Report 04.23.2019KURTZ & ASSOCIATES, INCORPORATED 5012 County Road 154 Glenwood Springs, CO 81601 Structural Consultants Phone & Fax (303) 945-6305 FIELD OBSERVATION REPORT TO: Garfield County Building & Planning ATTN: Andrew Schwaller COPY TO: Calvin Lee THE FOLLOWING WAS OBSERVED: DATE: April 23, 2019 PROJECT: 730 Cactus Flats Road Garfield County, Co. OWNER: Calvin Lee CONTRACTOR: AJ Construction PRESENT AT SITE: 1. Brian Kurtz, Kurtz & Assoc., lnc. Brian Kurtz, P.E, of our office originally inspected the noted property on March 04, 2019. Subsequent to that inspection our office issued repair documents to address deficiencies in the crawl space framing. The residence is a single story wood framed structure constructed on a moderately sloping site. The residence is framed over a crawl space with continuous cast in place concrete footings and grade walls at its perimeter. The crawl space is constructed as four (4) benches and the main floor above the crawl space features three (3) interior floor steps. Each floor step is approximately 21". The floor is framed with four (4) primary post and beam lines and two (2) secondary beams. Three (3) of the four (4) primary° post and beam lines are located beneath floor steps. The primary post and beam lines utilized double 2x10 beams, and these beams had suffered severe twists. The beams had originally been used as footing form boards and consequently twisted as they lost moisture. Additional defects include: 1. Two (2) existing footings where the soil on the downhill side had sluffed off, 2. The post to beam connections were minimal nailed connections. 3. The beams were not mechanically attached at the beam pockets in the concrete walls. Our office issued construction repair documents dated March 11, 2019 and revised April 18, 2019. The primary purpose for the revision was to address Beam No. 2. The original documents allowed the contractor an option as to how to repair or replace this beam. The April 18 documents update the repair of Beam No. 2 as illustrated in Detail C/S1. The April 18 documents also corrected Beam No. 5: there is no Beam No. 5 as shown on the March 04 documents. As of the time of this inspection the crawl space framing repairs have been completed in a manner consistent with the intent of the noted construction documents. Prior to performing the inspection I reviewed photos of the formwork for the specified new footings and footing repairs of the existing footings. Footing reinforcement and footing sizes were constructed as specified. Note that given the nature of the work (i.c repair work in an existing crawl space) there are some variations from the details. However, I is my professional opinion that the repairs, as completed, are structurally adequate and significantly improve the structural strength and stability of the floor system.00 /Jct- ►te....... • .tit, : , `pF • : 21 2°11 ..•• fl�� �`7 0156TRAL 5116G7URAL MOLES VBERAL 51352.61151905. I. Design b based on th. 2015 .dltlon of the Intonational 1yyN0Yv coos r c.). 21D.slgl Ltw teed." a. ROO)_ _. _30 P5F (5140 EI. • 11009 Pbee TO P9' a. MO 4.0 1 s1+ Banc Kmtl Sp...4 5 ..eond 5544 IIS ,494 0lhlat. mq Spsissd shll 0Nassics., W :Wm as. Golan: an **5 hrd 4*401 10 11.011 tr ns -1H.4 =Janet ler *52411652624 4 pip.' TO aerob.4Man en PeMpatar. 4.1Iro 5.."4.41 strvvv01 8^di24ares end .9 5Rl[d4 sprees.. 1Y.. c.2-pl.l.d •lr5c2 * 1h. w,bacto .MIT pr*4I4 eh mark n.da..a.y to prnt.dt 60 .t.vntia and means adjaca t et.0r.Ww esu w1Rlea. SC,Genf . cal 0O*5 . ltpdr. r+db and nod). MO a..--1 reap ELEtr8al 64405 at e.y 54.1.5: +a a. 44(4" .Mw1 .1 Gist•r .. FMDAnORS " moi `Pa" Use ea m ......d rah pap. esu. Sall. ems pmeturrel to b. 40504552250.'*. -*4,151., dew ref prone to *010*4)• Cc.roa 61.41. L 2.150 Ko -Cs PE. ch KWj 1 A..ee+eb... Ins cow.. TM .. W I IPMatbn a~ 02178120.4 5.0cvlx 4 Assad. Va. Na. al.v ,*54.,.0 ths e.1511ea aaretn atica daayaost. Tor tin r..}.P.a.. 414 No 50lora 046421 of Kern 1 Awe., sac. Mae 5r *OWN fecisanoo n ro orient nos mend h• -•6.t 0l. •x60.+1 CONCRETE AND REINFORCING 5TEF1. I All 4*5*546e 0401 anon 510000 4104 04*4*5..*N. W.rt%h Whin 26 Gap. h... 1.11 Pe•N15d 501.211 (ASTM CEO) rib, 4 air saibab.s08 (.sot. a5g-.5ala La b. 2xrmlr .*2l 5 r tw} 2frierm en amt -n -p to -nails .54 n 66-F ran 1954 lite. 5F a bwA..o1 Goys feu Ebi:anyo• 60 S01-04. 6x44* 25400 oNMaba 414wtl.1rt a- raid Nonni, protean. pa, A41 505 a 386. S.R.Infarcing stool shall conform to ASTM 6,612. :4 end .malls, &red. 40 5 and !organ Grads 60 4.16•y.ICei r*485114q saroi shah w rhea. 44,511.0* 61 Ittpain3 bas a aerate at 12 tab newton, 0.411 epl1.s end prwl60g serer ba".- 41544*, and 1.tsllalbl W nobler1xg .tool .Mu C 41240 to.W 54. 5.Provld• aes.eealee nos.44ay to properly support r.hdo 01x5 at th• position. shaven en th. doeum.ste. STRUCTURAL MOOD FRAMING, A. DIMENSIONAL LUMBER 1541 tsps ao•6-atls, (11 II ed � WWIsaid** La Amerleon taint. e! Mb. ' f and 0W1wv1 O'.rlgn • �dbr•p1 1.vr.Yy tramp- .0.52110. 144r1teck Tr, u 0. 101iawf-q mum !Jon e"25h6 Jorot. and Rafters, .▪ 2 BAIT 4111 pdatio In cased Rrilthedwood cannote os maTr• foundttloi shall b. Foundation brads Redwood 0. P5.eeur. Tr.ot.d H ,-Sir *2 a 5.44.5, doelIyqnnat.d for "Above Csrourd" usage oe defined tr d1. Am.rlean blood Preserver. 4La.nlnot.d V.noor Lumber (LVL) 44011 be d..lgrod old tab-Mat.4 In aeeoronlu with the National r.e.aeh Board ed 1h. National 141• Amour r an 1 o-8. LVLb t b. lat" Wok with the E 7 = 2600 PSI, Fv = 255 P51, 04120 '5. 5129 pass to b. Spruce -Ping -FM No. 1 or honor B FASTENERS AND CONNECTORS I.HI taster nanny ash aear.ctxw 11011 ereTor.,, ev NEG ad Ain,, Rif.r55fe IBC 41444. %e. 2566.5J Fafunsoy 5e1.4b8, 2.58401 c.nrat0re Oar ..pad Nanny ons nx.*ecbx.• by 010. 9.41.04 Ts Calvary. wrreter..adl 2191. 111041 ee11.21. w 50 eta x 140", I0d x 16", 168 x 215", alien noted chainsle.. 5.0.1I.5nx. woman:in and Pae.a.y eo CMM gond thaw, 1.4146 Nov. ILL. pit 46504* sae4 b• wet datn appraisal ty taro 4Loy ans. nc-o.11tghalts., punt holes, oat an. sodrt 2atbpail wows, t2 LIPS. PROADE 635 FRAMING ARCH IdE14 POCKET' 54OST. (2)-2410 BM TA. GONG EXI5TINS SHIMS ei BEAM POCKET FIT 2x4 TIGHT TO EXIST BM PROVIDE (2)-2x4 PRESSURE TREATED (FLAT) • FACE OF GONG - ATTACH W/ 9/64" 610. POWDER DRIVEN FASTENERS • 6" O.G. (STAGGER) NSTALL SUPPORT • 561 POCKET AFTER E4 HAS E1554 81RA164411ED t RE -LEVELED, TYP CONCRETE FOOTING SCHEDULE TYPE SIZE RENIARK5 OA 2'-0" Gla EXISTING 0 2'-0" Gla EXISTING, TO 5E REINFORCED- SEE 5/51 © 6" x 2'-0" x 2'-0" PROVIDE PTS. REPLACE E1CI5Tlk6 CONCRETE ER-OCK REIN? W/ (16)-04 MID -NT EA IMAM O 6" x 2'-0" x 2'-0" PROVIDE FT5. REINF i-/ (3]- .t4 MID -+4T. EA WAY POST SCHEDULE TYPE DESCRIPTION OA EXISTING (2)-2x6 (5.. 5/51) ®REPLACE EXISTING POST- PROVIDE 4544 TIMBER POST W/ POST GAP 4 POST BASE PER D/51 O PROVIDE 454 TIMBER POST • NEW FTE, W/ POST GAP 4 POST BASE PER D/51 0 REPLACE EXISTING TJI POST' W/ (2)-2544 (5e. A/51) 1• = 1'-0• T.O. POW) MASTER BATH EXISTING TJI 514* 1 `E1 `sem +Il PROVIDE LPC -4Z 1140' POST GAPEA. SIDEEXISTING (2)-2x10 BM PROVIDE BRACESREINF W/ N- 1.5/4" x POST- SEE B519,1/4" LVL I KITG44EN 1 PACK -OUT W®0 BLK'6 W/ 5/8" PLSSC PROVIDE 2x10 SLK'5 • ALTERNATE JOIST SPACES- no PACES END NAIL EA END W/ (2)-I6d r �I� E1p5r.,YYTJ �f���/� (2)OJIDE 2x6 x 5'd MIN A94 - rep RATE- ATTACH TO 646112- rep ('J) 5/ 541 TJI4 W (2)-118x3'WOOD PROVIDE 'PG -4Z PLTIBVS Rat TJI T GAP �� Q PROVIDE 2x4 4. SIDE WEAR SIDE POST PROVIDE 2x41,_,..." 56)-65 2x4 W/ FAR SIDE POST �L (5)_ ng x 3" W000 5CRE" m ▪ (2% Jlda t1 dm.. +TA. PLYWD I6d TOE -NAIL •6'00. P4 41 0E AO24L COT -4. (6" 441)4(SEE FM GCNEOLLE) PROVIDE (2)- 44 5PDXY' DWL'e • EXIST FT5 (2)-1*4 TOP i BOT 0O'G 666 ENI5T POST e.,55 - NAIL TO POST REMOVE LOOSE SOILS - BEAR FTS ON UNDISTURBED NATURAL 501L5 1• = TA. PLYWD • PROVIDE 5/16" 410 x 4" T14- I OK WRENS • 12" OL TOP L BOT A\ BEAM NO. 2 PROVIDE 5x6 TINIER POSTS I• = I'-0• PROVIDE 2x10 BLK'G- SEE 5/5I E)UST.4v2' -4 PROVIDE ! �I a POST CAP EA �� PROVIDE 4.4 AC -4 PROVIDE BRACE • POST- SEE 0/51 i TO. 4.`20 B TREATED TIMBER POST (PROVIDE TEMPORARY SNORING t REPLACE 1 EXISTING POST) 3111-' 11ItI CLING P7.5 PROVIDE (2) RETROFIT POST BASES, RPBZ (MFR. 51MP50N STRONG TIE)- ATTACH TO LONG NV (4)-1.1/4" d1a. x 1.5/4" 5E1_6 TAPPING MASONRY SCREWS (TITER SCREWS) 1• . 1,-0• KURTZ 4 ASSOCIATES, INC. 5012 COUNTY RD. 154 GLENWOOD SPRINGS, COLORADO (9-(0) 945-5505 RESIDENCE AT 0750 CACTUS FLATS ROAD GARFIELD COUNTY, COLORADO DRAWN 5Y: CHECKED BY: B.J,K. SCALE: AS SHOWN PROJECT 4: I9-01-15 DATE: CONSTRUCTION SET: 03/1 I/2019 0 REVISED: 04/15/2019 SHEET TITLE: GENERAL NOTES 1 DETAILS SHEET. 9 53'-0• r 20'.0• 26'$' 12'-0' 4°-e , 14'-6' S 1{ , BEOROON1 WIPO (2)-2x10- See B/51 MASTER BEDROOM f F LIVINS 3 (2)-2x10 r 2x10 SCABS NV SLIGHT TWIST - TEMPORARILY 51-10RE FLOOR ! RE -LEVEL FLOOR 4 BEAM 4 (2)-2x10- See C/51 5 (2)-2x10- See D/51 re x 3'-0' NIGH CONCRETE WALL - TYPICAL ALL AROUND I- 7 I r k — J 1 4,U2' TJI • 1 16" O.G. - TYP 1 DECK I�u__TJ_J 1 -7� r L_J }n TOPLYWD TOPOri rJI 1 JJ1 }-®----1 . PLYINS. g` n 41 + 0 - I =' 1- J T IOoO'-0. ` IOi'-T�IIa• L— — �9! L J .-5 I16O.-TP �L-- �LEVEL r r 7 ri-.. 1'i ! m } - - - -� "LaaR I —1 "LOOK Lw G0 N --_-� _ a J r 1 1 L -X I 1_-- I ENTRY 1 LHI L — —R .... J • 6L4' 26'x•, 6-4" QNOTE: BEAM LINE NOT R$Q0 24'-0• / 32-8"i 50'-4• FOUNDATION 4 MAIN FLOOR FRAMING PLAN I/4' • IWO* EXISTING FLOOR BEAM SCHEDULE BM NO. DESCRIPTION 1 (2)-2x10- See B/51 (2)-2x10 W/ SEVERE TWIST- 2 TEMPOR R.ILY SHORE FLOOR ! RE -LEVEL FLOOR a BEAM. IT 15 LIKELY THAT BEAM WILL REQUIRE REPLACEMENT 3 (2)-2x10 r 2x10 SCABS NV SLIGHT TWIST - TEMPORARILY 51-10RE FLOOR ! RE -LEVEL FLOOR 4 BEAM 4 (2)-2x10- See C/51 5 (2)-2x10- See D/51 FOUNDATION AND MAIN FLOOR PR4MIN5 PLAN NOTES: 1. Concrete Foundation waII0 to be B" thick unless noted otherwise (U.NOJ 2. Dimensions this sheet are to Pace of concrete UN O. 3. 4 denotes step In top of wall 4. 0 designates Footing type See Footing Schedule sheet 5-1. 5. New Footings Qe to bear on undisturbed natural bearing soils or compacted structural fill. 6. Combustor to provide adequate foundation ventilation In crawl spas. es raqut-ed py IRC or Install humidbtat controlled vent Pan.. T. L T floor Joist (showing Joist span direction). 6. Existing floor _piste are 9.1/2' TJI/210 unless noted otherwise (U NO). IED PLAN NORTH 9 Ir J I[ c Joist hanger or beam to beam connection. 10 ■ designates post which supports framing this level. Post schedule, see sheet 5-1. II TJI deslgnctes framing members manufactured by True -Janet Corp. or appravea equal. 12. LVL = Laminated Veneer Lumber Soo Structural General Not.. for allowable stresses. LVLN shall be 144" thick. 13. A '" vertical step In floor framing. KJRTZ ASSOC. I ATES, INC. 5012 COUNTY RD. 154 GLENWOOD SPRINGS, COLORADO (970) 945-6305 RESIDENCE AT 0730 CACTUS FLATS ROAD GARFIELD COUNTY, COLORADO rDRAWN BY: J.L.G. CHECKED BY: B.J.K. SCALE: AS SHOWN PROJECT t<: Iq-01.15 DATE: CONSTRUCTION SET: 03/11/2019 REVISED: 04/18/2019 SHEET TITLE: FOUNDATION d MAIN FLOOR FRAMING PLAN SHEET: S=2