HomeMy WebLinkAbout03. Phasing PlanPHASE
ROADS, SEWER, WATER IN PHASE
CR 125 DRY PARK ROAD
SPRING VIEW DRIVE
HIGH POINT DRIVE
SOPRIS WAY
HIDDEN VALLEY DRIVE TO
SOPRIS WAY AND TO LOT 43
WATER TANK ROAD & DRIVEWAY TO LOTS 5 & 6
ELK RIDGE DRIVE
SEWER LINE IN A
NEW WATER TANK
NEW WELL
SERVICE TO LOTS 1-29 & 44-48
DRIVEWAYS TO LOTS
1, 2, 3, 4
SEWER LINE IN D
SERVICE TO LOTS 1-6
HIDDEN VALLEY DRIVE FROM
LOT 43 TO LOT 50
SEWER LINE IN B
SERVICE TO LOTS 30-43 & 49-61
IV
HIDDEN VALLEY DRIVE FROM
LOT 50 TO ELK RIDGE DRIVE
SEWER LINE IN C
SERVICE TO LOTS 62-81
400
0
200
GRAPHIC SCALE
400
500
1800
24040\PUD—FinalPlan\Cover Phase.DWG
( D1 FEET )
1 inch = 400 ft.
APPROVED
FOR
CONSTRUCTI❑N
D
6/3/05
REVISED PHASING — IV BECOMES II
RTM
C
5/12/05
GARFIELD COUNTY COMMENTS
RTM
NO.
DATE
REVISION
BY
SOPRIS ENGINEERING, LLC.
MIL CONSULTANTS
502 MAIN STREET. SUITE A3
CARBONDALE, COLORADO 81623
(970) 704-0311
GARFIELD COUNTY
SPRINGRID GE RESERVE
PUD
PHASING PLAN
FOUR PHASES
DES. RTM
CK. YTN
DR. RTM DATE 6/23/04
FILE NO.
24040.01
SHEET 3
OF 85
PHASE
LOTS IN PHASE
COMMENCEMENT
COMPLETION
SYMBOL
7-29 & 44-48
(TOTAL 28)
12 MONTHS AFTER
FINAL PLAT
WITHIN 12 MONTHS
OF COMMENCEMENT
♦♦rr♦
II(TOTAL
1-6
6)
NO LATER THAN 36 MONTHS
AFTER COMPLETION OF PHASE A
WITHIN 12 MONTHS
OF COMMENCEMENT
III
30-43 & 49-61
(TOTAL 27)
NO LATER THAN 36 MONTHS
AFTER COMPLETION OF PHASE B
WITHIN 12 MONTHS
OF COMMENCEMENT
/
//
/
IV
62-81
(TOTAL 20)
12 MONTHS AFTER COMPLETION
OF PHASE C
WITHIN 12 MONTHS
OF COMMENCEMENT
PHASE
ROADS, SEWER, WATER IN PHASE
CR 125 DRY PARK ROAD
SPRING VIEW DRIVE
HIGH POINT DRIVE
SOPRIS WAY
HIDDEN VALLEY DRIVE TO
SOPRIS WAY AND TO LOT 43
WATER TANK ROAD & DRIVEWAY TO LOTS 5 & 6
ELK RIDGE DRIVE
SEWER LINE IN A
NEW WATER TANK
NEW WELL
SERVICE TO LOTS 1-29 & 44-48
DRIVEWAYS TO LOTS
1, 2, 3, 4
SEWER LINE IN D
SERVICE TO LOTS 1-6
HIDDEN VALLEY DRIVE FROM
LOT 43 TO LOT 50
SEWER LINE IN B
SERVICE TO LOTS 30-43 & 49-61
IV
HIDDEN VALLEY DRIVE FROM
LOT 50 TO ELK RIDGE DRIVE
SEWER LINE IN C
SERVICE TO LOTS 62-81
400
0
200
GRAPHIC SCALE
400
500
1800
24040\PUD—FinalPlan\Cover Phase.DWG
( D1 FEET )
1 inch = 400 ft.
APPROVED
FOR
CONSTRUCTI❑N
D
6/3/05
REVISED PHASING — IV BECOMES II
RTM
C
5/12/05
GARFIELD COUNTY COMMENTS
RTM
NO.
DATE
REVISION
BY
SOPRIS ENGINEERING, LLC.
MIL CONSULTANTS
502 MAIN STREET. SUITE A3
CARBONDALE, COLORADO 81623
(970) 704-0311
GARFIELD COUNTY
SPRINGRID GE RESERVE
PUD
PHASING PLAN
FOUR PHASES
DES. RTM
CK. YTN
DR. RTM DATE 6/23/04
FILE NO.
24040.01
SHEET 3
OF 85