Loading...
HomeMy WebLinkAboutSite PlanI I I I I I I r, 1 PROJECT BENCHMARK ELEVATION = 6105.4' I 315001 / _28643 / / / _4 / c 3 / 4. v / O N / / 2`W /° \ / 8 20UTILITY EASEMENTAT PER PL V / I' #EX:6113.5'± i ASPHALT DRIVEWAY PROPOSED ASPHALT 20' PRIVATE ACCESS/DRIVEWAY EASEMENT BENEFITING LOTS 20 & 21 REC. NO. 659582 (BOOK 1621 PAGE 175) Lol UNE 1�PI-ct3-)'. z 1 ono( (PERPLAT1\— . N 79°04'17" +EX:6122.51_ — FL:6120.48' �<----- 1419° 04' 1rE — - FL'6118 21' „<C< 6110 OA:6118. L:6119.481 2.0% 6179 3 STEPS DOWN 4 STEPS DOWN FL:6128' 4,FG:6 . 1.23' 1 FG:6121.85' q15� 4 -FG: 121.35 FG:612.75' TOC61122.25' � 1 ^ CONCRETE PATIO. 1 3—� F +HP:6121.24' 1 \v CONCRETE ENTRY R20.00 —6107 611 roc:6122.3s' PROPOSED RESIDENCE LOT 20 -FOUR MILE RANCH MAIN FF=6122.37' (ARCH 100'-01 REFER TO BUILDING PLANS. TOC:6122.25' FG:6121.75' ) IW N(� tEX:6124.81t ) ) 1 ralci 4EX:6124.6't }FG:. 21.20' 6120.80 0 80A:6118.00' - 18 LF. 2.5' TALL BOULDER WALL. F6:6124.87' STEPS DOWN TO GARAGE RE: BUILDING PLANS I vI 72, 1 FL 6120.6 I FG:6 17.40 GARAGE TOC=6118.00' REFER TO BUIILDING PLANS. ILDIN ENVELOPE PER PLAT 579° (Ail!" FG:6117.40' 10' CUT / FILL CALCULATION CUT = -432 C.Y. FILL= 189 C.Y. NET= -243 C.Y. FILL CUT / FILL NOTES: 1. CUT / FILL QUANTITIES ARE APPROXIMATE FOR INFORMATION ONLY, THE CALCULATION USES ASSUMPTIONS FOR DRIVEWAY SURFACE, CONCRETE SLAB THICKNESS, GRAVEL SUB BASE THICKNESS, AND STRUCTURAL FOUNDATION. THE CALCULATION ALSO ASSUMES ONSITE MATERIAL WILL BE USED AS FILL UNDER SLABS WHERE NECESSARY. CONTRACTOR IS RESPONSIBLE TO ESTIMATE ALL QUANTITIES PRIOR TO CONSTRUCTION. 2. NO CUT / FILL EXPANSION FACTORS HAVE BEEN ASSUMED. STg 44' 3q"W s 78G44137 VY 28.51 L 17.40' _- 6117 6 J FL•6115.50' N0+ LOT LINE ITIP(/ F16116 -f- b2.< 610 1 GENERAL CONSTRUCTION NOTES: THE EXISTING CONTOUR INTERVAL IS ONE (1) FOOT (DASHED). EXISTING CONDITIONS ARE BASED ON AN IMPROVEMENT SURVEY PERFORMED BY SOPRIS ENGINEERING, LLC. 2. ALL EXISTING UTILITIES EITHER UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGE TO, OR INTERRUPTION OF SERVICES CAUSED BY THE CONSTRUCTION. 3. THE CONTRACTOR SHALL HAVE A SET OF APPROVED CONSTRUCTION DOCUMENTS ON SITE AT ALL TIMES. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. 5. NOTIFY UTILITY OWNERS: CONTRACTOR SHALL NOTIFY ALL PUBLIC OR PRIVATE UTILITY OWNERS FORTY-EIGHT HOURS (OR AS REQUIRED BY UTILITY COMPANIES) PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY. 6. ENSURE THAT DRAINAGE IS AWAY FROM ALL STRUCTURES IN ALL DIRECTIONS A MINIMUM OF 12" IN THE FIRST 10' OR 3" IN THE FIRST 10' IN PAVED OR CONCRETE AREAS. 7. ALL GEOTECHNICAL RECOMMENDATIONS MUST BE ADHERED TO. 30 SETBACK(TYP.) PER PLAT GRAPHIC SCALE 10 20 3>r44— RIDGELINE PER PLAT 40 SPOT ELEVATION LEGEND FF = FINISHED FLOOR ELEVATION FG = FINISHED GRADE Fl = FLOW LINE HP = HIGH POINT LP = LOW POINT EX = MATCH EXISTING EOA = EDGE OF DRIVEWAY GB = GRADE BREAK DRAINAGE DIRECTION/SLOPE 2.09‘ SPOT ELEVATION ( IN FEET ) 1 inch = 10 ft. PROPOSED LEGEND 7900 > > > > -E134—FG:6360.00' PROPOSED CONTOUR PROPOSED CONTOUR INTERVAL PROPOSED SWALE OR DITCH PROPOSED STORM SEWER PROPOSED ASPHALT PROPOSED CONCRETE/SIDEWALK EXISTING LEGEND EXISTING CONTOUR EXISTING CONTOUR INTERVAL EXISTING PROPERTY LINE ---- EXISTING SETBACK (XX') EXISTING EASEMENT 0 0 LIMITS OF 40% — SLOPE PER PLAT 0 0 0 0 v Know what's below. Call before you dig. CALL 2—BUSINESS DAYS IN ADVANCE BEFORE YOU DIG GRADE, OR EXCAVATE FOR 7HE MARKING OF UNDERGROUND MEMBER UTIU71E5 S OPRIS ENGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, C081623 (970)704-0311 FAX' (970}7040313 DESIGNED BY JPP DRAWN BY JPP CHECKED BY YTN DATE: 05-28-2019 JOB NO. 18199 O U fY Z O O w U LL O O Li_ U 0 CI CNI I— w J r� V BUILDING PERMIT DATE REVISION TITLE GRADING & DRAINAGE PLAN DRAWING NO. C-1.0