Loading...
HomeMy WebLinkAboutEarthwork Compaction Testing ReportLol- 6 3 Depth or Elev. Field Dry Density (pcÐ Test No. Location Field Moisture Content o/o Field Comp ("/ù Min. Comp Req. (o/o) Proctor Lab No, I 15'west of northeast corner footing grade 107.0 13.1 100 98 029-r I l0' west of east end of south wall 105.r 13.5 029-18 Lab No.Description 2 98 98 Method e footing Max. Dry Dens. opt. Moist. o2g-148 ASTM D 698 Siltv Glay 107.6 15.0 H.P*IruMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax (970) 945-8454 Email: hpkolenwood(@kumarusa.com Geolechnical Ëngineering i Ëngineerlng Geolcgy ivlaleriâls Têsting I Êirvironnrental Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado Earthwork Compact¡on Testing Report Client: Integrated Mountain Development, Inc. Project No.: 'l7-7-389.4 Day: Thursday Attn: Jim Gornick Date: 5110118 P.O. Box 908 Page: I of 1 Glenwood Springs, Golorado 81602 project: 3f,5åi"j Residence, Lot 63, Filing 2, Pinyon Mesa, Paintbrush Way, Garfield County, Weather: Clear, light wind, dry Temperature:66o at l0:00 am Earthwork Contractor: Equipment Used: Description of Earthwork Tested: Sample(s) Obtained: Verbal Communication: trackhoe We performed compaction testing under gerage footing areas. Test results indicated satisfactory compactoin at near optimum moisture content. Leonard with lntegrated Mountain Development was informed of results. Placement and Compaction Procedure: Not observed by H-P/Kumar Lift Thickness: Max. Rock Size Compactor(s) Used: walk behind compactor Moisture Conditioning: Number of Passes Nuclear e Moisture/Dens Test Results Proctor Reference COMPACTIVE EFFORT AND MOISTURE TO FILL D URING THE TIMES WHEN OUR OBSERVER ts OBSERVING OPERATIONS. THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE wlTH ASTÍ\4 D 6938. Distribution: Integrated Mountain Development, lnc. - Jim Gornick (iim.qornick@inteoratedmtn.com) =lustin rQrgill Steven L. Pawlak, P.E. /kac Field Technician Reviewed By