HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-06-19-5782 and SEPT -06-19-5783
Event Scaffold Services, Inc.
Commercial Office Building
28485 Highway 6 & 24 — Rifle, Colorado
Big R Commercial Park, Lot 9
1) ALL WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND 2009 I.E.C.C.,
AS WELL AS MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE-
MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES.
3) ALL WORK MUST COMPLY WITH GARFIELD COUNTY'S "COMMERCIAL GENERAL" ZONE DISTRICT
REGULATIONS AND MUST COMPLY WITH ALL REQUIREMENTS AS STATED ON THE FINAL PLAT.
4) STRUCTURE IS APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION WITH OCCUPANCY
GROUP "B" OCCUPANCY (BUSINESS/OFFICE).
5) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO PROFESSIONAL LICENSED
SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY COMPLIANCE WITH ALL
SETBACKS.
6) APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING
FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL
LETTER FROM FIRE DISTRICT IS REQUIRED AT FRAME INSPECTION AND PRIOR TO FINAL
BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
7) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 1000 P.S.F.
8) EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS
PER SECTION 1010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS
PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.
9) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., CHAPTER 11 AND I.C.C. A117.1-2009. PROVIDE
ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICES, INCLUDING
LANDINGS, RAMP, RAILINGS, ETC.
10) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12.
11) RESTROOM FACILITIES ARE REQUIRED IN THIS NEW OFFICE BUILDING, INCLUDING A LAVATORY
AND WATER CLOSET. ACCESSIBLE RESTROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS
PER I.B.C, CHAPTER 11 AND I.C.C. A117.1 - 2009 INCLUDING 36" WIDE DOOR & 60" DIAMETER
TURN RADIUS INSIDE RESTROOM.
12) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) SHALL BE DESIGNED AND INSPECTED BY
A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. DESIGN TO COMPLY WITH
O.W.T.S. REGULATIONS INCLUDING REQUIRED SETBACK DISTANCE FROM THE WELL. PROVIDE
ENGINEER'S FINAL O.W.T.S. REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
13) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL
ELECTRICAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.