Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-06-19-5782 and SEPT -06-19-5783 Event Scaffold Services, Inc. Commercial Office Building 28485 Highway 6 & 24 — Rifle, Colorado Big R Commercial Park, Lot 9 1) ALL WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND 2009 I.E.C.C., AS WELL AS MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES. 3) ALL WORK MUST COMPLY WITH GARFIELD COUNTY'S "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS AND MUST COMPLY WITH ALL REQUIREMENTS AS STATED ON THE FINAL PLAT. 4) STRUCTURE IS APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION WITH OCCUPANCY GROUP "B" OCCUPANCY (BUSINESS/OFFICE). 5) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY COMPLIANCE WITH ALL SETBACKS. 6) APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LETTER FROM FIRE DISTRICT IS REQUIRED AT FRAME INSPECTION AND PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 1000 P.S.F. 8) EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS PER SECTION 1010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 9) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., CHAPTER 11 AND I.C.C. A117.1-2009. PROVIDE ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICES, INCLUDING LANDINGS, RAMP, RAILINGS, ETC. 10) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12. 11) RESTROOM FACILITIES ARE REQUIRED IN THIS NEW OFFICE BUILDING, INCLUDING A LAVATORY AND WATER CLOSET. ACCESSIBLE RESTROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS PER I.B.C, CHAPTER 11 AND I.C.C. A117.1 - 2009 INCLUDING 36" WIDE DOOR & 60" DIAMETER TURN RADIUS INSIDE RESTROOM. 12) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) SHALL BE DESIGNED AND INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. DESIGN TO COMPLY WITH O.W.T.S. REGULATIONS INCLUDING REQUIRED SETBACK DISTANCE FROM THE WELL. PROVIDE ENGINEER'S FINAL O.W.T.S. REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 13) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL ELECTRICAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.