Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-06-19-5799 and SEPT -06-19-5800 CMH Homes, Inc. New Manufactured Home TBD Sec03, TO8S, R96W — Parachute, Colorado Knox Public/County Road Split Exemption — Lot 2 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 3) FOUNDATION, CRAWL SPACE & SITE WORK SHALL COMPLY WITH 2015 I.R.C., 2009 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) MUST BE DESIGNED BY A COLORADO LICENSED PROFESSIONAL ENGINEER. PROVIDE A COPY OF O.W.T.S. DESIGN AT JOB SITE FOR INSPECTOR REVIEW, AND PROVIDE ENGINEER'S FINAL INSTALLATION REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) ELECTRICAL PERMITTING AND INSPECTIONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION C. SEPTIC SYSTEM D. PLUMBING/GAS E. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* * NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.