HomeMy WebLinkAboutApplicationGørfield County
, RgÇElVf,f,pqmmunitv Development Department
108 8th Street, Suite 401
t.i[iT,å ¡: ¿T ?t]ltl Glenwood springs, co 81601
**fl'-VlS'tY'tN'"':J,T1"';
"'l'*ofcoNsTnucnoN
Com
Manufactured Home or Multi-Level)
PARNES
Demolition
Reroof
Propefi Owner:
Mailing Address:
f "ut,(tt Phone: t4l8l t løtol-bLqç
ü t5t
Email Address:ßi..t Av Ímot P- hú- , fa¡4
Manufactured Home lnstaller;L
Mailing Address:0 Òte
Phone:tZnl t K5\- *t-bb
8ûç --gt a
Email Address:ea.Êr w-Å,e p- uritl 'l " ¿orn5t.0
Email Address:
Phone:(Contractor:
Mailing Address
Phone:
Phone: I )Engineer:
Mailing Address:
Email Address:
Architect:
Mailing Address:
Email Address:
FRO¡ECTDETAIIS
Ðescribe Work:Pun-t lillvqu'r ØÑ9rÈucnup î',(Lf+trÉI¿ fuL-ute M
æ fiD LfttJÐ U5V rtt:oe ?6nnv t n-
Job Address:(A
Assessor's Parcel Number:
Sub-Lot Block
5q. Ft. of Building:)7..{Height:nt qü *of
Class of Work:New Repair ¡
I
L
owne/s vatuation of work: StlUal no f{'lJf tl t Property size (5q. Ft. or Acres): \5rZOt M*ø
Garage:inÀ
I
ttached
Alteration Addition
fl o*[.ched
Move/Relocation
PRO¡ECT OETÆls CO¡¡TINU ED
septic: flowrs : f] community
Type of Heat:Natural Gas Propane Electric Other
Driveway Permit:Exempt Permit #:
Authoritv. This application for a Building Perm¡t must be
or an authorized agent. lf the signature below is not that
the Owner, must be provided with this Applicatìon'
signed by the Owner of the property, described above,
of the Owner, a separate letter of authority, signed by
Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Divisíon'
Other perm¡ts. Multiple separâte permits may be required: (U State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit'
Void permit. A Euilding Permit becomes null and void if the work authorized Ís not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
i CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certífication as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Build¡ng Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: {1)
requiring the correction of errors in the submittals, if any, discovered after issuance; ar 12) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of th¡s Applicatìon, includìng submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
díscrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
and/ or builder
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provitieci the requireci information which is correct anri accurate to the best oi my knowiecige.
f¿-U- tq
Property Owner Print sien (þg ¡¡Date
BUILDING / PLANNING DIVISION :lzllz^'<
Signed Approval
*I
OFFICIAT USE ONIY
Special Conditions:
Ç* a/ttr,¿4ù livl o(
Permit Fee:q ut.2b Manu home Fee:
4oo.oo
uisc rees:¡[rA,Plan Check Fee:412.çtAdiusted Valuat¡on:
+4pH.00
owrs[rrp: Íl,fj$hrylF ¡l,*zzvBalance Due;+tø,øt¿BP No:
6fco- 5877
Fees Paid
4oo .oo
Total Fees:qw?.bb
ConstType: V.Þ Zoning:ROCC Groun: ,Setbacks:
F/R* 2b,9"lo
PD.æ)D?,n
Date
Gørfteld County
BUILDING DEPARIMENT
108 Eighth Street, Su¡te 40L, Glenwood Springs, CO 87607
Tel: (970) 945-8272
PLAN RE V IEW CHECKLIST
permit No: WØ- 0b-14-%Zg
Building lssues Planning/Zoning lssues
VE
'/ Attach conditions
x
Application Signed
Plan Reviewer to Sign APPlication
Parcel/Schedule No.
40# Snowload Letter - Manu. Homes
Soils Report
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ TopograPhY 3Q%o ^ , I
,'-Øfutttt*taatt
Attach Rcsidelráa} Plan Review List
Subdivision Plat Notes
Fire Department Review
Valuation Determ¡nation/ Fees
Red Line Plans/ Stamps/ Sticker
NIA
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
Building Height
Zoning Sign-Off
Road lmpact Fees
'/ Grade/ Topography 40%
Planning lssues
N/A
NAx
N
Subdivision Plat
General mments:
Àffir. Arr,û-: 6x?4= 27Ô *-
FOÐ ltnpr,rÅ F.(Lt N/A,
(< t¡ooo 9F - *àp vynniwt4gt\
Ye* o( ctuqtw"vt6on' v-b
O"^,¡^a.¿ /øs'a^ È (vurìr*ù
xlalvwltou
ailþl %^&' 22bx QlØ. ^ q4¡tu.oo
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by a person having written authority from the
owner to act as their representative.
I hereby acknowledge I have read, understand, and will abide with the requirements of this
checklist.
lo'at-t4
Property Owner Print Sign (at ,1\Date