Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-06-L9-s823 Crystal Ranch Corporation, LLC / Rocky Mountain Stone Yard Manufactured Commercial Office Building 87 County Road 103 - Carbondale, Colorado 1) REFER TO pLAN ATTACHMENTS FOR GARFIELD COUNW',S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES. 2) FACTORY-BUtLT STRUCTURES ARE REGULATED & TNSPECTED BY COLORADO DEPT. OF HOUSING (c.D.o.H.) AND ALL FACTORy-BUtLT STRUCTURES lN GARFTELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. C.D.O.H. INSTALLATION INSIGNIA SHALL BE AFFIXED PRIOR TO GARFIELD COUNTY'S FINAL BUILDING INSPECTION & CERTI FICATE OF OCCU PANCY. 3) WORK SHALL COMply W|TH REQUTREMENTS OF LAND USE CHANGE PERMIT (GAPA-01-19-87O41 INCLUDING PROVISION OF HANDICAP ACCESSIBLE PORTABLE TOILETS WITH HAND-WASHING STATION AND s-GALLON MINIMUM SIZED TANK FOR ON-SITE STORAGE OF POTABLE WATER. THESE TEMPORARY ARRANGEMENTS FOR WATER & WASTEWATER EXPIRE AFTER A 3-YEAR PERIOD, AND PERMANENT ARRANGEMENTS FOR THESE SERVICES MUST BE IN PLACE PRIOR TO EXPIRATION OF TEMPORARY SERVICES. 4l FACTORY-BUtLT STRUCTURE tS APPROVED AS NON-SPRINKLERED, TYPE V-B CONSTRUCTION wtTH occupANcy GRoup "8" (BUS|NESS/OFF|CE). FOUNDATION, BUILDING EGRESS & ACCESSIBILITY, AND SITE WORK SHALL COMPLY WITH 201.5 INTERNATIONAL BUILDING CODE (r.B.c.) AND MANUFACTURER'S REQUIREMENTS. 5) A LOT TMPROVEMENT CERT|FTCATE, SEALED BY A COLORADO LTCENSED SURVEYOR, lS REQUIRED TO VERIFY THAT SITE PLACEMENT OF FACTORY-BUILT MODULAR OFFICE BUILDING COMPLIES WITH SETBACK REQUIREMENTS - MORE SPECIFICALLY, ].o-FOOT SIDE YARD SETBACK. 6) EGRESS REQUTREMENTS - TNCLUDtNG STAIRS, LANDTNGS & HANDRAILS - PER 2015 l.B.C., CHAPTER 1.0. LOCKS, LATCHES & LANDINGS AT DOORS PER SECTION 1010. 7l pROVtDE ACCESSTBLE ENTRANCE tNTO OFFICE AREA W|TH AN ACCESSIBLE ROUTE CONNECTING TO pARKtNc & PASSENGER LOADTNG AREAS AS PER l.B.C., CHAPTER 11 (SECTIONS tt}4,'J.105, AND 1_106). ACCESS|BtLTy REQUTREMENTS (tNCLUDTNG RAMP, LANDINGS, RAILINGS, ETC.) PER 2015 LB.C., CHAPTER 11AND l.C.C. 4LL7.1-2009. s) LtGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 l.B.C., CHAPTER L2. 9) AppLtcANT TO CONTACT LOCAL FtRE DTSTRICT FOR F|RE CODE REQUIREMENTS INCLUDING FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LETTER FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 1.0) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY.