Loading...
HomeMy WebLinkAbout1.0 CorrespondenceTO: Garfield County Department of Development FROM: Don Waechtler RE; The Subdivision of a parcel of land within Lot 15, Section 7, Township 75, Range BBW of the 6th P.M, DATE: February 8t 1983 Dear Director, This letter is being submitted as a sketch plan subdivision application on the above referenced parcel of land. The parcel is described by metes and bounds on the boundries and improvements survey submitted as part of this application. The request is to divide the existing .75 acre parcel into two approximately equal parcels. The property is zoned commercial limited and is contiguous to either state highway r.o,w. or prop- erty zoned commercial limited. The parcel is now adjacent to both State Highway #82 frontage road and County Road #110. The proposed split would assure that each parcel would continue to have access to one or both of these roads. The property is now served_.hy= boLh,fhe Catt sociation (C.C.W.A, ) and u" (a judicated .domestic need ar ise the C.C.w,A, would\76$ridS"iaaitional le Creek Water As- weI1. Should the water to the site (see accompanying letter f rom the C.C.I^I,A. ) . It is anticipated that a tight commercial use on the property would generate approximately 225 gallons of effluent a day. Inves- tigation of the soils on the site indicate that they are capable of handling that amount of additional effluent; therefore it is proposed that the additional Iot be served by an I.S.D.S. As per section 3.02.0I of the Garfield County Subdivision P.eg- u1ations,this1etterisa1sclsubmittedaSanappIi.uffi Yours TruIy, i- 1 , | ,., l:. '. I ... 1 Don Waechtler fur the enc.