HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-08-19-5925
Slawek & Joanna Wojciuch
New Single -Family Residence
3 n s * Sbf2 IS
Spring Ridge Reserve — Phase 1, Lot 26
1) WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.), 2015
INTERNATIONAL FIRE CODE (I.F.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION
CODE (I.E.C.C.)
2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED
"GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES REDLINED
ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 1500 PSF.
4) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS
REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF
OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH BUILDING
ENVELOPE REQUIREMENTS.
5) INSTALLATION OF AN AUTOMATIC FIRE -SPRINKLER SYSTEM 15 REQUIRED, AND IT SHALL
COMPLY WITH N.F.P.A. 13D OR I.R.C., SECTION 2904. VERIFY ALL FIRE SPRINKLER SYSTEM
REQUIREMENTS AND COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT. PROVIDE
EVIDENCE OF ROUGH -IN APPROVAL AT FRAMING INSPECTION, AND FIRE DISTRICT FINAL
APPROVAL REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
6) RETAINING WALLS GREATER THAN FOUR -FOOT IN HEIGHT SHALL BE ENGINEERED AND
SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.