Loading...
HomeMy WebLinkAboutEngineer Report 10.01.19Re: P¡.rrrr,r,o AssocIATEs ENcrnrcnRs, rNC. STRUCTURAL CONSULTANT S I 21 5 grand avenue, post office box 75 1 glenwood springs, colorado 8 1602 phone (970) 945-9695 e-mail: info@paengineers.com October 1,2019 Roaring Fork School District 1405 Grand Avenue Glenwood Springs, CO 81601 Attn: ShannonPelland,AssistantSuperintendent Canyon Creek Schoolhouse Foundation Repairs Garfield County Building Permit #BLCO-O7- I 5 -3824 0566 County Road 137 PAE Project #15053 To Whom It May Concern: As Principal Engineer of Pattillo Associates Engineers (PAE), Robert M. Pattillo acted as Structural Engineer of Record (SEOR) for design of repairs and improvements to the foundation system ofthe historic Canyon Creek Schoolhouse, a property owned by the Roaring Fork School District. Periodic field inspections of the project were also conducted to veri$ as-built compliance with the structural construction drawings. The construction work was accomplished by Virgil Howard of Yampah Builders, Glenwood Springs, and the project architect and administrator was Suzannah Reid of Reid Architects, based in Aspen. The project was funded in part by a grant for historic preservation by the Colorado Historical Society. Based on my observations, I believe that all required structural modifications were completed and constructed in general conformance with our desigrr intent and with the County-approved drawings prepared by our office dated May 8, 2015 (Rev. B), as clarified during construction. This completes our report. Please contact me if you have any questions or desire further information. Sincerely Robert M. Pattillo, P.E. Principal Engineer email copies:Shannon Pelland (pelland@rfschools.com) Suzannah Reid (vkr@reidarchitects.com) Virgil Howard (yampah@rof.net) JimWilson@ Lt 16754 L