HomeMy WebLinkAboutOWTS Design Report 10.02.190ctober 2,2019
Paul and Marianne Stanek
2980 County Road 311
New Castle Co 81647
RE Design Report-Onsite Wastewater Treatment System (OWTS), 2980 County Road 3l 1, Lot 8, Mineota
Ridge Est. 3'd Subdivision, Garfield County, Colorado
SE iob No. 19228.01 Parcel Number: 2179-134-00-011Garfield County Permit:
Dear Paul and Marianne
This letter repoft presents the applicable findings in regard to the design and construction of a replacement Onsite
wastewater Treatment System Cowrsl at the ãbove referenced site, in support of your owrs permit application
to Garfield County. The design recommendations, specifications and construction details are delineated on the
attached owTS permit/constiuction plan that is based on GIS, paritial Plat information, aerial mapping and site
assessment observations by Sopris Engineering.
The Sopris Engineering OWTS design is based on evaluation of existing physical site features, geotechnical soils
investigation und ,it" Jonditions witù respect to the proposed residential usage, building layout and applicable
reg,rlatãry design criteria that is in accordance with 3taie and County owTS Regulations' The design criteria and
system sizing information is summarized below'
Summary Desisn Criteria
The existing 3-bedroom residence has split waste flows and is served by two separate oWTS's' The original
historic field is failing. The design is to provide for a replacement absorption field based on treatment sized for an
equivalent 2-bedroorn'c apacity Jingle family residence onsite wastewater treatment system (owTS). The design
flow is calculated as follows for ll2the waste flows of the existing single family. This design is for the replacement
of the older existing pipe and gravel field that has historically served the kitchen and original bathroom. The other
existing owTS, initalled in 2001, serves the previous house addition's waste including the new bathroom that
contrib-utes approximately 712 of thetotal waste flow. The existing system has a design capacity of 450 gpd and
will be utilized for continued usage.
The replacement 9WTS will utilize the existing 1000 gallon 2-compartment septic tank, located in the existing
gravel driveway. New traffic rated risers with access lids at the surface will be installed on the existing tank. The
tank has an inlet sanitary tee and a new outlet effluent filter sanitary tee will be installed in the second compartment'
The existing gravity ."*". pipe will be maintained from the residential structure to the existing tank. The new
replacemenì *it t.åut-""t u"it (STU) will consist of leaching chamber trenches that provide 350 s.F' of total
absorption area. The septic tank effluent will be gravity discharged through a new 4-inch schedule-4o or SDR-35,
installed at1%o slopeacross the driveway, to the STU via a distribution box. The effluent will be equally distributed
from the distribution box via 4" distribution pipes connected to the head end cap in each chamber trench'
Observation ports with caps will be installedon each end chamber unit. The design is in compliance with the
current county regulations with design calculations based on the soil type, texture and structure with an appropriate
long term acceptance rate (LTAR). ihe designed system meets all required setbacks and will be installed within the
genãral location indicated àn the plan. The existing well is located south of the development area over 100 feet
lom both systems. Our design is outlined below and delineated on the attached C-l plan.
Desisn Flow
502 Main Street Carbondale, C0 81623 (e70 Fax (970) 704-031 3704-031 1Su ite A3 aaaa
$oPnls ÍttGIltIRIllG o 11G civil consu ltants
Alameno, OWTS, 2980 C.R. 311
SE Job No. 19228.01
October 2,2019
Page2
The replacement OWTS is designed for a treatment capacity of 300 gallons per day based on the design wastewater
flow tó serve a 2-bedroom capacity residence in accordance with Table 6-2 values, Section 43.6, 4.4.
From the Regulation 43 usage table :
Minimum population based on 2 bedrooms:4 persons'
Gallons per day per person :75 gallperson/day, No peaking factor
Max. Design flow (Qd)gallons lday = (# of people) x (avg. flow)galipersonlday.
Design flow Qd :4*75:300 gqd
Use the existing 1000 gallon, two compartment concrete septic tank. Install with an effluent filter outlet sanitary tee
in the second compartÃent. Existing tank usage shall continue with installation of new accesses. Install traffic rated
concrete risers and iron ring and covers to the finish grade surfac e (1) 24' dia. x 24" depth and 1 ) 24' dia. x I 8"
depth risers).
Sub Surface Conditions and Observation
A subsurface soil investigation and site assessment was performed by Sopris Engineering on October 1, 2019. The
soils in the proposed fielã envelope area were sampled and characterizedby application of the USDA visual/tactile
soil texture method analysis. Thé soils below 6 inches of topsoil consist of medium dense slightly sandy silt loam
soil with less than 5%o sóattered gravels and cobbles to 8 feet below the surface grades. The soils appear to be
consistent across the site from observations in the excavated profile pit'
The native soils sampled from 2-3 feetbelow the surface are characterized as a soil type 2 consisting of silt loam
texture with granulai structure. This soil has an effective loading rate for conventional soil treatment of 0.6
Gal/S.F./day for a level 1 conventional treatment system. The equivalent percolation rate is assumed to be 20-30
minutes pei inch. No free water was encountered in excavations on site. Seasonal high Groundwater levels are
expected to be below 20 feetfrom the existing surface grades. The soils are suitable for a shallow conventional
shàllow absorption field consisting of gravelless infiltration chamber units.
Treatment-Soil Treatment Unit/ Absorption Svstem Desisn
The treatment/absorption field is designed based on utilizing the effective Long Term Acceptance Rate (LTAR) for
the native soils and the application ofãppropriate loading factors for a soil treatment unit system utilizing gravity
distribution to gravelless^óhamber trenches. The new treatment system and absorption field will consist of gravity
distribution of septic tank effluen t via adistribution box to individual chamber trenches with treatment across the
native soil absorptive surface.
The shallow STU trenches shall be installed with a maximum depth to the absorptive surface of 36 inches from
finish surface grades and backfilled with approximately 6-inches of final grading topsoil mounded over the trenches
placed to alloi positive drainage away from the surface. Chambers shall be installed level in native soil. Each
trench will be constructed levei along the contour with successive trenches installed following natural contour
grades accordingly. A minimum separation distance of 4 feet will be maintained between the individual trench
sidewalls.
The engineer, prior to installation shall inspect the trench excavation to confirm suitable soil conditions. All septic
system components and trench installations are to be approved by the Engineer and County prior to backfilling.
Field Sizing:
Alameno, OWTS,2980 C.R. 311
SE Job No. 19228.01
October 2,2019
Page3
Long Term Acceptance Rate (LTAR)
Considering the application of the state regulation 43:
Receiving Wastewater Treatment Level 1; Soil type 2loadingrate for a silt loam is (0.6 gal./S.F./day).;
Loading factors; (Table l0-2, Gravity application trenches : 1.0 ) and
(Table 10-3, gravelless chambers : 0.7)
A(sÐ: Qd
LTAR
A: Area;
LTAR : 0.6 Gal/S .F.lday for silt loam
Qd: flow (gallday):450 gPd
L.F. 1:1.0 GravitY Distribution
L.F.2:0.7 Chambers
A(sÐ : 300 gpd x 1.0 x 0.7 : 350 S'F
0.6 Gal/S.F./day
Number of 5'x3' Bio-Diffuser chambers:
350 S.F :23.3 chambers Use 24 chambers
15 S.F./Chamber
rJse Z4Bio-Diffuser chambers in two trenches 60' long by 3' wide with 12 chambers units per trench plus two end
caps as delineated on the plan. The septic tank effluent will be gravity distributed to the head of each chamber row
via individual distribution pipes from a distribution box'
Construction and InsPections
prior to construction of the permitted system, the engineer should be contacted by the contractor and owner well in
advance to provide adequatå time to discuss the system components with the contractor, answer questions, resolve
any conflici issues and schedule inspection site visits based on construction progress. A pre-oWTS construction
mðeting is essential and required prior to installation of the OWTS. All septic system components shall be staked
in the field for approval by the Engineer prior to excavation'
During initial construction the engineer will evaluate the soils in the absorption treatment field excavations to
confirm soil conditions and make adjustments as needed. All septic system components and trench installations are
to be approved by the Engineer prioi to backfilling. All installation will be inspected, surveyed, reported and
delineated in the Certificãtion letter and record drawing. The contractor needs to photo document all OWTS
construction phases and supply photos to the Engineer.
County Regulations require that the Engineers of record perform site inspections of the permitted system during
construction and provide "As-Built" documentation of the installed system to the County after construction is
complete.
OWS Operation and Maintenance
Ownership of the system and responsibility for maintenance and repair will remain with the property Owner. The
Owner i, ãn"ou.agãd to retain thè services of qualified personnel to inspect the OWTS and to perform all
maintenance and repairs necessary to ensure that the ryrt"- components are maintained in good operating condition
and suitable vegetative cover is "rtublirh"d
on the fields. The components of the owTS system should inspected
within:0 daysãf being placed into operation and should been inspected and maintained bi-annually. The tank,
absorption field and other system components should be visually inspected bi-annually for debris, damage,leaks, or
Alameno, OWTS, 2980 C.R. 311
SE Job No. 19228.01
October 2,2019
Page4
absorption field and other system components should be visually inspected bi-annually for debris, damage, leaks, or
other potential problems. In general, for a properly utilized system, septic tanks should be pumped every 3 - 5years.
The effluent filter should be ðleaned every six months and at the time of pumping. Absorption fields should be
maintained with suitable vegetative cover and kept free of root invasive plants. Positive surface drainage away from
the absorption freld should be maintained.
If you have any question or need any additional information, please call.
Sincerely,
SOPRIS ENGINEERING, LLC
Paul E. Rutledge
Design Engineer
Yancy Nichol, PE
Principal
28371
ORE