Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-09-L9-5966 and SEPT-09-L9-5959 Garfield Cou nty La ndfill 75 CR 246 Rifle, CO Scale House and Admin Bld. 1) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY',S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES. 2l FACTORY-BU|LT STRUCTURES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (c.D.o.H.)AND ALL FACTORY-BUILT STRUCTURES lN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. C.D.O.H. INSTALLATION INSIGNIA SHALL BE AFFIXED PRIOR TO GARFIELD COUNTY'S FINAL BUILDING INSPECTION & CERTI FICATE OF OCCU PANCY. 3) FOUNDATTON, BUtLDtNc EGRESS AND ALL RELATED SITE WORK SHALL COMPLY WITH 2015 TNTERNATTONAL BUtLDtNG CODE (t.B.C.) AND MANUFACTURER',S REQUIREMENTS. ALL WORK SHALL ALSO COMPLY WITH GARFIELD COUNTY'S 'COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS. 4l FACTORY-BUtLT STRUCTURE tS APPROVED AS NON-SPRINKLERED, TYPE V-B CONSTRUCTION wtrH occuPANCY GRoUP "8" (BUSINESS) USE. 5) AppLtcANT TO CONTACT LOCAL FtRE D|STRICT FCIR FIRE CODE REQUIREMENTS INCLUDING FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LEÏTER FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY. 6) OPEN-HOLE SOTLS REPORT rS REQUTRED AT FOOTING INSPECTION, 3000 P.S.F. 7l EGRESS REQUTREMENTS pER 2015 t.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS PER SECTION 1.010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH-IN INSPECTION. 8) ACCESS|BtLTy REQUTREMENTS pER 20L5 l.B.C., CHAPTER 1.1- AND l.C.C. 4117.1- 2009. PROVIDE ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICES, INCLUDING LANDINGS, RAMP, RAILINGS, ETC. 9) L|GHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 l.B.C., CHAPTER 12. 10) RESTROOM SHALL COMpLy WITH ACCESS|BILITY REQUIREMENTS PER l.B.C, CHAPTER LL AND I.C.C. A117.1- 2009. PLUMBING PIPES WILL NEED TO BE FROST-PROTECTED AGAINST FREEZE- UPS IN THE AREA BETWEEN BOTTOM OF FLOOR STRUCTURE AND FINISH GRADE BELOW. 1L) ON-S|TE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY 12) ELECTRTCAL REQUTREMENTS, PERMtTTtNG & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND _.F.F.'J6 Ítvç F* 2,3'n'4:t#gr*$ffiî