Loading...
HomeMy WebLinkAboutApplication-PermitProject Address Garfield County Building & Planning Department 108 8th Street Suite 401 Glenwood Spr¡ngs, CO 81601- Phone: (970)945-8212 Fax: (970)384-3470 Parcel No.Subdivision Section Township Range lssue Date: 8126/,2009 Expires: 0212212010 003030 cR 315 slLT, co 81652- 217929400672 92296 Owner lnformat¡on Address Phone Cell (970)876-21 95 (e70)30e-2956Ghris Fuller co Contractor(s)Phone Primary Contractor Required Inspections: For lnspect¡ons call 1(970)384-5003 lnspection IVR Proposed Construction / Details Contact: Chris Fuller. This property is curmtly ovned by Lisa Miller. Ch¡is Fuller is in the process FEES DUE FEES PAID Fee Amount Penalty Fee Plan Check Fee Residential Building Fee Total: $293.25 $190.61 $293.25 $777.11 Valuation: Total Sq Feet: $ 17,280.00 960 Building Department Gopy See Permit Record lnv Total Paytype Amt Paid Amt Due lnv # BLRE-8-09-19696 $ 777.'11 Cash Cash Check # 301 $190.61 $0.04 $586.46 $ o.oo 2Wednesday, August 26, 2009 ffeç*r\ o S L'sq ttlíll*'r¡ ùs fulhr rtrü@app¡EI.D couNTy BUILDING pERMIT AppLICATIoN 108 8th Street, Suite 401, Glenwood Springs, Co 81601 Phone:970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 "+ î NOTICE letter of authority, signed by the Owner, must be provided with this Application. Legal Àccess. A Building pãrmiì camðt be issued without proof of legal and adequate access to the property for purposes of inspecúons by the Building Department. County Highway/ Road Access or a State Wastewater Discharge Pemit. days after commencement. and spécifications md other datâ submitted by me or on my behalf (submittals), based upon my certification as to âccuracy. the submittals reviewed by the Building Department construction oiuse of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. ofCounty Regùlation(s) or any other applicable law' limitation my architect designer, engineer and/ or builder. I TIEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: 1 Parcel No: (this information is available at the assessor! ofñce 970-945-9134)-t , 17q^q4Ôob7 ^2 Job Address: (if an address hâs not beenja\o c[ 3tç I provide Cr, Hwy or Street Name & City) or and legal description'(^, 9ilrçe 3 Subd./ Exemption:Block ño:Lot No 'n'?)u*8)6*Åtçç AIt Ph;Mailins Address:3b30 (K Ztço''"""''¿[ï,? ":Hlkr Ph:AIt PhMailing Address5ô uJ r\-e4-Contractor: Ph:AIt Ph:Mailing Address:6 Architect / Engineer: øeient: ¡g No. f Floors:sr. Ft. orêiqi of Lot:n7Sq. Ft. of BuilOt"W,Ð 8 Describe Vy'ork:9 Class of Work: n Alteration o AdditionúNew 10 n Communityn ISDS Septic:11 ( Detachedn Attached Garage: Owners valuation of Work:r l'3,Øö ^ uu12Driveway Permit: Fo¿AVø*7-v3+ Ëc,r I' Fc¿c r'¡at- ÞtqrÌf ı-zt+og STAFF USE ONLY >Q-Òq 5ECD LtQ l <-l¿7Ö | o,Ø3 eet Special Conditions: Permit Fee:gq5,2t Manu home Fee:Plan Check Fee: l,qo.ûl Adjusted Valuation: n2þ.oa Balance Due: 5âO,46 BP No & ksue Date: -174Fees Paid: \qo.05 ISDS Fee:Total Fees: 777.t| Const Type:OCC Group:Setbacks: \ DATE ( AL wf Misc Fees:nû.2€ Zonìngz Ø ISDS No & Issued Date: APPROV DATE Building Plan Review Description of Work: Garage Bin #: PIF Location Address: 003030 315 COUNTY RD SILT, CO Case Manager: Ken Smith Plan C¡se Number: BLDG-8-09-6075 Parcel: 217929400672 Application Datez 0812412009 Owner: Lisa Miller Applicanû LisaMiller Applicant Phone: il+577-3213 Email: ContactsGeneral Irrforrnation Buildins -Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List Minimum Application Questionnare Subdivision Plat Notes Fire Department Review uation Determination/Fees Red Line P|ans/StamPs/Sticker Attach Gonditions , Application Signed Plan Reviewer To Sign APPlication Parcel/Schedule No' 40# Snowload Letter - Manu. Homes Soils Report Planni ¡no Property Line Setbacks 30ft Stream Setbacks Flood Plain Building height zoning Sign-off Road lmpact Fees HOA/DRC Approval Grade/Topography 40% Planning lssues -#ubdivision Plat General 1øiu tØ " 172Ø 2q9 ^05 2q4_% Tuesday, August 25, 2009 TI7.Itr The items are required bv Garfield County for a final Insoection: 1) A fînal Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable buitding; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and./or State Agencies where applicable. a cERTrFrcaTE oF occuPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. O\ryNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O.IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. SIGNATURE B applicati ondecember20OT DATE ¿r-c Lisæ Milfer ä23.2* Upper Imnaha Rd lrn*æha, ÕR 97&4? ,{ugust 24, 2üû$ üarfi*ld fcunty $t:ilding & Pl**ning Åttn: iulic Tayfcr Fxx: 9?ü-3S4-347* RËr 3ü3* Caun*¡ Rc*ql 315 Julic: l. l-isa Miller, I'rave givex Chris suller perrnission t* bu;ld é gäråge at 3û3ü C*unty R*ad 3åS, Sitt, t# Flease let rne knavr¡ if ynu need any f*rlher i*f*rnrati*n. 541-577-3:lg^ Thank ynu, "{ ""1 4,;' ; ¡f¡.'","'ir t., "r, . I I /¿.lt.l*t Lisa Milfer GARFIELD COIJI.TTY BUILDING AND PLANINING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE F'AMILY DWELLING CONSTRUCTION Including N'*f8iliJ,åK:TION ALTERATIONS And MOVED BUILDINGS In order to understand thc scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS OF CONSTRUCTION DRAWTNGS & TWO (2) SrTE PLANS MUST BE SUBMITTEDFOR ALL APPLICATIONS Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction ofyour project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18?rx24rr and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house.rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be retumed. All plans submitted must be in conipliance with the 2003 IRC, and 2006 IECC 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each oorner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30Yo or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes K 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do aoolv.vË'' X. 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses?yes N\/ti, 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes ^ 2 5. Have you provided any RESOLUTIONS and/ or LAND USE PERMIT(S) associated with this property?Yes A/lr if Yes please provide a COPY. No_ 7 6. Are you aware that prior to submittal of a building permit application you are required to show proof of a légal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easemenlright of way; A County Road and Bridge permit; a Colorado Dept. of Hi$hway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-8601. See phone book for other asencies Yes "K 7. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accor{ance with the IRC or per stamped engineered design? Yes K 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances between wood and earth? NoYes 9. Do the plans indicate the size and location of ventilation openings for the attic, roofjoist spaces and soffits? Yes f\lk NoI 10. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes { 11. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction?Yes X 12. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roofrafters orjoists or trusses? Yes X 13. Does the building section drawing or other detail include the method of positive connection of all columns and beams?Yes 'I 14. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Building height measurement usually not to exceed 25 feet) Yes ( aJ 15. Does the plan include any stove or zeto clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No K 16. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? Yes No X 17. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IRC? Yes 18. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms?Yes A 19. Do the plans indicate the locatiôn of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 20. Is the location of all natural and liquid petroleum gas fumaces, boilers and water heaters indicated on the plan? Yes nl*/' 2l. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes t4/*I 22. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revocation or substantial modiflrcation of the plans.yes yll*,I 23. Will this be the on Yes tial structure on the parcel? No ffi If no-Explain: €(,sf;"q frdvL^t *t'&req"eg"*'W-** 24.Have two (2) complete sets of construction drawings been submitted with the application? Yes X 4 25. Do you understand that the minimum dimension a home can be on a lot is 2Oft.wide and 20ft. long?V". ß 26.Have you designed or had this plan designed while considering building and other construction code requirements? Yes I 27. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district?Yes K 28. Does the plan accurately indicate what you intend to construct and what will receive a frnal inspection by the Yes County B uilding Department? 29. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes ñ 30. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes K 31. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003.Yes K 32. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes X 33. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection glqto receiving a Certificate of Occupancy and occupancy of the buildins? Yes " i.. Garfield x. No 5 34. Are you aware that the Permit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply with the IRC? Yes 35. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable Yes insnXtion 36. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building permit application? Your attention in this is appreciated. Yes { 37 . Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes ß þlease check with the building department about this requirement) 38. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes y. 39 . Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes F 40. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building permit application will be accepted without such a letter Yes I hereby acknowledge that I have read, understand and answered these questions to the best of mya -ÀI-CR S of Owner ) 6 Phone: QIO- W1" ?'-îçtP (days); Date evenmgs Parcel Detail Parcel Detail I Page 1 of4 Garfield County Assessor lTr easurer Parcel Detail Information ¡\5sessor/Treasurer Property Search I Assessor Subset Query | Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Value Detail I lland Pçørl I Sales Detail I Phstoeraphs I Residential/Commercial Improvement Detail Mill Lev.v Revenues Detail Tax Area Account Number Parcel Number 2008 Mill Lew 024 R007094 2r7929400672 46.st2 Owner Name and Mailing Address MILLER, LISA M. 2860 CNTY RD 3I5 SILT, CO 8I652 Assessor's Parcel Description (Not to be used as a legal description) Location Range SECT,TWN,RNG:29-6-92 DESC : NE, CONT 36 AC. PRE:R247142 :591 PG:337 BK:591 PG:335 BK:443 91 BK:1564 PG:154 RECPT:647226 1 3 37 PG:3 52 RECPT: 5 99052 BK:1327 149 RECPT:596938 BK:1223 PG:507 :57 3990 BK:0892 PG:0390 Address:O 315 COUNTY RD SILT Subdivision: Land Acres: Ft:Land Section T http ://www. garcoact. com/assessorþarcel.asp?ParcelNumb er2l7 929 40067 2 812512009 Parcel Detail Page 2 of 4 92629 2009 Property Tax Valuation Information Additional Va,lue Detail Most Recent Sale Additional Sales Detail Basic Building Characteristics Number of Residen 1 Number of 0 Actual Value Assessed Value Land:205 t6 320 130 10,400 Total:335 720 Sale Date: Sale Price: Occurrence L CharacteristicsResidential l STORY:1,377 1,377TOTAL HEATED AREA: ABSTRACT CODE: S SINGLE FAM.RES- MANUFACTUREDARCHITECTURAL STYLE: EXTERIOR \ilALL: ROOF COVER:COMP SHNGL GABLEROOF STRUCTURE: INTERIOR WALL:RYV/ALL FLOOR:SHT VINYL CARPETFLOOR: HEATING FUEL:GAS FORCED AIRHEATING TYPE: STOzuES 1.0STORIES: http:/iwww.garcoact.com./assessor/parcel.asp?ParcelNumber2I7929400672 812s12009 ROOMS:5 1UNITS: BEDROOMS:J 2000YEAR BUILT: Parcel Detail Page 3 of4 BATHS: Additional Residential/Commercial Improvement Detail Tax Information Mill Le\'¡r Revenues Detail Tax Year Transaction Type 2008 Tax Payment: Second Half 2008 Tax Payment: First Half 2008 Tax Amount 2007 Tax Payment: Second Half 2007 Tax Payment: First Half 2007 Tax Amount 2006 Tax Payment:Whole 2006 Tax Amount 2005 Tax P Second Half 2005 Tax P First Half 2005 Tax Amount 2004 Tax Payment:Second Half 2004 Tax P First Half 2004 Tax Amount 2003 Tax P : Second Half 2003 Tax P First Half 90.s 2003 Tax Amount $981.68 2002 Tax Second Half 86.3 2002 Tax : First Half 86.3 2002 Tax Amount s972.76 2001 Tax P t: Whole $s 2001 Tax P Whole $1.1 2001 Tax Amount $1.10 2001 Tax Amount $s.00 http://www.garcoact.com,/assessor/parcel.asp?ParcelNumber2l7929400672 812512009