HomeMy WebLinkAboutApplicationr
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 81h Street, Suite 401, Glenwood Springs, Co 81601
Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 888-868-5306
www. turf field-cou ntv. corn
1
Parcel No: (this information is available at the assessors office 970-945-9134)
c2i73 c 3 do635
2
Job Address: (if an address has riot been assigned,
/ [0544 LLiq. is 4--. +
please provide Cr Hwy or trcet Name & City) or and legal description
' l to s0
No: Subd./ Exemption:
3
Lot No: Block
4
Owner: property owner)
Dou IA- � 4- 6e u 1 r�
Mailing Address: �,i'ir�.
•#'
CR 304 Gd
Ph:
74 tea -573 4-
Alt Ph;
5
Contr or:
av Y e.
MailingAddress:Pb:
10 -11-70 s Lp OA o
6/76'keH-,0
Alt Ph:
6
Arellite t / Engineer:
• 'Le.
Mailing Address:
a ...26 z a ( , Got o
Ph
470 ALB 41141
Alt Ph:
7
Sq. Ft. of Building:
Sq. Ft. or Acres of Lot:
Height:,�
No. of Floors: lelner
8
Use of Building: .5415/
(), ,e01- .joth__) i ef 0 1,644.64--
J
9
Describe Work:�-
t,
()-"JD
10
Class of Work:
-ergew o Alteration ❑ Addition
11
Garage: r i�
fvA ❑ Attached ❑ Detached
Septic: r
Its //4 o ISDS o Community
AT/
12
Driveway Permit: ���
C! r Prat
Owners va of Work: $ �� fa
► --
Authority.
This applicndon fore Building Permit must be signed by
loner of authority, signed by the Owner, must be provided
A Building Permit cannot he issued without proof of legal
NOME
the Owner of the property, described above, or as authorized agens, if the signature below is net that of the Owner, a separate
with this Application.
end adequate access to the property for purposes of inspections by the Building Dcpaitment_
Electrical Permit, (2) County 1SDS Permit, (3) another permit required for use on the property identified nhove, e.g. State or
Discharge Permit.
authorised is not commtneed within 180 days nrthe data of issunnce and if work is suspended or abandoned for n period of 180
CERTIFICATION
contained above is tate rind correct. 1 understand that the Building Department accepts the Application, along with the plans
based upon my certification as to accuracy.
a Building Permit will be issued panting permission to me, se Owner, to construct the stricture(s) and facilities detailed on
and my agents will comply with provisions of any federat, state or Focal law regulating the work and the Outfield County Building
Regutntion(a))_ [ acknowledge that the Building Permit may he suspended or revoked, upon nation from the County, if the location.
are not in compliance with County Regalation(s) or any other applicable law.
described above, to inspect the work, 1 further acknowledge that the issuance of the Building Permit docs not prevent the
if any, discovered after issuance; or (2) !tapping cnnstnictian or use afthe structure(!) or feeility(ies) if such is in violation
work by the Building Department do not constitute nn acceptance ofresponsibility or liability by the County of errors, omissions
compliance with federal, state and local laws and County Regnlntions rest with me lead my authorized agents, including without
THE NOTICE & CERTIFICATION ABOVE:
J..eeal Accesp,
Other Permits, Multiple separeie permits may be required: (1) State
County Highway/ Road Access ora State Wastewater
Void Permit, A Building Permit becomes null and void if the work
I hereby certify,
and specifications
Assuming
the submittals
In corueideration
Code. ISDS
construction
1 hereby grant
Building
of County
Review of
or duscrnpancies.
limitation
1 HEREBY
-adlali
days after commencement.
that [ have mad ibis Application and that the information
and other dais submitted by me or on rrty behalf(submittals),
completeness of the submittals and approval of this Application,
reviewed by the Building Department.
of the issuance of the Building Pennit,1 agree that 1
regulations and applicable land use regulations (County
or use of the structure(s) and focility(ies), described above,
permission to the Building Department to eater the property,
Official from: ( l) requiring the correction of errors in the submittals,
Regulation(s) or any other applicable Iaw.
this Application, including submittals, and inspections of the
M the Owmr, 1 eclutowledge that respon,nbility for
my architect designer, engineer and/ or builder.
ACKNOWLEDGE THAT) HAVE READ AND -UNDERSTAND
4
TATA"'
- ---
UWN SIGNAI W(L
Nor 11 -3o -lo eP G-8-10
-10
p K, tot -i $ c 4 iouLi q STAFF USE ONLY
lb I 63•3) '5oa.s°
Special Conditions:
Adjusted Valuation:
l L/ 3�5 zo
ISDS Fee:
Setbacks:
1O6, (00
BL DEP
cv-d-etai /44/D
Plan Cheek Fee:
163,3)
Total Fees:
665.8 _
OCC Group:
Permit Fee: 1 Manu home Fee:
Z51 2-5
Fees Paid:
)6 3.31
APPROVAL DATE
lA,
Balance Due:
BP &Issue Date:
5oz.s'o -1 5st
Const Type:
g
Mise Fees: Z j( peygf-r
z51. 7-5 see
ISDS No & Issued Date:
PLNG DEP :
/
AP ROVAL DATE
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the issuance of a
permit it is important that complete information be provided. When reviewing a plan and it's discovered that
required information has not been provided by the applicant, this will result in the delay of the permit issuance
and in proceeding with building construction. The owner or contractor shall be required to provide this
information before the plan review can proceed. Other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado
Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during design.
TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE
SUBMITTEDFOR ALL APPLICATIONS.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade
line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap,
(which is required), siding or any approved building material. Engineered foundations may be required.
1
Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to
withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B
or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be in compliance with the 2009 IBC, IPC, IMC, IFGC, and IFC, 2009 IECC.
Applicants are required to indicate appropriately and to submit completed checklist at time of
application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings,
setback easements, and utility easements showing distances to the property lines from each corner of
the proposed structure prepared by a licensed surveyor and has the surveyors signature and
professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan.
(NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision final plat shall
be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the
drawing. Any structure to be built within a building envelope of a lot shown on a recorded
subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the
proposed structure located within the envelope.
Yes /
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System)
and distances to the property lines, wells (on subject property and adjacent properties), streams or
water courses? This information must be certified by a licensed surveyor with their signature and
professional stamp on the design.
Yes Not necessary for this project ./_
3. Does the site plan indicate the location and direction of the State, County or private road accessing the
pro perty?
Yes .7
4. Have you provided any RESOLUTIONS and/ or LAND USE PERMIT(S) associated with this property?
Yes / if Yes please provide a COPY. No Aja) 4 • d
5. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado
Registered Engineer?
Yes Not necessary for this project
6. Are the plans submitted for application review construction drawings and not drawings that are stamped or
marked identifying them as Not for construction, for permit issuance only", "Approval drawings
only", "For permit issuance only" or similar language?
Yes Not necessary for this project /
2
7. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in
accordance with the building code or per stamped engineered design?
Yes Not necessary for this project 7
8. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this
building?
Yes _ _ Not necessary for this project
9. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the
clearances required between wood and ea h?
Yes Not necessary for project
10. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and
soffits? .l
Yes Not necessary for this project
11. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40
pounds er square foot in Garfield County)?
Yes Not necessary for this project
12. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes Not necessary for this project
13. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction?
Yes Not necessary for this project
14. Is the wind speed and exposure design included in the plan?
Yes Not necessary for this project
15. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof
rafters or joists or trusses?
Yes / Not necessary for this project
16. Does the building section drawing or other detail include the method of positive connection of all columns
and beams?
Yes / Not necessary for this project
3
1.7. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed
grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof?
(Check applicable zone district for building height maximum)
Yes /- Not necessary for this project
18. Does the plan include any stove or zero clearance fireplace planned for installation including make and
model and Colorado Phase II certifications or Phase II EPA certification?
Yes Not necessary for this project_/
19. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with
the IBC or IRC?
Yes Not necessary for this project /
20. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping
rooms and/or basements comply with the requirements of the IBC or IRC?
Yes Not necessary for this project /
21. Does the plan include a window schedule or other verification that windows provide natural light and
ventilation for all habitable rooms?
Yes Not necessary for this project
22. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes Not necessary for this project
23. Do the plans include a complete design for all mechanical systems planned for installation in this building?
Yes No Not necessary for this project /
24. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in
the IBC Chapter 3)
Yes Not necessary for this project_
25. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in
this building?
Yes Not necessary for this project
26. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the
plan?
Yes
Not necessary for this project
4
27. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and
both sexes are employed, facilities for both sexes?
Yes Not necessary for this project /
28. Do the plans indicate that restrooms and access to the building are handicapped accessible?
Yes Not necessary for this project /
29. Have two (2) complete sets of construction drawings been submitted with the application?
Yes
30. Have you designed or had this plan designed while considering building and other construction code
requirements?
Yes /
31. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by
the Garfield County Building Department?
Yes /
32. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For
corner lots see supplemental section 3-301 in the Garfield County Zoning Resolution for setbacks.
Yes
33. Do you understand that approval for design and/or construction changes are required prior to the
implementation of these changes?
Yes /
34. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of
application and that you will be required to pay the "Permit" fee as well as any "Septic System" or
"Road Impact" fees required, at the time you pick up your building permit?
Yes 7
35. Are you aware that you are required to call for all inspections required under the IBC including approval on.
a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building?
Yes /
36. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for
an Agent and that the party responsible for the project must comply with the Uniform Codes?
Yes
5
37. Are you aware that you must call in for an inspection by 3:30 the business day before the requested
inspection in order to receive it the following business day? Inspections will be made between
7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 888.868-5306.
Yes /
38. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re -inspection fee?
Yes /
39. Are you aware that prior to submittal of a building permit application you are required to show proof of a
legal and adequate access to the site? This may include (but is not limited to) proof of your right to use
a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway
Permit including a Notice to Proceed; a permit from the federal government or any combination.' You
can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies
Yes /
40. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber
to perform installations and hookups? The license number will be required at time of inspection.
Yes /
41. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/
Schedule Number for the lot you are applying for this permit on prior to submittal of the building
permit application? Your attention in this is appreciated.
Yes . /
42. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes / (Please check with the building department about this requirement)
43. Do you understand that if you are planning on doing any excavating or grading to the property prior to
issuance of a building permit that you will be required to obtain a grading permit?
Yes Not necessary for this project
44. Did an Architect seal the plans for your commrcr the IBC to prepare the 4}ions and projectLaw requires any commercil
with occupancy of more than 10 persons asper
Section 1004 of
specifications for the project.
Yes Not Necessary for this project
45. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that
the City will provide water service. No building permit application will be accepted without such
a letter.
Yes
6
I hereby acknowledge that I have read, understand, and answered these questions to the best of my
ability.
Date
Phone: 970 (0X 5731- (days); (evenings)
Project Name: t,v\, r
Project Address: 16266:'9 ACU 4-.24-
Note:
On any of these questions you may be required to provide this information. If required information is not
supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the
permit.
*If you have answered "Not necessary for this project" on any of the questions and it is determined by the
Building Official that the information is necessary to review the application and plans to determine minimum
compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for building permits in the review process
and not reviewed until required information has been provided and the application rotates again to first position
for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
bpminrepcommJun20 1 0
7
Building Plan Review
Description of Work: storage/ carport for equipment.
Bin #:
Location Address: 16599 HWY 6 & 24
Rifle, CO
0E
General Information
Case Manager: David Bartholomew
Plan Case Number: BLDG -11-10-6666
Parcel: 217325300035
Application Date: 11/30/2010
Owner: Douglas & Beverly Teter
Applicant: Douglas & Beverly Teter
Applicant Phone: 970-625-5734 Email
i
Building
V
/OP r
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnare
Subdivision Plat Notes
Fire Department Review
/4
Valuation Determination/Fees
Red Line Plans/Stamps/Sticker
Attach Conditions
Application Signed
Plan Reviewer To Sign Application
Parcel/Schedule No.
40# Snowload Letter - Manu. Homes
Soils Report
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building height
Zoning Sign -off
Road Impact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
N/4
Subdivision Plat
General Comments:
Pevreko Pee--
Pe/441f
e e-
pe»1Lf-dee
Pei Pet
rnr/i-t--
A- + Piot
/YfZo
163, 31
ZS/. ZS
Z5'1• zS
6,S-",91
/63. �t
/4'4A)- T>lice = 3 D Z, �S O