Loading...
HomeMy WebLinkAboutApplicationr GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 81h Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 888-868-5306 www. turf field-cou ntv. corn 1 Parcel No: (this information is available at the assessors office 970-945-9134) c2i73 c 3 do635 2 Job Address: (if an address has riot been assigned, / [0544 LLiq. is 4--. + please provide Cr Hwy or trcet Name & City) or and legal description ' l to s0 No: Subd./ Exemption: 3 Lot No: Block 4 Owner: property owner) Dou IA- � 4- 6e u 1 r� Mailing Address: �,i'ir�. •#' CR 304 Gd Ph: 74 tea -573 4- Alt Ph; 5 Contr or: av Y e. MailingAddress:Pb: 10 -11-70 s Lp OA o 6/76'keH-,0 Alt Ph: 6 Arellite t / Engineer: • 'Le. Mailing Address: a ...26 z a ( , Got o Ph 470 ALB 41141 Alt Ph: 7 Sq. Ft. of Building: Sq. Ft. or Acres of Lot: Height:,� No. of Floors: lelner 8 Use of Building: .5415/ (), ,e01- .joth__) i ef 0 1,644.64-- J 9 Describe Work:�- t, ()-"JD 10 Class of Work: -ergew o Alteration ❑ Addition 11 Garage: r i� fvA ❑ Attached ❑ Detached Septic: r Its //4 o ISDS o Community AT/ 12 Driveway Permit: ��� C! r Prat Owners va of Work: $ �� fa ► -- Authority. This applicndon fore Building Permit must be signed by loner of authority, signed by the Owner, must be provided A Building Permit cannot he issued without proof of legal NOME the Owner of the property, described above, or as authorized agens, if the signature below is net that of the Owner, a separate with this Application. end adequate access to the property for purposes of inspections by the Building Dcpaitment_ Electrical Permit, (2) County 1SDS Permit, (3) another permit required for use on the property identified nhove, e.g. State or Discharge Permit. authorised is not commtneed within 180 days nrthe data of issunnce and if work is suspended or abandoned for n period of 180 CERTIFICATION contained above is tate rind correct. 1 understand that the Building Department accepts the Application, along with the plans based upon my certification as to accuracy. a Building Permit will be issued panting permission to me, se Owner, to construct the stricture(s) and facilities detailed on and my agents will comply with provisions of any federat, state or Focal law regulating the work and the Outfield County Building Regutntion(a))_ [ acknowledge that the Building Permit may he suspended or revoked, upon nation from the County, if the location. are not in compliance with County Regalation(s) or any other applicable law. described above, to inspect the work, 1 further acknowledge that the issuance of the Building Permit docs not prevent the if any, discovered after issuance; or (2) !tapping cnnstnictian or use afthe structure(!) or feeility(ies) if such is in violation work by the Building Department do not constitute nn acceptance ofresponsibility or liability by the County of errors, omissions compliance with federal, state and local laws and County Regnlntions rest with me lead my authorized agents, including without THE NOTICE & CERTIFICATION ABOVE: J..eeal Accesp, Other Permits, Multiple separeie permits may be required: (1) State County Highway/ Road Access ora State Wastewater Void Permit, A Building Permit becomes null and void if the work I hereby certify, and specifications Assuming the submittals In corueideration Code. ISDS construction 1 hereby grant Building of County Review of or duscrnpancies. limitation 1 HEREBY -adlali days after commencement. that [ have mad ibis Application and that the information and other dais submitted by me or on rrty behalf(submittals), completeness of the submittals and approval of this Application, reviewed by the Building Department. of the issuance of the Building Pennit,1 agree that 1 regulations and applicable land use regulations (County or use of the structure(s) and focility(ies), described above, permission to the Building Department to eater the property, Official from: ( l) requiring the correction of errors in the submittals, Regulation(s) or any other applicable Iaw. this Application, including submittals, and inspections of the M the Owmr, 1 eclutowledge that respon,nbility for my architect designer, engineer and/ or builder. ACKNOWLEDGE THAT) HAVE READ AND -UNDERSTAND 4 TATA"' - --- UWN SIGNAI W(L Nor 11 -3o -lo eP G-8-10 -10 p K, tot -i $ c 4 iouLi q STAFF USE ONLY lb I 63•3) '5oa.s° Special Conditions: Adjusted Valuation: l L/ 3�5 zo ISDS Fee: Setbacks: 1O6, (00 BL DEP cv-d-etai /44/D Plan Cheek Fee: 163,3) Total Fees: 665.8 _ OCC Group: Permit Fee: 1 Manu home Fee: Z51 2-5 Fees Paid: )6 3.31 APPROVAL DATE lA, Balance Due: BP &Issue Date: 5oz.s'o -1 5st Const Type: g Mise Fees: Z j( peygf-r z51. 7-5 see ISDS No & Issued Date: PLNG DEP : / AP ROVAL DATE GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTEDFOR ALL APPLICATIONS. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. 1 Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be in compliance with the 2009 IBC, IPC, IMC, IFGC, and IFC, 2009 IECC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes / 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project ./_ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the pro perty? Yes .7 4. Have you provided any RESOLUTIONS and/ or LAND USE PERMIT(S) associated with this property? Yes / if Yes please provide a COPY. No Aja) 4 • d 5. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessary for this project 6. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes Not necessary for this project / 2 7. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Yes Not necessary for this project 7 8. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes _ _ Not necessary for this project 9. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and ea h? Yes Not necessary for project 10. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? .l Yes Not necessary for this project 11. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds er square foot in Garfield County)? Yes Not necessary for this project 12. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes Not necessary for this project 13. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes Not necessary for this project 14. Is the wind speed and exposure design included in the plan? Yes Not necessary for this project 15. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes / Not necessary for this project 16. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes / Not necessary for this project 3 1.7. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes /- Not necessary for this project 18. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes Not necessary for this project_/ 19. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes Not necessary for this project / 20. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes Not necessary for this project / 21. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes Not necessary for this project 22. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes Not necessary for this project 23. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this project / 24. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes Not necessary for this project_ 25. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes Not necessary for this project 26. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes Not necessary for this project 4 27. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes Not necessary for this project / 28. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes Not necessary for this project / 29. Have two (2) complete sets of construction drawings been submitted with the application? Yes 30. Have you designed or had this plan designed while considering building and other construction code requirements? Yes / 31. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes / 32. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 3-301 in the Garfield County Zoning Resolution for setbacks. Yes 33. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes / 34. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes 7 35. Are you aware that you are required to call for all inspections required under the IBC including approval on. a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes / 36. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes 5 37. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 888.868-5306. Yes / 38. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re -inspection fee? Yes / 39. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including a Notice to Proceed; a permit from the federal government or any combination.' You can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies Yes / 40. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes / 41. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes . / 42. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes / (Please check with the building department about this requirement) 43. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes Not necessary for this project 44. Did an Architect seal the plans for your commrcr the IBC to prepare the 4}ions and projectLaw requires any commercil with occupancy of more than 10 persons asper Section 1004 of specifications for the project. Yes Not Necessary for this project 45. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building permit application will be accepted without such a letter. Yes 6 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Date Phone: 970 (0X 5731- (days); (evenings) Project Name: t,v\, r Project Address: 16266:'9 ACU 4-.24- Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. bpminrepcommJun20 1 0 7 Building Plan Review Description of Work: storage/ carport for equipment. Bin #: Location Address: 16599 HWY 6 & 24 Rifle, CO 0E General Information Case Manager: David Bartholomew Plan Case Number: BLDG -11-10-6666 Parcel: 217325300035 Application Date: 11/30/2010 Owner: Douglas & Beverly Teter Applicant: Douglas & Beverly Teter Applicant Phone: 970-625-5734 Email i Building V /OP r Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List Minimum Application Questionnare Subdivision Plat Notes Fire Department Review /4 Valuation Determination/Fees Red Line Plans/Stamps/Sticker Attach Conditions Application Signed Plan Reviewer To Sign Application Parcel/Schedule No. 40# Snowload Letter - Manu. Homes Soils Report Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Flood Plain Building height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues N/4 Subdivision Plat General Comments: Pevreko Pee-- Pe/441f e e- pe»1Lf-dee Pei Pet rnr/i-t-- A- + Piot /YfZo 163, 31 ZS/. ZS Z5'1• zS 6,S-",91 /63. �t /4'4A)- T>lice = 3 D Z, �S O