HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLM F-08-L9-5905 a nd SEPT-09-L9-5906
Joel & Cindy Fischer
New Manufactured Home over Unfinished Basement
TBD County Road 3L7 - Rifle, Colorado
Beaver Creek Highlands, Lot 3
L) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING
(c.D.o.H.) AND ALL FACTORY-BUtLT STRUCTURES TNSTALLED lN GARFTELD COUNTY SHALL
COMPLY WITH C.D.O.H. GUIDELINES FOR MANUFACTURE & INSTALLATION AT THE JOB SITE.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY',S BUILDING REQUIREMENTS AND
DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS.
3) BUtLDtNG PERMtT tS TSSUED FOR MANUFACTURED STNGLE-FAMTLY RESIDENCE INSTALLED
OVER UNFINISHED BASEMENT. PROVIDE 36,, x 80,, MIN. SIZE EGRESS DOOR AT BASEMENT
UNFINISHED BASEMENT REQUIRES INSTALLATION OF FIRE PROTECTION BARRIER AT
UNDERS|DE OF FLOOR FRAMTNG (u2" GYP. BOARD OR 5/8" WOOD STRUCTURAL PANELS)
PER t.R.C., SEC. R302.1-3.
4l SUBSEQUENT tNTERIOR FtNtSH AT BASEMENT REQUIRES ADDTTIONAL BUILDING PERMIT,
AND ITEMS #25_29 LISTED ON PLAN ATTACHMENTS WILL APPLY.
5) ALL pLUMB|NG AND GAS ptptNc CONNECTTONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
6) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY STATE OF COLORADO ELECTRICAL BOARD.
ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION &
CERTI FICATE OF OCCU PANCY.
7l sEpTtc sysTEM MUST coMply wtTH ALL DESIGN CRTTERIA - INCLUDING MINIMUM
SETBACK DISTANCES - PER GARFIELD COUNTY'S ON-SITE WASTEWATER TREATMENT
SYSTEM (O.W.T.S.) REGULATIONS.
8) GARFTELD COUNTy BUtLDtNG DEPT. TNSPECTTONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS
B. FOUNDATION
C. DECK/ROOF FRAMING & GUARDRAILS AT COVERED DECKS
D. SEPTIC SYSTEM
E. PLUMBTNG/GAS
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
* NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.