Loading...
HomeMy WebLinkAboutCorrespondenceMail - Andy Schwaller - Outlook <! Reply all t oelete S "tunt Block Page I of I Re: lExternal] 15 Cliffrose, Glenwood Springs Building Permit Julian Hardaker <Julian@thebestwayhome.c ó b <g +om> Tue 1A/2212A19 9:37 AM Andy Schwaller V Hi Andy, I have left a message for hp geotechnical to get report. We'll get it over to you as quickly as possible. Julian www.TheBestWayH o me.co m On Tue, 22 Oct 2019, 09:32 Andy Schwaller, < aschwaller@garfield-county.com > wrote: Julian, We just started to review the above for a single family home. lt appears the existing soíls as per the soil report needs to be first over excavated and then replaced with a structural fill. Prior to the foundatíon inspection by the county, a report from the soil engineer will need to be submitted to the building department to verify the structural fill was installed correctly and that the subgrade is ready for any concrete placement' Please call if you have any questions. Thanks, Andy Schwaller Building Official Garfield County JH https:i/outlook.office. comlmatlldeeplink?version:2019101401.13&popou6t2:1 r012212019