Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-09-L9-5953 Edward Gibson New Single-Family Residence TBD Golden Bear Drive, Carbondale Fairways at Aspen Glen - Lot 6 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E'C.C.) 2l tMpRovEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE ATTACHED ,.GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OpEN-HOLE SOTLS REPORT REQUTRED AT FOOTING INSPECTION TO VERIFY 3000 PSF 4l ENT|RETY OF STRUCTURE SHALL BE LOCATED INSIDE THE PLATTED BUILDING ENVELOPE. AT FOUNDATION INSPECTION PROVIDE A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, VERIFYING THAT THE STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH GARFIELD COUNTY,S BUILDING ENVELOPE REQUIREMENTS. 5) A BUtLDtNc HETGHT ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY COMPLIANCE OF AS-BUILT ROOFS WITH GARFIELD COUNTY,S 25-FEET MAXIMUM BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE & DEVELOPMENT CODE. 6) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRICAL BOARD, ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY