Loading...
HomeMy WebLinkAboutScope of Work - InsulationEnergyPro Insulati*rl, Tn*" 912712019 Ion Todd Jons custom wood working 4il CR261 Silt Co, 81652 PO Box 2(ñ6, Grand.lutrction, CO 81 502 Office 970-623-7327 jontoddbja@gmail.com 80r-645-2574 RE:Corey Addition rev 1 w to fumish and install the ofWork 'Work Options Acæpbnæ: Cmtractormaychâìgemd/uwithdmwllisagreermtifc@tactdd6rctræeiveyotsignedâfteptañcewiftinl0buinffidaysafurtlrcdatelidedabove Tflm of Paymflt COD urless priu pa1mflt mgmts üe nuke between Cutmq üd Contractor. you sign tiis agment. If perfomæ of this agrffiilt extflds beyond lhme 90 &ys, you agree lo pay CantËctü's tho mflt prícíig fu the Wo* perfored aftø those 90 days Respectfully Submitæd: Reviewed and Accepted Work Area NotesR-Value Material Ceiling Area Flat Install to the ceiling area. þoly and blow) R-38 Loose-fill Fiberglass ExteriorWalls Installed to the exterior walls of the house addition R-21 Unfaced Fiberglass Batt Crawl space subfloor Install to the crawl space sub-floorR-30 Unfaced fiberglass batt Penetrations Per Code Fire rated foam installed into electrical & plumbing penetrations percode. Includes low expanding foam to all windows & doors, and white caulking installed to the bottom of windows only when needed. Air Infiltration Fire Foam Cardboard baffles installed into every truss bay ateaves for attic ventilation. Ventilation Baffle (Cardboard) Ceiling Area FlatAir Infiltration Install to the flat ceiling Í¡s a vapor barrier 6 mil Poly Ceiling Area FlatAir Infiltration 6 mil black poly sealed to foundation wall and all seams laooed and slued. 6 mil Poly Crawl space FloorAir Infiltration ExteriorWalls Installed to the exterior walls of the house addition. Air Infiltration 4 mil Poly R-Value Material Work Area Notes For the additional sum of: R.-24 Dense Pack Fiberslass ExteriorWalls Upgrade to Dense Pack in lieu of R-21 -R-49 Loose-fill Fiberslass Ceiling Area Flat Upgrade to R-49 in lieu of R-38 - Matt Gibson Customer Date Page I of1