Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-09-L9-s931 Nathan & Becky Schaeffer Warehouse/Storage & Office Building 2456 County Road 301- Parachute, Colorado L) ALL WORK SHALL COMpLy W|TH THE 2015 TNTERNATIONAL BUILDING CODE (l.B.C.) 2015 TNTERNATTONAL FtRE CODE (r.F.C.)AND MANUFACTURER',S INSTALLATION SPECIFICATIONS. WORK SHALL ALSO COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNW',S COMMERCIAL BUILDING REQUIRE- MENTS & INSPECTIONS POLICIES. 3) WORK SHALL COMply WtrH REQUTREMENTS OF "RURAL" ZONE DISTRICT AS PER GARFIELD COUNTY,S LAND USE & DEVELOPMENT CODE, AND ALL CONDITIONS OF THE CURRENT LAND usE CHANGE pERMtT (MtpA-04-12-72L4. SEPTTC SYSTEM SHALL COMPLY WITH GARFIELD CO U NTY,S O N-SITE WASTEWATE R TR EATM E NT SYSTE M REQU I R EM E NTS. 4l BUtLDtNc ts AppRovED AS NON-SPRtNKLERED, CONSTRUCTION TYPE ll-B (NON-COMBUSTIBLE) WITH NON-SEPARATED USES AS FOLLOWS: "MODERATE-HAZARD STORAGE" (GROUP S-1)AND ,,BUStNESS" (cROUp'8")OCCUpANCtES. MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE & coMBUST|BLE MATERTALS pER 20L5 t.B.C., SECTIONS 4ß14I4 AND 2009 l.F.C. CHAPTER2T. 5) CONTACT LOCAL FtRE D|STRTCT FOR REVIEW AND APPLICABLE l.F.C. REQUIREMENTS. FIRE DISTRICT'S FINAL APPROVAL REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CE RTI FICATE OF OCCU PANCY. 6) OPEN-HOLE SOILS REPORT lS REQUIRED AT FOOTING INSPECTION, 1500 PSF. 7) ALL HtGH STRENGTH BOLTTNG AND FTELD WELDING REQUIRES SPECIAL INSPECTOR PER SPECIAL INSPECTIONS PROVISIONS OF I.B.C., CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 8) ALL EGRESS DOORS SHALL MEET |CC/ANSI 4L17.1-2009 FOR ACCESSIBILITY. LOCKS, LATCHES & LANDINGS PER I.B.C., SECTION 1008. VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH-IN INSPECTION. 9) BUtLDtNG SHALL COMply W|TH ACCESSTBILITY REQUTREMENTS PER LB.C., CHAPTER 11AND tcc/ANst AtL7.L- 2009 tNCLUDtNG pARKtNG, SrrE ACCESS, ENTRANCES/EGRESS & RESTROOMS. BATHROOM FACILITIES TO MEET MINIMUM REQUIREMENTS FOR SIZE, LAYOUT, CLEARANCES, FEATURES, ETC. 10) MECHANTCAL/HEAT|Nc SYSTEMS SHALL COMPLY WITH l.M.C. AND LE.C.C. - SECTION s03. MECHANICAL ROUGH-IN INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION. 11) pLUMBtNc SHALL COMply W|TH t.P.C. & r.F.G.C. REQUIREMENTS, AND ROUGH-lN INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION. L2) oN-stTE WASTEWATER TREATMENT SYSTEM SHALL BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER,S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. L3) LrGHT & VENTILATION AS PER LB.C., CHAPTER 12. 14) ELECTRTCAL pERMtTTtNG & TNSPECTTONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL APPROVAL IS REQUIRED PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.