HomeMy WebLinkAboutHigh Strength Bolt Inspection ReportsWEST SLOPE TESTING & INSPECTION LLC 3177 Glendam Dr Grand Junction, CO 81504 Phone: 970'434'6988 Cell: 970-260-2844 6-26-18 Page 1 of 1 Garfîeld County Building Inspection Dept. l08 8th St., Suite 4ol Glenwood Springs, CO 81601 Please find enclosed special inspection progress reports for Ensign residence & Orchard Creek Ranch project. Thank You; Doug Young 'West Slope Testing & Inspection LLC 3177 Glendam Dr. Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-260-2844 Report #10 Page 1 of I Insp ection Report I)ate: 5-30-18 Project: Orchard Creek Ranch LLC Address: 156 County Rd. 137 Garfield County, CO Buitding Permit No: BLRE -10-17 -497 3 General Contractor: Doug Hayes Construction Contractor that Performed Work: Sopris Steel of fabrication or fïeld work at ob site: Field Report:inspected the joint penetration at the steel beam to column rhoment connections at approximately grid lines 4,6,F-2, and O @ t1.Above inspections included verification of welder qualifications, use of ñop.r welding eiectrodes/materials, and the random observations ofjoint preparation & root pass welds (Note, the completed weld passes should be inspected atalater date when welds are completed). The field welding inspected above appeared to be in substantial conformance with the plans, andthe qualrty requirements of the A\MS Dl.1 Structural V/etrding Code. Further inspections will need to be performed on the remainder of the project. E. Young #51 Inspector/Technician: Douglas E Young Inspector Inspector , ,,r,.,,o Douglas E yoLing j ..' íiwl 96fl7t l31'i.,.n'' clÕI Ð(P. 71112Ð?-t , 'West Slope Testing & Inspection LLC 3L77 Glendam Dr. Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-260-2844 Report #9 Page I of 1 Inspectio n Report Dates:. 5-14-18 & 5-16-1 8 Projecfi Orchard Creek Ranch LLC Address: 156 County Rd. 137 Garfield County, CO Building Permit No: BLRE -10-17 -4973 General Contractor: Doug Hayes Construction Contractor that Performed Work: Sopris Steel of sho fabrication or field work at site: Field Report: Vi compl ete joint penetration at the beam to column rhoment connection grid MJLZ. Above inspections included verification of welder qualifications, use of proper welding electrodes/materials, inspection of j oint preparation, inspection of the root pass welds, and inspection of some of the intermediate weld pass layers.Also visually inspected cap pass welds at the tube steel beam to column moment connections grids 12 to 20 that were not completed during the last inspection visit on 4-4-18, field fillet welding at plate type steel beam to column moment connection grid 116, fieLd welding at LVL buckelboot to steel column gttdVlz, and inspected high strength A325 bolting at the steel beam & column connections grids 6 to 12. Onsite welding & high strength bolting inspected above was at the steel framing roof level. 1.ne net¿ welding & high strength bolting inspected above appeared to be in substantial conformance with the plans, and the quality requirements of the AWS D1.1 Structural \Melding Code & the AISCIRCSC Specification for high strength bolting. Further inspections will need to be performed on the remainder of the project. DouglasE. young #s\0222 Inspector/Technician: Douglas E Young Inspector Douglas Ë r:vvl côt7ii131 clcl ËxP. 7t'U2t2ú ..f\ ,,/'1,:i:.1'.9r,. ¡..:¡liùrl '':. ,t/ : ,iìl Inspector West Slope Testing & Inspection LLC 3177 Glendam Dr. Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-26A-2844 Report #8 Page 1 of 1 Insp ection Report I)ate: 4-4-18 Project: Orchard Creek Ranch LLC Address: 156 County Rd. 137 Garfield County, CO Buitding Permit No: BLRE-I 0-1 7 -4973 General Contractor: Doug Hayes Construction Contractor that Performed Work Sopris Steel of fabrication or field work at ob site: Field Report: Visually complete j penetration welding at steel beam to column moment connections. Above inspections included verification of welder qualifications, use of proper welding electrodes/materials, joint preparation (at the beginning of the welding), and a visual inspection of the root pass welds. Note; a final visually inspection of the completed welds should be performed at a later date, as the welding was not completed when I had to leave the site. Also visually inspected fietd fillet welding at tube steel beam connections, bracing connections, and inspected high strength A325 bolting at steel beam & column connections. Welding & bolting inspected above was at the steel framing main/upper floor level to roof level grids 12-20. The field welding & high strength bolting inspected above appeared to be in substantial confonnance with the plans, ffid the quality requirements of the AWS Dl.1 Structural Welding Code & the AISC/RCSC Specification for high strength bolting except as noted below. 1) \Melded steel plate washers had been placed/welded over holes that had to be slotted/oversized to allow for bolt alignment at two of the steel beam connections roof framing. Please veriff acceptance with the structural engineer, as the special inspector is not suppose to approve connection changes. Further inspections will need to be performed on the remainder ofthe project. Douglas ^8.Young #51 Inspector Inspector üouglas Ë Yeung cwt 9Gü70131 ec1 EXP.7n!2424 ' t'' a. ':? './ Inspector/Technician: Douglas E Young West Slope Testing & Inspection LLC 3177 Glendam Dr' Grand Junction, CO 81504 Phone: 970-434'6988 Cell: 970-260-2844 Report #1 Page 1 of 1 I n ort tes:'I Project: Ensign Residence Address: 683 Overlook Dr. Garfield County, CO Building Permit No: BLRE-08-1 7-4868 General Contractor: Thunder Construction Contractor that Performed Work: Sopris Steel fabrication or field work at ob site: -18 of Report:Visually inspected at beams & columns plece lcl,3c2, 5C2, 5:C3, 5C4, 6Cr,6C2, 6C3, 6C4, 7 Cl, 7 C2, 7 C3, 9B 1, 982, 983, 1081, 10F.2,1083, and 1181. Thewelding inspected above appeared to be in substantial conformance with the plans, and the quuiity r.q,.rirements of the AWS D1.1 Structural \Melding Code'' Further inspections shóuld be performed, as work progresses on the project' DouglasE.Young Certifrcation #sr02224 fnspector/Technician: Douglas E Young &Inspector lnspector Ðouglas F Youngcwt 96070131 QCl EXP. 7!1t2t20