Loading...
HomeMy WebLinkAboutEngineer's Field Report - Excavation Observation 09.18.2018Job: ODDO ENGINEERING, INC. FIELD REPORT #1 Vaughan Storage Addition 259 County Road 320 Rifle, Co Project No.: 1821-02 Date: September 18, 2018 Location: Job site Present: Ted Vaughan, Vaughan Construction Claire Jacobi: Oddo Engineering oddo engineering Field Observation Notes: The excavation for the footings were complete and the rebar for the footings were installed. The dowels from the pilasters and stem walls were installed. Ted indicated that footings 4 and 5 will be poured when the walls are poured. The footing reinforcing appears to be ready for the concrete pour this afternoon. Please let me know if you have any additional comments of questions. Best Regards, Claire Jacobi, PE/SE Oddo Engineering 713 Cooper Avenue ♦ Suite 200 • Glenwood Springs, CO 81601 (970) 945-1006 • Fax (970) 945-2966 • E -Mail bob@oddogws.com