HomeMy WebLinkAboutCorrespondenceDave Argo
From:
Sent:
To:
Dave Argo
Monday, February 11,2019 4:04 PM
'David Rasmussen'
Amended Plans for West RimledgeSubiect:
David:
I have reviewed your proposed Amended plans for the West Rimledge project (both units), but before we can approve
these proposed changes we need to receive additional information. More specifically, whenever a manufactured
housing unit has anything of a structural nature altered or added on to it, we require that a Structural Engineer
(Colorado licensed P.E.) sign-off on those changes to the manufactured unit.
ln this case, we need to have an Engineer review & wet-seal the following items:
L. Shed Roofs above Entrv Doors - These shed roof dormers located on the north side of the ADU create
asymmetrical loading on top of the CDOH approved unit, and they need to be reviewed & detailed by an
Engineer to verify that they don't cause undue burden on the manufactured unit's roof structure. There also
needs to be better explanation and information about what exactly the "frame" as illustrated on the North
Elevation consists of. ls this a steel frame structure? ls it affixed to the exterior wall, or does it rests on a
footing? Please provide additional information that clarifies design intent.
2. Sunshades - The steel frame structure for these proposed sunshades requires additional detailing from an
Engineer to substantiate that this structure is supported adequately. Again, a P.E. must sign-off that the
modular building will support the sunshade structure, and also needs to confirm Head-Loc screws (as detailed)
will actually support the weight of the steel frame structure. lf not, provide alternate detailing to support the
sunshade structure.
Please provide us with the required Engineering of these items at your earliest convenience so that we can finalize our
review ofthese proposed changes.
Thanks,
Dave Argo
Plans Examiner
Garfitlel Coanty
Commun¡ty Development Department
708 8th Street, Suite 407
Glenwood Springs, CO 81601
Tel: 970-945-8272 Ext. 1610
E m o i I : d a rg o @ g o rf i e I d -co u nty. co m
W e b : g a rf i e I d -co u nty. co m
1
GørÍteld County
COMMUNITY DEVELOPMENT
Street, Suite 401, Glenwood Springs, CO 81601
Tel: (970) 945-8212, Fax (970) 384-3470
BUIL DING PLANS SUBMITTAL
tr lnformation Requested by Plans Examiner
I lnformation Requested by lnspector
S Revisions to Approved Plans
BUTLDTNG pERMtr #ßi¡ßE---OL-l A - axlU!/
Description of work, including changes to approved plans:
RECE,VED
FEfJ u 4 ïttg
,-üUNTy
VELOPMEf{T
Gontact Information:
Contact Name lùarrnJ ITFSON
Job Address
Cell
\r
Phone:
E-mail.
Plan Review Fee: 65o.oo per hour)
Logged by tu_l
Andy Schwaller
From:
Sent:
lo:
Cc:
Subject:
Andy Schwaller
Wednesday, January 02,20t9 2:03 PM
'David Rasmussen'
Matt Provost
RE: Rimledge Lot 3lLC Survey
Thanks David. Matt will add it to the file. Just for clarification, the Tree House is not a code compliant dwelling unit. We
do not care if it is used as a play house kind of a thing, but it should not be used as a rental unit, living unit or VRBO'
Andy
From: David Rasm ussen Imailto:david @davidrasmussendesígn.com]
Sent: Wednesday, January 02,2OL912:36 PM
To: Andy Schwaller <aschwaller@garfield-county.com>; mprovoatr@garfield-county.com
Cc: Kate Schwerin <Kateschwerin@gmail.com>
Subject: Rimledge Lot 3 ILC SurveY
Hi Gentleman,
Attached is the ILC showing the buildings are within the building envelope and the driveway encroachment
onto lot 2 is within the 15' granted by the easement.
Thanks
Dave
David Rasmussen
VR Cabinetmakers I PRINCIPAL
826 C Hwy 133 Carbondale CO 81623
david@vrcabi net. com I cell 802.236.267 7
Follow us on Instragram!
htto ://instagram. com/davidrasmussendesi gn/
I
Dave Argo
From:
Sent:
To:
Cc:
Subject:
Attachments:
David Rasmussen < david@davidrasmussendesign.com >
Friday, October 19,2018 1:17 PM
Dave Argo
Kate Schwerin; Lindsay Krol
Re:West Rimledge - Lot 3 CMH Mfd. Home
Rimledge Soils Report.pdf
Hi Dave,
Thanks for the through review and note about the septic tank. I have attached the soils report here. In regards
to the perc test, we would like Garfield County to do the test and engineer the septic system. We are ready to
do a perc test and get the engineer going and would like to do so as soon as possible. V/ho should I contact to
get that scheduled?
Thank you,
Dave
On Fri, Oct 19, 2018 at 12:08 PM Dave Argo <dargo@garfield-co > wrote
Kate & David
Thanks for updating a couple of items regarding your building permit application per our request yesterday
As I am now finalizing my review of plans, I came across a couple of plat note requirements which must be
addressed before we can issue permits for this project (please see attachment).
As you can see, we need to receive a copy of the site specific soils report including perc test results for the
septic system before we can finish our plan review. Please submit a digital copy of the soils report at your
earliest convenience so that we can finalize our approvals and issue permits.
p.s. Also please note that required minimum size of a septic tank for seven total bedrooms (both residences) is
2,000 gallons - not the 1,500 gallon size as shown on your site plan. This is already redlined on the plans, but
wanted to make sure that you are aware of this requirement which comes from Garfield County's O.W.T.S.
regulations.
Thanks,
1
Dave Argo