HomeMy WebLinkAboutInsulation Compliance CertificateLTJ
Project
Energy Code:
Location:
Construction Typ
Project Type:
Climate Zone:
Permit Date:
Permit Number:
REScheck Software Version 4.63
Compliance Certificate
Haschke Patio Enclosure
2009 IECC
Parachute, Colorado
e: Single-family
Addition
5 (6881 HDD)
Construction Site:
107 Columbine Lane
Parachute, CO 81635
Owner/Agent:
Anthony Haschke
SGM
107 Columbine Lane
Parachute, CO 81635
970-384-9070
tonyh@sgm-inc.com
Designer/Contractor:
Anthony Haschke
SGM
118 W 6th Street Suite 200
Glenwood Springs, CO 81601
970-945-1004
tonyh@sgm-inc.com
Compliance: Passes using UA trade-off
Compliance: 0.6% Better Than Code Maximum UA: 164 Your UA: 163
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R -Value
Cont. U -Factor
R -Value
UA
Ceiling 1: Cathedral Ceiling
North: Wood Frame, 16" o.c.
Window 1: Wood Frame:Double Pane with Low -E
Door 1: Glass
West: Wood Frame, 16" o.c.
East: Wood Frame, 16" o.c.
Door 2: Glass
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 2.0'
190
161
16
16
32 21.0
90 21.0
20
164
38.0
21.0
0.0 0.027
0.0 0.057
0.350
0.350
0.0 0.057
0.0 0.057 4
0.350 7
10.0 0.767 126
5
7
6
6
2
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
Reck Version 4.6.5 and to comply with t e mandatory requirements listed in the RES k pection Checklist.
Nam?Till e
re,e;:oet_r/a,rilizevirr
Signa
Date
Project Title: Haschke Patio Enclosure Report date: 04/22/19
Data filename: I:\2019\2019-203-HaschkeRes\001\B-Calcs\Haschke.rck
Page 1 of 7