Loading...
HomeMy WebLinkAboutState Final Electrical Inspection ReportJim Wilson HiJim, per your request, we have attached the final inspection from the State Electrical lnspector for the Town of New Castle WTP Also, I will be forwarding you a link to the as built drawings that were completed for the plant as well' Finally, as per our discussion, the Town (through SGM) provided inspections on the proposed construction performed by Mueller Construction for the plant. We had Ground Engineering providing materials testing on the project as well as we provided constant observation. All work performed was constructed in accordance to our plans and specifications. Let me know if you need anything else in this regard Thanks! Jeffery S. Simonson, PE, CFM Principal From: Sent: To: Subiect: Attachments: 2TJ5 W/NNE'ñJ (- {) t. r r i\11L. n I t){} Jeff Simonson <JeffS@sgm-inc.com > Thursday, November 07,2019 L:54 PM Jim Wilson lExternall New Castle WTP Inspection Report Town of New Castle.pdf SSGM I l8 W Sixlh Sl, Suite ?t0 Glenwood Springs, Ce t1óül 970.384"ç005 / qzo3Vq"4å?1 cell www. sg rn" in c. {{1t?'x ã 1 COLORADO STATE ELECTRICAL BOARD INSPECTION REPORT / CORRECTION NOTICE Contractor/HomeOwner: Address: Type of lnspection: Action: Ridge Electric LLC 181 Shoshone Tr. Final Accepted Gomments or Corrections: 181 Shoshone Trail street address Inspectors Name: Norman Feck PhoneNumber: 303-869-3442 Date:07-JUL-17 Date Received: 06-JUL-1 7 Permit Number: 810542 https://www.dora.state.co.us/pls/realÆp-V/eb-Inspection-GUl.Process-PageInspection Report COLORADO STATE ELECTRICAL BOARD DEPARTMENT OF REGULATORY AGENCIES 1560 BroadwaY Suite 1350 Denver, Colorado 80202 Phone: (303) 894-2985 I of I 10/3012019,2:15 PM